Home / Navy / Other Aircraft Parts and Auxiliary Equipment Manufacturing / Notice

Chopper Assembly, Ed, in Repair/Modification of

Updated

Solicitation from the Department of the Navy. Due Nov 23, 2026, 2:00 PM (UTC-4), 27 days left.

Be among the first to see new Other Aircraft Parts and Auxiliary Equipment Manufacturing contracts
Only new notices that match, once a day.
Title as posted16--CHOPPER ASSEMBLY,ED, IN REPAIR/MODIFICATION OF
Solicitation numberN0038327RPA05
AgencyDepartment of the Navy
OfficeNAVSUP Weapon Systems Support
Notice typeSolicitation
Set-asideNone
Trade (NAICS)Other Aircraft Parts and Auxiliary Equipment Manufacturing (336413)
Product or service code1680
PostedOct 26, 2026
Response deadlineNov 23, 2026, 2:00 PM (UTC-4) (27 days left)
Add the deadline toGoogle Calendar · Apple / Outlook (.ics)
Official notice
Send to a teammate

Description

Repair Turnaround Time (RTAT) definition: The contractual delivery requirement is measured from asset Return to the date of asset acceptance under the terms of the contract. For purposes of this section, Return is defined as physical receipt of the F-condition asset at the contractor's facility as reflected in the Action Date entry in the Commercial Asset Visibility (CAV) system.

In accordance with the CAV Statement of Work, the contractor is required to accurately report all transactions by the end of the fifth regular business day after receipt and the Action Date entered in CAV must be dated to reflect the actual date of physical receipt. The Contractor must obtain final inspection and acceptance by the Government for all assets within the RTATs established in the subsequent contract.

Required RTAT: ## 90 days after receipt of asset Throughput Constraint: Contractor must provide a throughput Constraint for each NSN(s). Total assets to be repaired monthly after initial delivery commences X/month (contractor fill in #). A throughput of ##____ per month reflects no throughput constraint.

Induction Expiration Date: 365 days after contract award date. Any asset received after this date in days is not authorized for repair without bi-lateral agreement between the Contractor and NAVSUP WSS Contracting Officer. Reconciliation:A reconciliation modification will be issued after final Inspection and acceptance of all assets inducted under the subsequent contract.

The parties have agreed to a price (shown on the schedule page) for each unit at the negotiated RTAT. Such prices are based on the Contractor meeting the RTAT requirements described within the schedule page. If the Contractor does not meet the applicable RTAT requirement, consideration will be assessed and subject to negotiation.

All contractual documents (i.e. contracts, purchase orders, task ordersdelivery orders and modifications) related to the instant procurement are considered to be "issued" by the Government when copies are either deposited in the mail, transmitted by facsimile, or sent by other electronic commerce methods, such as email. The Government's acceptance of the contractor's proposal constitutes bilateral agreement to "issue" contractual documents as detailed herein.

Early and incremental deliveries accepted and preferred. 1. SCOPE 1.1 Articles to be furnished hereunder shall be repaired, tested and inspected in accordance with the terms and conditions specified in the Requirements Section of this document.

1.1.1 Any item contracted for repair SHALL have a Statement of Work to ensure compliance with all repair procedures and requirements. Repair of: CHOPPER ASSEMBLY,ED ;1680-016216686; NSN , ;3890AS000508-01; Part Number, Shall be performed IAW: CHOPPER ASSEMBLY,ED ;Repair/overhaul/inspect in accordance with applicable repair manual, technical specifications, engineering orders and drawings.; Publication (s).

1.1.2 There will be no repair deviation from the approved written procedures without review and acceptance by the Basic Design Engineer. All requests for Waiver/Deviation shall be via Form 1694 routed throught the Local DCMA/ACO office for review and recommendations via form 1998. 2. Applicable documents - not applicable 3.

REQUIREMENTS 3.1 1.0 GENERAL 3.1.1 This Statement of Work (SOW) establishes the criteria for repair and testing /inspection of the subject item. It includes inspection, component repair and replacement,reassembly and testing procedures required to return units back into a servicable condition. 3.2 2.0 DEFINITIONS.

3.2.1 CONTRACTOR: Is defined as the successful offeror awarded a contract, orderor issued a project work order. The term "contract" encompasses a contract, an order, or a project work order. 3.2.2 OVERHAUL: An overhauled part is one which has been disassembled, cleaned, inspected, repaired as necessary (by replacing or repairing all components which have been found to exceed limits established by the repair/overhaul manual) reassembled and tested in accordance with the approved repair/overhaul manual listed in this SOW and returned to a Ready for Issue (RFI) condition (Refer to contract schedule for items to be overhauled).

3.2.3 REPAIR: A repaired part is one which has been restored to a Ready for Issue(RFI) condition (by replacing or repairing those components found to be defective, broken, damaged or inoperative d

Clauses in this notice (21):

The description continues in the official notice.

Contracting contact

As published on the official notice. Ask questions in writing and before any questions deadline the notice sets.

Is your business small enough?

For NAICS 336413, a business counts as small if it has no more than 1,250 employees (SBA size standard, with exceptions in the notes). This notice is not set aside, but the size decides your small business status on it. SBA table, current as of Oct 15, 2026.

Notice history

Companies that win this kind of work

Federal contractors paid for other aircraft parts and auxiliary equipment manufacturing work, who also hold Navy contracts (last 12 months): possible competitors, or partners to team with.

About the buyer

The Department of the Navy awarded $132.1 billion in contracts in the last 12 months; its biggest suppliers were Electric Boat Corporation, Lockheed Martin Corporation and RTX Corporation. See what Navy is buying now.

Other Aircraft Parts and Auxiliary Equipment Manufacturing contracts right now

There are 638 open government contract opportunities in this trade (NAICS 336413), 274 posted in the last 7 days; 32% are set aside for small businesses. The agencies buying the most are Defense Logistics Agency, Department of the Navy and Department of the Air Force. Most of the work with a stated place is in Oklahoma, Virginia and Pennsylvania. A notice in this trade gives a median of 30 days from posting to deadline; this one gives 28 days.

All open other aircraft parts and auxiliary equipment manufacturing contracts

Coming up in this trade

Planned contracts from the agencies' procurement forecasts, often months before a solicitation. Plans can change.

Purchase Alta X Drone and Accessories
Department of the Interior
Acquisition Planning · Award FY 2026 · $5M - $9.9M · Other Than Small Business · Firm Fixed Price
Purchase Alta X Drone and Accessories
Department of the Interior
Exercise of Option · Award FY 2026 · $250K - $499K · Other Than Small Business · Firm Fixed Price
Aircraft Repair Parts Contractor Logistic Support
Department of Transportation
$5M - $9.9M · To Be Determined

Recent awards in this trade

From the award notices agencies publish.

Similar open other aircraft parts and auxiliary equipment manufacturing bids

Cylinder Block Unit, HY
Defense Logistics Agency
Due Nov 6, 2026 · 10 days left
Solicitation · Posted Oct 26, 2026
Windshield, Rh
Defense Logistics Agency
Due Nov 3, 2026 · 7 days left
Solicitation · Posted Oct 26, 2026
Support ASSY, Fairin
Defense Logistics Agency
Due Nov 3, 2026 · 7 days left
Solicitation · Posted Oct 26, 2026
Trailing Edge, Aircraft
Defense Logistics Agency
Due Nov 3, 2026 · 7 days left
Solicitation · Small business · Posted Oct 26, 2026
Support, Structural Com
Defense Logistics Agency
Due Nov 3, 2026 · 7 days left
Solicitation · Posted Oct 26, 2026
Swivel Joint, Hydraulic
Defense Logistics Agency
Due Nov 3, 2026 · 7 days left
Solicitation · Posted Oct 26, 2026