Connect Maglocks to Fire Alarm System, Building 6040
7371394
DOCUMENT 01 90 00
SCOPE OF WORK
PART 1
1.1
GENERAL
GENERAL INTENTION
The intent of this work is installing fire alarm relay switch, connecting electrical security system to the fire alarm control panel, and incidental related work.
1.2
LOCATION
The work is located at MCAS Cherry Point, approximately as indicated. exact location will be shown by the Contracting Officer. 1.3
The
DETAILED REQUIREMENTS
Provide relay switch, and provide 16-2 control wire in 1/2 IN. EMT from electrical security system cabinet to relay switch. Connect ESS to fire alarm system from local FACU. Refer to NAVFAC Drawings 12939835-12939839 and Specification Section 28 31 76 attached to this scope of work. 1.4
SPECIAL SCHEDULING REQUIREMENTS
Have materials, equipment, and personnel required to perform the work at the site prior to the commencement of the work.
The building will remain in operation during the entire construction period. The Contractor must conduct his operations so as to cause the least possible interference with normal operations of the activity. Permission to interrupt any activity roads, railroads, or utility service must be requested in writing a minimum of 15 calendar days prior to the desired date of interruption and in accordance with section 1.10. 1.5
CONTRACTOR ACCESS AND USE OF PREMISES
1.5.1
ACTIVITY REGULATIONS
Ensure that Contractor personnel employed on the Activity become familiar with and obey Activity regulations including safety, fire, traffic, and security regulations. Keep within the limits of the work and avenues of ingress and egress. Wear hard hats in designated areas. Do not enter any restricted areas unless required to do so and until cleared for such entry. Mark Contractor equipment for identification.
1.5.1.1
SUBCONTRACTORS AND PERSONNEL CONTACTS
Provide a list of contact personnel of the Contractor and Subcontractors including addresses and telephone numbers for use in the event of an emergency. As changes occur and additional information becomes available, correct and change the information contained in previous lists.
SECTION 01 90 00
Connect Maglocks to Fire Alarm System, Building 6040
1.5.1.2
1.5.1.2.1
7371394
ADDITIONAL PERSONNEL REQUIREMENTS
GENERAL CONSTRUCTION AND FINISH WORK
General construction and finish work of the secure area must be performed by U.S. firms using U.S. citizens or U.S. Persons. General construction includes construction activities such as building sitework, utilities, foundations, structure, and enclosure or shell, including doors, windows,