Home / Navy / Speed Changer, Industrial High-Speed Drive, and Gear Manufacturing / Notice

Transmission, Mechan, in Repair/Modification of

Updated

Solicitation from the Department of the Navy. Due Nov 3, 2026, 4:30 PM (UTC-4), 5 days left.

Be among the first to see new Speed Changer, Industrial High-Speed Drive, and Gear Manufacturing contracts
Only new notices that match, once a day.
Title as posted30--TRANSMISSION,MECHAN, IN REPAIR/MODIFICATION OF
Solicitation numberN0038326QPC10
AgencyDepartment of the Navy
OfficeNAVSUP Weapon Systems Support
Notice typeSolicitation
Set-asideNone
Trade (NAICS)Speed Changer, Industrial High-Speed Drive, and Gear Manufacturing (333612)
Product or service code3010
PostedOct 28, 2026
Response deadlineNov 3, 2026, 4:30 PM (UTC-4) (5 days left)
Add the deadline toGoogle Calendar · Apple / Outlook (.ics)
Official notice
Send to a teammate

Description

The purpose of this amendment is to extend the solicitation close date to 11/3/2026. One FFP unit price is required for this quote. // The purpose of this amendment is to extend the solicitation date to October,16, 2026. \ Repair Turnaround Time (RTAT) definition: The contractual delivery requirement is measured from asset Return to the date of asset acceptance under the terms of the contract.

For purposes of this section, Return is defined as physical receipt of the F-condition asset at the contractor's facility as reflected in the Action Date entry in the Commercial Asset Visibility (CAV) system. In accordance with the CAV Statement of Work, the contractor is required to accurately report all transactions by the end of the fifth regular business day after receipt and the Action Date entered in CAV must be dated to reflect the actual date of physical receipt.

The Contractor must obtain final inspection and acceptance by the Government for all assets within the RTATs established in the subsequent contract. Required RTAT: ## 90 days after receipt of asset Throughput Constraint: Contractor must provide a throughput Constraint for each NSN(s). Total assets to be repaired monthly after initial delivery commences X/month (contractor fill in #).

A throughput of ##____ per month reflects no throughput constraint. Induction Expiration Date: 365 days after contract award date. Any asset received after this date in days is not authorized for repair without bi-lateral agreement between the Contractor and NAVSUP WSS Contracting Officer.

Reconciliation:A reconciliation modification will be issued after final Inspection and acceptance of all assets inducted under the subsequent contract. The parties have agreed to a price (shown on the schedule page) for each unit at the negotiated RTAT. Such prices are based on the Contractor meeting the RTAT requirements described within the schedule page.

If the Contractor does not meet the applicable RTAT requirement, consideration will be assessed and subject to negotiation. All contractual documents (i.e. contracts, purchase orders, task ordersdelivery orders and modifications) related to the instant procurement are considered to be "issued" by the Government when copies are either deposited in the mail, transmitted by facsimile, or sent by other electronic commerce methods, such as email.

The Government's acceptance of the contractor's proposal constitutes bilateral agreement to "issue" contractual documents as detailed herein. Early and incremental deliveries accepted and preferred. 1.

SCOPE 1.1 Articles to be furnished hereunder shall be repaired, tested and inspected in accordance with the terms and conditions specified in the Requirements Section of this document. 1.1.1 Any item contracted for repair SHALL have a Statement of Work to ensure compliance with all repair procedures and requirements. Repair of: TRANSMISSION,MECHAN ;3010-123915959; NSN , ;110900; Part Number, Shall be performed IAW: TRANSMISSION,MECHAN ;Latest; Publication (s).

1.1.2 There will be no repair deviation from the approved written procedures without review and acceptance by the Basic Design Engineer. All requests for Waiver/Deviation shall be via Form 1694 routed throught the Local DCMA/ACO office for review and recommendations via form 1998. 2. Applicable documents - not applicable 3.

REQUIREMENTS 3.1 1.0 GENERAL 3.1.1 This Statement of Work (SOW) establishes the criteria for repair and testing /inspection of the subject item. It includes inspection, component repair and replacement,reassembly and testing procedures required to return units back into a servicable condition. 3.2 2.0 DEFINITIONS.

3.2.1 CONTRACTOR: Is defined as the successful offeror awarded a contract, orderor issued a project work order. The term "contract" encompasses a contract, an order, or a project work order. 3.2.2 OVERHAUL: An overhauled part is one which has been disassembled, cleaned, inspected, repaired as necessary (by replacing or repairing all components which have been found to exceed limits established by the repair/overhaul manual) reassembled and tested in accordance with the approved repair/overhaul manual listed in this SOW and returned to a Ready for Issue (RFI) condition (Refer to contract schedule for items to be overhauled).

3.2.3 REPAIR: A repaired part is one which has been restored to a Ready for Issue(RFI) condition (by replacing or repairing those components found to be defective, broken, damaged or inoperative during the initial evaluation and troubleshooting phase) and tested in accordance with the approved repair/overhaul manual listed in this

Contact: N762.43 · P2R · 771-229-0536 · [email protected]

Clauses in this notice (15):

The description continues in the official notice.

Contracting contact

As published on the official notice. Ask questions in writing and before any questions deadline the notice sets.

Is your business small enough?

For NAICS 333612, a business counts as small if it has no more than 750 employees (SBA size standard). This notice is not set aside, but the size decides your small business status on it. SBA table, current as of Oct 15, 2026.

Notice history

Companies that win this kind of work

Federal contractors paid for speed changer, industrial high-speed drive, and gear manufacturing work, who also hold Navy contracts (last 12 months): possible competitors, or partners to team with.

About the buyer

The Department of the Navy awarded $132.1 billion in contracts in the last 12 months; its biggest suppliers were Electric Boat Corporation, Lockheed Martin Corporation and RTX Corporation. See what Navy is buying now.

Speed Changer, Industrial High-Speed Drive, and Gear Manufacturing contracts right now

There are 42 open government contract opportunities in this trade (NAICS 333612), 18 posted in the last 7 days; 45% are set aside for small businesses. The agencies buying the most are Defense Logistics Agency and Department of the Navy. A notice in this trade gives a median of 15 days from posting to deadline; this one gives 6 days.

All open speed changer, industrial high-speed drive, and gear manufacturing contracts

Coming up in this trade

Planned contracts from the agencies' procurement forecasts, often months before a solicitation. Plans can change.

Rotork gear boxes for Standfield branch Checks 31,32,33 (CPN)
Bureau of Reclamation
Acquisition Planning · Award FY 2027 · Below $150K · Firm Fixed Price
SSB Low Bed Trailer
Bureau of Reclamation
Acquisition Planning · Award FY 2027 · $150K - $249K · Small Business Set Aside - Total · Firm Fixed Price
Set up a 5-Year IDIQ for the sustainment of Gearbox, Differential Assemblies
National Oceanic and Atmospheric Administration
Acquisition Planning · Award FY 2026 · $1M - $1.9M · Unknown

Recent awards in this trade

From the award notices agencies publish.

Similar open speed changer, industrial high-speed drive, and gear manufacturing bids

Chain, Roller
Defense Logistics Agency
Due Nov 12, 2026 · 14 days left
Solicitation · Small business · Posted Oct 28, 2026
Pulley, Groove
Defense Logistics Agency
Due Nov 12, 2026 · 14 days left
Solicitation · Small business · Posted Oct 27, 2026
Bellows, Pressure
Defense Logistics Agency
Due Nov 3, 2026, 11:59 PM (UTC-5) · 5 days left
Sources Sought · Posted Oct 27, 2026
Drive Unit, Angle
Defense Logistics Agency
Due Nov 12, 2026 · 14 days left
Solicitation · Posted Oct 27, 2026
Pulley, Groove
Defense Logistics Agency
Due Nov 10, 2026 · 12 days left
Solicitation · Posted Oct 26, 2026
Pump, Centrifugal
Defense Logistics Agency
Due Nov 6, 2026 · 8 days left
Solicitation · Posted Oct 26, 2026