Home / Shipboard Air Conditioning Plant System Sustainment Plan… / Document

Table 1 - Capability Certification Matrix

Updated

A Word document (17 KB) attached to Shipboard Air Conditioning Plant System Sustainment Plan (SSP), from the Department of the Navy. Due Nov 16, 2026, 3:00 AM (UTC-5).

File name: Table 1 - Capability Certification Matrix.docx

Download the full documentSee the bid

The full file is for paid members, or buy this bid alone.

Preview

Table SEQ Table \* ARABIC 1. Capability Certification Matrix *Do not edit the “Requirement” column.
Requirement
Current Capability
Method of Performance
Supporting Evidence
1. Major AC Plant Pit Stops: Ability to execute complete Major AC Plant Pit Stops throughout the fleet, including assessment and repair of the entire AC plant and in-place compressor overhaul, within a mandatory six-week window or less.

YES / PARTIAL / NO

Organic / Existing OEM or License / Subcontractor or Teaming Partner / Capability to be Developed Identify specific AC plant systems and configurations supported; locations; personnel; facilities; tooling; diagnostic/test equipment; compressor overhaul capability; number of comparable Pit Stops performed; and demonstrated ability to complete comparable work within six weeks or less. 2. Embedded AC&R Technical Expertise: Ability to provide an embedded AC&R technical expert at each designated Navy SIMA to provide Sailor training, technical assistance, and OEM-level oversight of SIMA-led Minor AC Plant Pit Stops executed within a mandatory six-week window or less.

YES / PARTIAL / NO

Organic / Existing OEM or License / Subcontractor or Teaming Partner / Capability to be Developed Identify available personnel, qualifications, geographic coverage, training experience, AC&R technical expertise, existing Navy support, and demonstrated ability to provide sustained embedded support at multiple locations. 3. AC Plant Materiel: Ability to provide OEM AC plant materiel, repair parts, components, and assemblies supporting all applicable Navy surface ship AC plant configurations.

YES / PARTIAL / NO

Organic / Existing OEM or License / Subcontractor or Teaming Partner / Capability to be Developed Identify specific Navy AC plant configurations currently supported; materiel sources; manufacturing or procurement capability; technical data required for sourcing; lead times; and demonstrated experience providing configuration-specific AC plant materiel. 4. Global Rotable and OPP Management: Ability to establish, warehouse, maintain, repair, manage, and globally distribute rotable AC plant components and Overhaul Parts Packages (OPPs) supporting Major and Minor Pit Stops.

YES / PARTIAL / NO

Organic / Existing OEM or License / Subcontractor or Teaming Partner / Capability to be Developed Identify warehouse locations, existing rotable inventories, OPP capability, inventory-management systems, repair/overhaul capability, transportation infrastructure, replenishment processes, and demonstrated global distribution capability.

The beginning of the document. Download the full file to read on.