Home / Navy / Other Aircraft Parts and Auxiliary Equipment Manufacturing / Notice

Preamp, Mas, in Repair/Modification of

Updated

Solicitation from the Department of the Navy. Due Nov 24, 2026, 2:00 PM (UTC-4), 25 days left.

Be among the first to see new Other Aircraft Parts and Auxiliary Equipment Manufacturing contracts
Only new notices that match, once a day.
Title as posted16--PREAMP,MAS, IN REPAIR/MODIFICATION OF
Solicitation numberN0038326RBA54
AgencyDepartment of the Navy
OfficeNAVSUP Weapon Systems Support
Notice typeSolicitation
Set-asideNone
Trade (NAICS)Other Aircraft Parts and Auxiliary Equipment Manufacturing (336413)
Product or service code1680
PostedOct 29, 2026
Response deadlineNov 24, 2026, 2:00 PM (UTC-4) (25 days left)
Add the deadline toGoogle Calendar · Apple / Outlook (.ics)
Official notice
Send to a teammate

Description

This solicitation QTY is hereby decreased by 13 units from 21 units to 8 units. Repair Turnaround Time (RTAT) definition: The contractual delivery requirement Is measured from asset Return to the date of asset acceptance under the terms of the contract. For purposes of this section, Return is defined as physicalreceipt of the F-condition asset at the contractors facility as reflected in the Action Date entry in the Commercial Asset Visibility (CAV) system.

In accordance with the CAV Statement of Work, the contractor is required to accurately report all transactions by the end of the fifth regular business day after receipt and the Action Date entered in CAV must be dated to reflect the actual date of physical receipt. The Contractor must obtain final inspection and acceptance by the Governmentfor all assets within the RTATs established in this contract.

Required RTAT: 150 days after receipt of asset Throughput Constraint: Contractor must provide a throughput Constraint for each NSN(s). Total assets to be repaired monthly after initial delivery commencesX/month (contractor fill in #). A throughput of ##____ per month reflects no throughput constraint.

Induction Expiration Date: 365 days after contract award date. Any asset received after this date in days is not authorized for repair without bi-lateral agreement between the Contractor and NAVSUP WSS Contracting Officer. Reconciliation:A reconciliation modification will be issued after final Inspection andacceptance of all assets inducted under this contract.

The parties have agreed to aprice (shown on the schedule page) for each unitat the negotiated RTAT. Such prices are based on the Contractor meeting theRTAT requirements described within the schedule page. If the Contractor does not meet the applicable RTAT requirement, consideration will be assessedand subject to negotiation.

All contractual documents (i.e. contracts, purchase orders, task orders,delivery orders and modifications) related to the instant procurement areconsidered to be "issued" by the Government when copies are either deposited in the mail, transmitted by facsimile, or sent by other electronic commercemethods, such as email. The Government's acceptance of the contractor'sproposal constitutes bilateral agreement to "issue" contractual documents asdetailed herein. \ 1.

SCOPE 1.1 . Markings shall be in accordance with MIL-STD-130. 1.2 Articles to be furnished hereunder shall be manufactured, tested and inspected in accordance with ;Undersea Sensor Systems; drawing number ( ;1JGV5; ) ;5798-8000-001; , Revision ;latest since unknown; and all details and specifications referenced therein. 1.3 Unless expressly provided for elsewhere in this clause, equipment such as fixtures, jigs, dies, patterns, mylars, special tooling, test equipment, or any other manufacturing aid required for the manufacture and/or testing of the subject item(s) will not be provided by the Government or any other source and is the sole responsibility of the contractor.

The foregoing applies notwithstanding any reference to such equipment or the furnishing thereof that may be contained in any drawing or referenced specification. 1.4 If MIL-STD-454 is referenced in the drawings or in the specification, the contractor is expected to show compliance with IPC/EIAJ-STD-001C. 2. Applicable documents - not applicable 3.

REQUIREMENTS 3.1 1.0 GENERAL 3.1.1 This Statement of Work (SOW) establishes the criteria for repair and testing /inspection of the subject item. It includes inspection, component repair and replacement,reassembly and testing procedures required to return units back into a servicable condition. 3.2 2.0 DEFINITIONS.

3.2.1 CONTRACTOR: Is defined as the successful offeror awarded a contract, orderor issued a project work order. The term "contract" encompasses a contract, an order, or a project work order. 3.2.2 OVERHAUL: An overhauled part is one which has been disassembled, cleaned, inspected, repaired as necessary (by replacing or repairing all components which have been found to exceed limits established by the repair/overhaul manual) reassembled and tested in accordance with the approved repair/overhaul manual listed in this SOW and returned to a Ready for Issue (RFI) condition (Refer to contract schedule for items to be overhauled).

3.2.3 REPAIR: A repaired part is o

Clauses in this notice (21):

The description continues in the official notice.

Contracting contact

As published on the official notice. Ask questions in writing and before any questions deadline the notice sets.

Is your business small enough?

For NAICS 336413, a business counts as small if it has no more than 1,250 employees (SBA size standard, with exceptions in the notes). This notice is not set aside, but the size decides your small business status on it. SBA table, current as of Oct 15, 2026.

Companies that win this kind of work

Federal contractors paid for other aircraft parts and auxiliary equipment manufacturing work, who also hold Navy contracts (last 12 months): possible competitors, or partners to team with.

About the buyer

The Department of the Navy awarded $132.1 billion in contracts in the last 12 months; its biggest suppliers were Electric Boat Corporation, Lockheed Martin Corporation and RTX Corporation. See what Navy is buying now.

Other Aircraft Parts and Auxiliary Equipment Manufacturing contracts right now

There are 706 open government contract opportunities in this trade (NAICS 336413), 271 posted in the last 7 days; 36% are set aside for small businesses. The agencies buying the most are Defense Logistics Agency, Department of the Navy and Department of the Air Force. Most of the work with a stated place is in Virginia, Oklahoma and Pennsylvania. A notice in this trade gives a median of 30 days from posting to deadline; this one gives 26 days.

All open other aircraft parts and auxiliary equipment manufacturing contracts

Coming up in this trade

Planned contracts from the agencies' procurement forecasts, often months before a solicitation. Plans can change.

Purchase Alta X Drone and Accessories
Department of the Interior
Acquisition Planning · Award FY 2026 · $5M - $9.9M · Other Than Small Business · Firm Fixed Price
Purchase Alta X Drone and Accessories
Department of the Interior
Exercise of Option · Award FY 2026 · $250K - $499K · Other Than Small Business · Firm Fixed Price
Aircraft Repair Parts Contractor Logistic Support
Department of Transportation
$5M - $9.9M · To Be Determined

Recent awards in this trade

From the award notices agencies publish.

Similar open other aircraft parts and auxiliary equipment manufacturing bids

New Manufacture: Valve, Regulating, Fl / NSN 4810-01-123-7254 -OR- NSN 4810-01-282-7884
Defense Logistics Agency
Solicitation · Posted Oct 29, 2026
Head, Linear Actuati
Defense Logistics Agency
Due Nov 6, 2026 · 7 days left
Solicitation · Small business · Posted Oct 29, 2026
Jack, Hydraulic, Trip
Defense Logistics Agency
Due Nov 9, 2026 · 10 days left
Solicitation · Small business · Posted Oct 29, 2026
Servovalve, Hydraulic
Defense Logistics Agency
Due Nov 30, 2026, 4:00 PM (UTC-6) · 31 days left
Solicitation · Posted Oct 29, 2026
SPRRA127FA008
Defense Logistics Agency
Solicitation · Posted Oct 29, 2026
Amended FINAL RFP - Landing Gear Collaborative Supply Chain Integration II
Defense Logistics Agency
Due Mar 1, 2027, 5:00 PM (UTC-7)
Solicitation · Small business · Posted Oct 29, 2026