Display, Optoelectro, in Repair/Modification of
Updated
Solicitation from the Department of the Navy. Due Dec 4, 2026, 4:30 PM (UTC-4), 29 days left.
| Title as posted | 59--DISPLAY,OPTOELECTRO, IN REPAIR/MODIFICATION OF |
|---|---|
| Solicitation number | N0010427QUA15 |
| Agency | Department of the Navy |
| Office | NAVSUP Weapon Systems Support Mech |
| Notice type | Solicitation |
| Set-aside | None |
| Trade (NAICS) | Semiconductor and Related Device Manufacturing (334413) |
| Product or service code | 5980 |
| Posted | Nov 4, 2026 |
| Response deadline | Dec 4, 2026, 4:30 PM (UTC-4) (29 days left) |
| Add the deadline to | Google Calendar · Apple / Outlook (.ics) |
Description
NOM: DISPLAY, OPTOELECTRO; Qty. 4; NSN: 7HH 5980 014064807; PART # 7921165-01/CXFHB0501PM2-3 Accelerated delivery is encouraged and accepted before the delivery date(s) listed in the schedule. Only a firm-fixed price (FFP) for the REPAIR of the subject item(s) will be accepted.
Quotes limited to test and evaluation (T&E) will NOT be accepted. The quoted price MUST be for the REPAIR of the item(s). Please consider the following when providing price: Include repair price with all costs associated with receipt and complete repair of material that may be in incomplete condition, missing hardware, damaged, handling damage, missing parts, and wear damage.
Evaluation Utilizing Simplified Acquisition Procedures This requirement will utilize the Lowest Price Technically Acceptable (LPTA) source selection process. The Government will evaluate proposals to determine whether they meet the minimum technical requirements outlined in the performance work statement of this solicitation. Proposals that are determined to be technically acceptable will then be evaluated based on price.
The contract will be awarded to the responsible offeror whose proposal is technically acceptable and offers the lowest price. A. Electronic submission of any quotes, representations, and any necessary certifications shall be accomplished via an email directed to [email protected] B. General Requirements: MIL-STD Packaging, Government Source Inspection, FOB Source, CAV Reporting.
C. This RFQ is for REPAIR. The resultant award of this solicitation will be issued bilaterally, requiring the contractor's written acceptance prior to execution. Verify nomenclature, part number, and NSN prior to responding.
D. Must adhere to IUID requirements of DFARS 252.211-7003 E. The ultimate awardee of the proposed contract action must be an authorized repair source. Award of the proposed contract action will not be delayed while an unauthorized source seeks to obtain authorization. F. The Government is requesting a Repair Turnaround Time (RTAT) of: 298.3 days after receipt of asset.
Repair Turnaround Time (RTAT) definition: The resultant contractual delivery requirement is measured from asset Return to the date of asset acceptance under the terms of the contract. For purposes of this section, Return is defined as physical receipt of the F-condition asset at the contractor's facility as reflected in the Action Date entry in the Commercial Asset Visibility (CAV) system.
In accordance with the CAV Statement of Work, the contractor is required to accurately report all transactions by the end of the fifth regular business day after receipt and the Action Date enteredin CAV must be dated to reflect the actual date of physical receipt. The Contractor must obtain final inspection and acceptance by the Government for all assets within the RTATs established in this contract.
Please note freight is handled by Navy CAV or Proxy CAV as stated in NAVSUPWSSFA24 or NAVSUPWSSFA25. Throughput Constraint: Contractor must provide a throughput Constraint for eachNSN(s). Total assets to be repaired monthly after initial delivery commences: _____/month (contractor is to fill in #).
A throughput of "0" (zero) per monthreflects no throughput constraint. Induction Expiration Date: 365 days after contract award date. Any asset received after this date in days is not authorized for repair without bi-lateral agreement between the Contractor and NAVSUP WSS Contracting Officer.
H. IMPORTANT NOTE: Reconciliation Price Reduction: Any asset(s) for which the contractor does not meet the required RTAT will incur a price reduction per unit/per month the contractor is late. However, any delay determined to be excusable (e.g. Government Delay) will not result in a price reduction. If the contractor does not meet the required RTAT due to inexcusable contractor delay, the Contracting Officer will implement the aforementioned price reduction via a "Reconciliation Modification" at the end of the contract performance.
Price reductions made pursuant to this section shall not limit other remedies available to the Government for failure to meet required RTATs, including but not limited to the Government's right to terminate for default. In reference to the above important note, the contractor provides the following price reduction amount per unit/per month the contractor does not meet the RTAT: $__________, up to a maximum of: $__________. (vendor is to fill in amount) I. Your quote MUST include the following information for justification purposes: - Repair unit price __________ - Total price__________ - Repair Turnaround Time (RTAT) __________ days - New unit price __________ NOTE: If you are not quoting the Government's Requested Repair TurnaroundTime (RTAT) or sooner, you must provide your com
Contact: N711.6 · AJU · 771-229-0400 · [email protected]
Clauses in this notice (13):
- Item Unique Identification and Valuation (Jan 2023)
- Inspection of Supplies--Fixed-Price (Aug 1996)
- Wide Area Workflow Payment Instructions (Jan 2023)
- Navy Use of Abilityone Support Contractor - Release of Offeror Information (3-18))
- Mandatory Use of Workflow Pro (WFP) Mod Assist Module
- Notice of Cybersecurity Maturity Model Certification Level Requirements (Nov 2025))
- Small Business Subcontracting Plan (DOD CONTRACTS)-BASIC (DEV 2026-O0037)(Jul 2026))
- Contractor Purchasing System Administration-Basic (DEV 2026-O0015)(Jul 2026)
- Security Prohibitions and Exclusions (Class Deviation 2026-O0025)(Feb 2026)
- List of Solicitation Attachments
- Buy American-Balance of Payments Program Certificate-Basic (Feb 2024)
- Alternate A, Annual Representations and Certifications (Deviation 2026-O0043)(Feb 2026))
- Notice of Priority Rating for National Defense, Emergency Perpardeness, and ENRGY Progam Use (April 2008))
The description continues in the official notice.
Contracting contact
As published on the official notice. Ask questions in writing and before any questions deadline the notice sets.
Is your business small enough?
For NAICS 334413, a business counts as small if it has no more than 1,250 employees (SBA size standard). This notice is not set aside, but the size decides your small business status on it. SBA table, current as of Oct 15, 2026.
Notice history
- Oct 20, 2026: Presolicitation Due Dec 4, 2026, 12:00 AM (UTC-4)
Companies that win this kind of work
Federal contractors paid for semiconductor and related device manufacturing work, who also hold Navy contracts (last 12 months): possible competitors, or partners to team with.
- Gentex Corporation $8.9 million in this trade
- Jo-Kell Inc. $1.5 million in this trade
- Raytheon Company $914,577 in this trade
- Technical Communities, Inc. $439,185 in this trade
- L3HARRIS Technologies, Inc. $30,428 in this trade
About the buyer
The Department of the Navy awarded $132.7 billion in contracts in the last 12 months; its biggest suppliers were Electric Boat Corporation, Lockheed Martin Corporation and RTX Corporation. See what Navy is buying now.
Semiconductor and Related Device Manufacturing contracts right now
There are 30 open government contract opportunities in this trade (NAICS 334413), 14 posted in the last 7 days; 43% are set aside for small businesses. The agencies buying the most are Defense Logistics Agency, Department of the Navy and Department of the Army. Most of the work with a stated place is in Maryland and Alabama. A notice in this trade gives a median of 14 days from posting to deadline; this one gives 30 days.
All open semiconductor and related device manufacturing contracts
Coming up in this trade
Planned contracts from the agencies' procurement forecasts, often months before a solicitation. Plans can change.
Recent awards in this trade
- Jo-Kell Inc. $25,906 · Defense Logistics Agency · Nov 4, 2026
- Veterans Contracting Group, Inc. $30,450 · Defense Logistics Agency · Nov 4, 2026
- Howell Laboratories Inc $35,872 · Defense Logistics Agency · Nov 3, 2026
- Korry Electronics Co $58,500 · Defense Logistics Agency · Nov 2, 2026
- Ares Fire And Safety Systems LLC $350,000 · Defense Logistics Agency · Nov 2, 2026
From the award notices agencies publish.