Statement of Work
Updated
A PDF document (359 KB) attached to FY27 42SFS CATM Range Cleaning, from the Department of the Air Force. Due Oct 28, 2026, 12:00 PM (UTC-5).
File name: Statement of Work.pdf
The full file is for paid members, or buy this bid alone.
Preview
Statement of Work (Draft)
42SFS CATM Range Cleaning
1.0 SCOPE
This Statement of Work (SOW) defines the requirements for a contractor to provide all necessary labor, supervision, and materials to perform initial and recurring cleaning and maintenance services for the 84-point Combat Arms Firing Range at Maxwell AFB. The objective is to ensure the facility is cleaned of hazardous materials in compliance with all applicable regulations and to maintain the operational readiness of the range equipment. The scope includes cleaning of the range, maintenance of specified equipment, and proper management and disposal of all generated waste.
2.0 REQUIREMENTS
The contractor shall perform the following tasks to meet the government's requirements.
2.1 General System Requirements
The 84-point firing range must be cleaned and maintained to be free of hazardous materials, compliant with Civil Engineering and Bio-Environmental standards. Key government-owned equipment to be serviced includes:
•
•
•
Bullet Traps: Savage Range Systems (Model: 800D w/Auger) (x2) Dust Collection Units (DCU): Southern Air and Filtration Inc. (x2) Air Compressor: SpeedAire (Model: 35WC63)
2.2 Specific Tasks
2.2.1 Range Cleaning
The contractor shall:
2.2.1.1 Clean all debris and material in front of and inside the trough/throat of both bullet traps.
2.2.1.2 Perform a full HEPA vacuuming of each of the 84 firing positions, from the firing line to the backstop. This includes all horizontal exposed surfaces and any vertical surfaces likely to be touched or disturbed.
2.2.1.3 Pressure wash the entire concrete floor once per quarter. 2.2.1.4 Perform a D-Lead wipe-down of all horizontal and vertical surfaces likely to be touched after vacuuming.
2.2.1.5 Clean the concrete area surrounding the exterior of the air handling unit.
2.2.2 Equipment Maintenance
The contractor shall:
2.2.2.1 Perform standard servicing of the air compressor, which shall include draining, cleaning, checking oil levels, inspecting belts and filters, and repairing any air leaks.
2.2.2.2 Lubricate and grease the bullet trap auger systems and all applicable bearings. 2.2.2.3 Service the Dust Collection Units (DCUs) by removing, HEPA-vacuuming, and correctly reinstalling all filters. Replacement filters, if required, shall be Custom Made High Efficiency DCU Cartridge Filters (14.125” OD x 9.8” ID x 39” L, Nanofiber Pro Tura Media) or an approved equivalent.
2.2.3
Waste Management
The contractor shall:
2.2.3.1 Coordinate with the Maxwell Environmental Office prior to commencement of
The beginning of the document. Download the full file to read on.