Home / Navy / Other Metal Valve and Pipe Fitting Manufacturing / Notice

Manifold Assembly and Similar Replacement Parts, in Repair/Modification of

Updated

Solicitation from the Department of the Navy. Due Nov 20, 2026, 4:30 PM (UTC-4), 22 days left.

Be among the first to see new Other Metal Valve and Pipe Fitting Manufacturing contracts
Only new notices that match, once a day.
Title as posted48--MANIFOLD ASSEMBLY - AND SIMILAR REPLACEMENT PARTS, IN REPAIR/MODIFICATION OF
Solicitation numberN0010426QTB33
AgencyDepartment of the Navy
OfficeNAVSUP Weapon Systems Support Mech
Notice typeSolicitation
Set-asideNone
Trade (NAICS)Other Metal Valve and Pipe Fitting Manufacturing (332919)
Product or service code4820
PostedOct 28, 2026
Response deadlineNov 20, 2026, 4:30 PM (UTC-4) (22 days left)
Add the deadline toGoogle Calendar · Apple / Outlook (.ics)
Official notice
Send to a teammate

Description

Amendment to update clauses and extend solicitation. Amendment to extend solicitation and update clauses. See continuation pages for details.

This solicitation is issued pursuant to Emergency Acquisition Flexibilities (EAF). Accelerated delivery is encouraged and accepted before the delivery date(s) listed in the schedule. ^^ All freight is FOB Origin. This RFQ is for repair.

The resultant award of this solicitation will be issued bilaterally, requiring the contractor's written acceptance prior to execution. Verify nomenclature, part number, and NSN prior to responding. The Government is seeking a Repair Turnaround Time (RTAT) of: 250 Days Government Source Inspection (GSI) is required.

Please note freight is handled by the Navy as per the Commercial Asset Visibility (CAV) Statement of Work. Your quote should include the following information: QUOTE AMOUNT AND RTAT o Unit Price:__________ o Total Price:__________ o Repair Turnaround Time (RTAT): _______ days If your company is not quoting the Government's Required Repair Turnaround Time (RTAT) or earlier, provide your company's capacity constraints? __________ __________ __________ Repair Turnaround Time (RTAT): the resultant contractual delivery requirement is measured from asset Return to the date of asset acceptance under the terms of the contract.

For purposes of this section, Return is defined as physical receipt of the F-condition asset at the contractor's facility as reflected in the Action Date entry in the Commercial Asset Visibility (CAV) system. In accordance with the CAV Statement of Work, the contractor is required to accurately report all transactions by the end of the fifth regular business day after receipt and the Action Date entered in CAV must be dated to reflect the actual date of physical receipt.

The Contractor must obtain final inspection and acceptance by the Government for all assets within the RTATs established in this contract. Check one: Firm-fixed-Price ___ Estimated ___ Not-to Exceed (NTE) ___ Return Material Authorization # (RMA), if applicable:__________ TESTING AND EVALUATION IF BEYOND REPAIR T&E fee/price (if asset is determined BR/BER):__________ AWARDEE INFO & PERFORMANCE LOCATION o Awardee CAGE:__________ Inspection & Acceptance CAGE, if not same as "awardee CAGE":__________ Facility/Subcontractor CAGE (where the asset should be shipped), if not same as "awardee CAGE":__________ IOT COMPARE REPAIR PRICE TO PRICE TO BUY NEW New unit price:__________ New unit delivery lead-time:__________ IMPORTANT NOTE: Any asset for which the contractor does not meet the required RTAT will incur a price reduction per unit/per month the contractor is late - any delay determined to be excusable (e.g. Government Delay) will not result in a price reduction.

Price reductions made pursuant to this section shall not limit other remedies available to the Government for failure to meet required RTATs, including but not limited to the Government's right to terminate for default. In reference to the above important note, the contractor provides the following price reduction amount per unit per month the contractor does not meet the RTAT: $__________, up to a maximum of: $_________. \

  1. SCOPE 1.1 This contract/purchase order contains the requirements for repair and the contract quality requirements for the MANIFOLD ASSEMBLY .
  2. APPLICABLE DOCUMENTS 2.1 Applicable Documents - The document(s) listed below form a part of this contract/purchase order including modifications or exclusions. 2.1.1 "Document References" listed below must be obtained by the Contractor.

Ordering information is included as an attachment to this contract/purchase order.

3. REQUIREMENTS 3.1 Cage Code/Reference Number Items - The MANIFOLD ASSEMBLY repaired under this contract/purchase order shall meet the operational and functional requirements as represented by the Cage Code(s) and reference number(s) listed below. All repair work shall be performed in accordance with the contractors repair/overhaul standard practices, manuals and directives including but not limited to drawings, technical orders, manufacturing operations, tooling instructions, approved repair standards and any other contractor or government approved documents developed to provide technical repair procedures.

CAGE___Ref. No. ;99517 S1J10009-02A; 3.2 Marking - This item shall be physically identified in accordance with ;MIL-STD-129; . 3.3 Changes in Design, Material Servicing, or Part Number - Except for a Code 1 change, which shall be processed as provided in the code statement shown below, no substitution of items shall be made until the NAVICP-MECH Contracting Officer has notified and approval has been giv

Contact: N771.4 · WG3 · 771-229-0456 · [email protected]

Clauses in this notice (11):

Documents referenced (1): MIL-STD-129

The description continues in the official notice.

Contracting contact

As published on the official notice. Ask questions in writing and before any questions deadline the notice sets.

Is your business small enough?

For NAICS 332919, a business counts as small if it has no more than 750 employees (SBA size standard). This notice is not set aside, but the size decides your small business status on it. SBA table, current as of Oct 15, 2026.

Notice history

Companies that win this kind of work

Federal contractors paid for other metal valve and pipe fitting manufacturing work, who also hold Navy contracts (last 12 months): possible competitors, or partners to team with.

About the buyer

The Department of the Navy awarded $132.1 billion in contracts in the last 12 months; its biggest suppliers were Electric Boat Corporation, Lockheed Martin Corporation and RTX Corporation. See what Navy is buying now.

Other Metal Valve and Pipe Fitting Manufacturing contracts right now

There are 202 open government contract opportunities in this trade (NAICS 332919), 81 posted in the last 7 days; 8% are set aside for small businesses. The agencies buying the most are Department of the Navy, Defense Logistics Agency and Department of Veterans Affairs. Most of the work with a stated place is in Maine, California and Massachusetts. A notice in this trade gives a median of 29 days from posting to deadline; this one gives 23 days.

All open other metal valve and pipe fitting manufacturing contracts

Coming up in this trade

Planned contracts from the agencies' procurement forecasts, often months before a solicitation. Plans can change.

Grant Creek AOPs
Department of Agriculture
Drafting Solicitation · Award FY 2026 · $500K - $999K · Unknown

Recent awards in this trade

From the award notices agencies publish.

Similar open other metal valve and pipe fitting manufacturing bids

Cap, Valve
Defense Logistics Agency
Due Nov 9, 2026 · 11 days left
Solicitation · Posted Oct 28, 2026
Elbow, Pipe
Defense Logistics Agency
Due Nov 9, 2026 · 11 days left
Solicitation · Small business · Posted Oct 28, 2026
Valve, Butterfly
Department of the Navy
Due Nov 6, 2026, 4:30 PM (UTC-5) · 8 days left
Solicitation · Posted Oct 28, 2026
Valve, Globe, in Repair/Modification of
Department of the Navy
Due Oct 29, 2026, 4:30 PM (UTC-4) · due today
Solicitation · Small business · Posted Oct 28, 2026
Cap, Valve
Department of the Navy
Due Nov 26, 2026, 5:00 PM (UTC-5) · 28 days left
Solicitation · Posted Oct 28, 2026
Stem, Fluid Valve
Department of the Navy
Due Nov 26, 2026, 5:00 PM (UTC-5) · 28 days left
Solicitation · Posted Oct 28, 2026