Disk, Valve, in Repair/Modification of
Updated
Solicitation from the Department of the Navy. Due Dec 4, 2026, 4:30 PM (UTC-4), 28 days left.
| Title as posted | 48--DISK,VALVE, IN REPAIR/MODIFICATION OF |
|---|---|
| Solicitation number | N0010426QYAC3 |
| Agency | Department of the Navy |
| Office | NAVSUP Weapon Systems Support Mech |
| Notice type | Solicitation |
| Set-aside | None |
| Trade (NAICS) | Other Metal Valve and Pipe Fitting Manufacturing (332919) |
| Product or service code | 4820 |
| Posted | Nov 5, 2026 |
| Response deadline | Dec 4, 2026, 4:30 PM (UTC-4) (28 days left) |
| Add the deadline to | Google Calendar · Apple / Outlook (.ics) |
Description
This is a EAF Repair requirement for the items listed in this solicitation. All contractual documents (i.e. contracts, purchase orders, task orders, delivery orders and modifications) related to the instant procurement are considered to be "issued" by the Government when copies are either deposited in the mail, transmitted by facsimile, or sent by other electronic commerce methods, such as email.
The Government's acceptance of the contractor's proposal constitutes bilateral agreement to "issue" contractual documents as detailed herein. \
- SCOPE 1.1 This contract/purchase order contains the requirements for repair and the contract quality requirements for the DISK,VALVE .
- APPLICABLE DOCUMENTS 2.1 Applicable Documents - The document(s) listed below form a part of this contract/purchase order including modifications or exclusions. 2.1.1 "Document References" listed below must be obtained by the Contractor. Ordering information is included as an attachment to this contract/purchase order.
- REQUIREMENTS 3.1 Cage Code/Reference Number Items - The DISK,VALVE repaired under this contract/purchase order shall meet the operational and functional requirements as represented by the Cage Code(s) and reference number(s) listed below.
All repair work shall be performed in accordance with the contractors repair/overhaul standard practices, manuals and directives including but not limited to drawings, technical orders, manufacturing operations, tooling instructions, approved repair standards and any other contractor or government approved documents developed to provide technical repair procedures. CAGE___Ref. No. ;99517 V3C10289-TB; 3.2 Marking - This item shall be physically identified in accordance with ;MIL-STD-130, REV N, 16 NOV 2012; .
3.3 Changes in Design, Material Servicing, or Part Number - Except for a Code 1 change, which shall be processed as provided in the code statement shown below, no substitution of items shall be made until the NAVICP-MECH Contracting Officer has notified and approval has been given by issuance of a written change order. When any change in design, material, servicing or part number is made to replace or substitute any item to be furnished on this contract/purchase order, the Contractor shall furnish, for the substituting/replacement item, a drawing and an explanation of the reason for the change, explaining the reason therefor.
If finished detail drawings are not available, shop drawings in the form used by the manufacturer will be acceptable for Government evaluation. When notifying the Procurement Contracting Officer of the reasons for making substitutions, the type of change shall be indicated by code number in accordance with one of the following statements: Code 1: PART NUMBER CHANGE ONLY - If the Manufacturer's Part Number indicated thereon has changed, but the parts are identical in all respects, supply the item and advise NAVICP-MECH immediately of the new part number.
Code 2: Assembly (or set or kit) not furnished - Used following detail parts. Code 3: Part not furnished separately - Use assembly. Code 4: Part redesigned - Old and new parts are completely interchangeable.
Code 5: Part redesigned - New part replaces old. Old part cannot replace new. Code 6: Part redesigned - Parts not interchangeable.
3.4 Mercury Free - The material supplied under this contract/purchase order is intended for use on submarines/surface ships and therefore shall contain no metallic mercury and shall be free from mercury contamination. Mercury contamination of the material will be cause for rejection. If the inclusion of metallic mercury is required as a functional part of the material furnished under this contract, the Contractor shall obtain written approval from the Procurement Contracting Officer before proceeding with manufacture.
The contractor's request shall explain in detail the requirements for mercury, identify specifically the parts to contain mercury, and explain the method of protection against mercury escape. Such a request will be forwarded directly to the Procurement Contracting Officer with a copy to the applicable Government Inspector. Upon approval by the Contracting Officer, the vendor will provide a "Warning Plate" stating that metallic mercury is a functional part of the item and will include name and location of that part.
The use of mercury, mercury compounds, or mercury-bearing instruments and/or equipment in a manner which might cause contamination in the manufacture, assembly, or test of material on this contract is prohibited. The most probable causes of contamination are direct-connected manometers, me
Contact: N741.P08 · HW6 · N/A · [email protected]
Clauses in this notice (15):
- Item Unique Identification and Valuation (Jan 2023)
- Inspection of Supplies--Fixed-Price (Aug 1996)
- General Information-Fob-Destination
- Wide Area Workflow Payment Instructions (Jan 2023)
- Navy Use of Abilityone Support Contractor - Release of Offeror Information (3-18))
- Mandatory Use of Workflow Pro (WFP) Mod Assist Module
- Buy American-Free Trade Agreements-Balance of Payments Program-Basic (Feb 2024)
- Small Business Subcontracting Plan (DOD CONTRACTS)-BASIC (DEV 2026-O0037)(Feb 2026))
- Option for Increased Quantity (Mar 1989)
- Notice of Total Small Business Set-Aside (DEV 2026-O0037)(Feb 2026)
- Security Prohibitions and Exclusions (Class Deviation 2026-O0025)(Feb 2026)
- Buy American-Free Trade Agreements-Balance of Payments Program Certificate-Basic (Feb 2024))
- Buy American-Balance of Payments Program Certificate-Basic (Feb 2024)
- Alternate A, Annual Representations and Certifications (Deviation 2026-O0043)(Feb 2026))
- Notice of Priority Rating for National Defense, Emergency Perpardeness, and ENRGY Progam Use (April 2008))
The description continues in the official notice.
Contracting contact
As published on the official notice. Ask questions in writing and before any questions deadline the notice sets.
Is your business small enough?
For NAICS 332919, a business counts as small if it has no more than 750 employees (SBA size standard). This notice is not set aside, but the size decides your small business status on it. SBA table, current as of Oct 15, 2026.
Notice history
- Nov 5, 2026: Presolicitation Due Dec 4, 2026, 4:30 PM (UTC-4)
- Nov 5, 2026: Solicitation Due Dec 4, 2026, 4:30 PM (UTC-4)
- Aug 10, 2026: Solicitation Due Sep 8, 2026, 4:30 PM (UTC-4)
- Jul 24, 2026: Presolicitation Due Sep 8, 2026, 12:00 AM (UTC-4)
Companies that win this kind of work
Federal contractors paid for other metal valve and pipe fitting manufacturing work, who also hold Navy contracts (last 12 months): possible competitors, or partners to team with.
- Bell Boeing Joint Project Office $9.7 million in this trade
- Ruta Supplies Inc $5.0 million in this trade
- JA Moody LLC $4.4 million in this trade
- Leslie Controls, Inc. $3.4 million in this trade
- Hamilton Sundstrand Corporation $1.7 million in this trade
About the buyer
The Department of the Navy awarded $132.7 billion in contracts in the last 12 months; its biggest suppliers were Electric Boat Corporation, Lockheed Martin Corporation and RTX Corporation. See what Navy is buying now.
Other Metal Valve and Pipe Fitting Manufacturing contracts right now
There are 194 open government contract opportunities in this trade (NAICS 332919), 48 posted in the last 7 days; 12% are set aside for small businesses. The agencies buying the most are Department of the Navy, Defense Logistics Agency and US Coast Guard. Most of the work with a stated place is in Maryland, Maine and Washington. A notice in this trade gives a median of 29 days from posting to deadline; this one gives 29 days.
All open other metal valve and pipe fitting manufacturing contracts
Coming up in this trade
Planned contracts from the agencies' procurement forecasts, often months before a solicitation. Plans can change.
Recent awards in this trade
- JLG Industries, Inc. $350,000 · Defense Logistics Agency · Nov 4, 2026
- Boeing Distribution Services X, Inc. $33,572 · Defense Logistics Agency · Nov 4, 2026
- ECI Defense Group, Inc. $38,521 · Defense Logistics Agency · Nov 4, 2026
- Waterbury Plumbing & Heating Supply, Inc. $92,130 · Defense Logistics Agency · Nov 4, 2026
- Triman Industries Inc $101,315 · Defense Logistics Agency · Nov 3, 2026
From the award notices agencies publish.