Home / Navy / Bare Printed Circuit Board Manufacturing / Notice

Circuit Card Assemb, in Repair/Modification of

Updated

Solicitation from the Department of the Navy. Due Dec 14, 2026, 4:30 PM (UTC-4), 27 days left.

Be among the first to see new Bare Printed Circuit Board Manufacturing contracts
Only new notices that match, once a day.
Title as posted59--CIRCUIT CARD ASSEMB, IN REPAIR/MODIFICATION OF
Solicitation numberN0010427QDA04
AgencyDepartment of the Navy
OfficeNAVSUP Weapon Systems Support Mech
Notice typeSolicitation
Set-asideNone
Trade (NAICS)Bare Printed Circuit Board Manufacturing (334412)
Product or service code5998
PostedNov 16, 2026
Response deadlineDec 14, 2026, 4:30 PM (UTC-4) (27 days left)
Add the deadline toGoogle Calendar · Apple / Outlook (.ics)
Official notice
Send to a teammate

Description

Accelerated delivery is encouraged and accepted before the delivery date(s) listed in the schedule. ^^ All freight is FOB Origin. This RFQ is for repair. The resultant award of this solicitation will be issued bilaterally, requiring the contractor?s written acceptance prior to execution.

Verify nomenclature, part number, and NSN prior to responding. Government Source Inspection (GSI) is required. Please note freight is handled by the Navy as per the Commercial Asset Visibility (CAV) Statement of Work.

Your quote should include the following information: QUOTE AMOUNT AND RTAT Unit Price:__________ Total Price:__________ Repair Turnaround Time (RTAT): _______ days If your company is not quoting the Government's Required Repair Turnaround Time (RTAT) or earlier, provide your company's capacity constraints? Repair Turnaround Time (RTAT): the resultant contractual delivery requirement is measured from asset Return to the date of asset acceptance under the terms of the contract.

For purposes of this section, Return is defined as physical receipt of the F-condition asset at the contractor?s facility as reflected in the Action Date entry in the Commercial Asset Visibility (CAV) system. In accordance with the CAV Statement of Work, the contractor is required to accurately report all transactions by the end of the fifth regular business day after receipt and the Action Date entered in CAV must be dated to reflect the actual date of physical receipt.

The Contractor must obtain final inspection and acceptance by the Government for all assets within the RTATs established in this contract. Check one: Firm-fixed-Price ___ Estimated ___ Not-to Exceed (NTE): ___ Return Material Authorization # (RMA), if applicable:__________ \

  1. SCOPE 1.1 This contract/purchase order contains the requirements for repair and the contract quality requirements for the CIRCUIT CARD ASSEMB .
  2. APPLICABLE DOCUMENTS 2.1 Applicable Documents - The document(s) listed below form a part of this contract/purchase order including modifications or exclusions. 2.1.1 "Document References" listed below must be obtained by the Contractor. Ordering information is included as an attachment to this contract/purchase order.
  3. REQUIREMENTS 3.1 Cage Code/Reference Number Items - The CIRCUIT CARD ASSEMB repaired under this contract/purchase order shall meet the operational and functional requirements as represented by the Cage Code(s) and reference number(s) listed below.

All repair work shall be performed in accordance with the contractors repair/overhaul standard practices, manuals and directives including but not limited to drawings, technical orders, manufacturing operations, tooling instructions, approved repair standards and any other contractor or government approved documents developed to provide technical repair procedures. CAGE___Ref. No. ;1D8S5 1718859-101 072E5 1718859-101; 3.2 Marking - This item shall be physically identified in accordance with ;MIL-STD-130, REV N, 16 NOV 2012; .

3.3 Changes in Design, Material Servicing, or Part Number - Except for a Code 1 change, which shall be processed as provided in the code statement shown below, no substitution of items shall be made until the NAVICP-MECH Contracting Officer has notified and approval has been given by issuance of a written change order. When any change in design, material, servicing or part number is made to replace or substitute any item to be furnished on this contract/purchase order, the Contractor shall furnish, for the substituting/replacement item, a drawing and an explanation of the reason for the change, explaining the reason therefor.

If finished detail drawings are not available, shop drawings in the form used by the manufacturer will be acceptable for Government evaluation. When notifying the Procurement Contracting Officer of the reasons for making substitutions, the type of change shall be indicated by code number in accordance with one of the following statements: Code 1: PART NUMBER CHANGE ONLY - If the Manufacturer's Part Number indicated thereon has changed, but the parts are identical in all respects, supply the item and advise NAVICP-MECH immediately of the new part number.

Code 2: Assembly (or set or kit) not furnished - Used following detail parts. Code 3: Part not furnished separately - Use assembly. Code 4: Part redesigned - Old and new parts are completely interchangeable.

Code 5: Part redesigned - New part replaces old. Old part cannot replace new. Code 6: Part redesigned - Parts not interchangeable.

3.4 Electrostatic Discharge Control - The Contractor shall comply with the electrostatic discharge control requirements established in ANSI/ESD S20.20, "ESD Association Standard for the Development of an Elect

Contact: N712.11 · AAK · 717-605-5192 · [email protected]

Clauses in this notice (14):

The description continues in the official notice.

Contracting contact

As published on the official notice. Ask questions in writing and before any questions deadline the notice sets.

Is your business small enough?

For NAICS 334412, a business counts as small if it has no more than 750 employees (SBA size standard). This notice is not set aside, but the size decides your small business status on it. SBA table, current as of Oct 15, 2026.

Notice history

Companies that win this kind of work

Federal contractors paid for bare printed circuit board manufacturing work, who also hold Navy contracts (last 12 months): possible competitors, or partners to team with.

About the buyer

The Department of the Navy awarded $129.8 billion in contracts in the last 12 months; its biggest suppliers were Electric Boat Corporation, Lockheed Martin Corporation and RTX Corporation. See what Navy is buying now.

Bare Printed Circuit Board Manufacturing contracts right now

There are 145 open government contract opportunities in this trade (NAICS 334412), 36 posted in the last 7 days; 10% are set aside for small businesses. The agencies buying the most are Defense Logistics Agency and Department of the Navy. Most of the work with a stated place is in Pennsylvania, New York and Massachusetts. A notice in this trade gives a median of 31 days from posting to deadline; this one gives 28 days.

All open bare printed circuit board manufacturing contracts

Recent awards in this trade

From the award notices agencies publish.

Similar open bare printed circuit board manufacturing bids

Circuit Card Assembly
Defense Logistics Agency
Due Nov 27, 2026 · 10 days left
Solicitation · Posted Nov 16, 2026
Circuit Card Assembly
Defense Logistics Agency
Due Nov 27, 2026 · 10 days left
Solicitation · Posted Nov 16, 2026
Switch, Radio Frequency
Defense Logistics Agency
Due Dec 1, 2026 · 14 days left
Solicitation · Posted Nov 16, 2026
Yoke, Circuit Breaker
Defense Logistics Agency
Due Dec 1, 2026 · 14 days left
Solicitation · Small business · Posted Nov 16, 2026
CPU, Micronet
Defense Logistics Agency
Due Nov 27, 2026 · 10 days left
Solicitation · Small business · Posted Nov 16, 2026
Circuit Card Assemb
Defense Logistics Agency
Due Dec 14, 2026, 4:30 PM (UTC-4) · 27 days left
Solicitation · Posted Nov 16, 2026