Indicator, Radio FRE, in Repair/Modification of
Updated
Solicitation from the Department of the Navy. Due Nov 30, 2026, 2:00 PM (UTC-4), 26 days left.
| Title as posted | 66--INDICATOR,RADIO FRE, IN REPAIR/MODIFICATION OF |
|---|---|
| Solicitation number | N0038325RH238 |
| Agency | Department of the Navy |
| Office | NAVSUP Weapon Systems Support |
| Notice type | Solicitation |
| Set-aside | None |
| Trade (NAICS) | Bare Printed Circuit Board Manufacturing (334412) |
| Product or service code | 6625 |
| Posted | Nov 3, 2026 |
| Response deadline | Nov 30, 2026, 2:00 PM (UTC-4) (26 days left) |
| Add the deadline to | Google Calendar · Apple / Outlook (.ics) |
Description
The purpose of this amendment is to decrease the QTY of this requirement from 129 to 55. \ This requirement is for the repair of the items herein thissolicitation. Repair Turnaround Time (RTAT) definition: The contractual delivery requirement is measured from asset Return to the date of asset acceptance under the terms of the contract. For purposes of this section, Return is defined as physical receipt of the F-condition asset at the contractor's facility as reflected in the Action Date entry in the Commercial Asset Visibility (CAV) system.
In accordance with the CAV Statement of Work, the contractor is required to accurately report all transactions by the end of the fifth regular business day after receipt and the Action Date entered in CAV must be dated to reflect the actual date of physical receipt. The Contractor must obtain final inspection and acceptance by the Government for all assets within the RTATs established in the subsequent contract.
Required RTAT: ## ____ days after receipt of asset. Throughput Constraint: Contractor must provide a throughput Constraint for each NSN(s). Total assets to be repaired monthly after initial delivery commences X/month (contractor fill in #).
A throughput of ##____ per month reflects no throughput constraint. Induction Expiration Date: 365 days after contract award date. Any asset received after this date in days is not authorized for repair without bi-lateral agreement between the Contractor and NAVSUP WSS Contracting Officer.
Reconciliation:A reconciliation modification will be issued after final Inspection and acceptance of all assets inducted under the subsequent contract. The parties have agreed to a price (shown on the schedule page) for each unit at the negotiated RTAT. Such prices are based on the Contractor meeting the RTAT requirements described within the schedule page.
If the Contractor does not meet the applicable RTAT requirement, consideration will be assessed and subject to negotiation. All contractual documents (i.e. contracts, purchase orders, task orders, delivery orders and modifications)related to the instant procurement are considered to be "issued" by the Government when copies are either deposited in the mail, transmitted by facsimile, or sent by other electronic commerce methods, such as email.
The Government's acceptance of the contractor's proposal constitutes bilateral agreement to "issue" contractual documents as detailed herein. Early and incremental deliveries accepted and preferred. \ 1. SCOPE 1.1 .
Markings shall be in accordance with MIL-STD-130. 1.2 Articles to be furnished hereunder shall be repaired, tested andinspected in accordance with the terms and conditions specified in theRequirements Section of this document. 1.3 Unless expressly provided for elsewhere in this clause, equipment suchas fixtures, jigs, dies, patterns, mylars, special tooling, test equipment, orany other manufacturing aid required for the manufacture and/or testing of the subject item(s) will not be provided by the Government or any other source and is the sole responsibility of the contractor.
The foregoing applies notwithstanding any reference to such equipment or the furnishing thereof that may be contained in any drawing or referenced specification. 1.4 The use of MIL-W-81381 wire in any item to be delivered under this procurement is prohibited. The foregoing prohibition applies notwithstanding any reference to MIL-W-81381 wire that may be made in any of the drawings or specifications for this procurement.
SAE-AS22759 series wire shall be used in lieu of MIL-W-81381 wire, in any place where MIL-W-81381 wire is cited in this procurement. Any questions concerning this requirement should be directed to the Procuring Contracting Officer. 1.5 If MIL-STD-454 is referenced in the drawings or in the specification,the contractor is expected to show compliance with IPC/EIAJ-STD-001C Personnel performing tasks in accordance with IPC/EIAJ-STD-001C shall be trained and certified as requried by IPC/EIAJ-STD-001C paragraph 5.1.4. 2.
Applicable documents - not applicable 3. REQUIREMENTS 3.1 1.0 GENERAL 3.1.1 This Statement of Work (SOW) establishes the criteria for repair and testing /inspection of the subject item. It includes inspection, component repair and replacement,reassembly and testing procedures required to return units back into a servicable condition.
3.2 2.0 DEFINITIONS. 3.2.1 CONTRACTOR: Is defined as the successful offeror awarded a contract, orderor issued a project work order. The ter
Clauses in this notice (20):
- Item Unique Identification and Valuation (Jan 2023)
- Higher-Level Contract Quality Requirement
- Time of Delivery (June 1997)
- Stop-Work Order (Aug 1989)
- Wide Area Workflow Payment Instructions (Jan 2023)
- Navy Use of Abilityone Support Contractor - Release of Offeror Information (3-18))
- Integrity of Unit Prices (Nov 2021)
- Warranty of Supplies of a Noncomplex Nature (Jun 2003)
- Safeguarding Sensitive Conventional Arms, Ammunition, and Explosives (Nov 2023)
- Equal Opportuity for Workers with Disabilities (Jun 2020)
- Transportation of Supplies by Sea (Oct 2024)
- Buy American-Free Trade Agreements-Balance of Payments Program-Basic (Feb 2024)
- Limitations on Pass-Through Charges (Jun 2020)
- Alternate A, Annual Representations and Certifications (Oct 2024)
- Buy American-Free Trade Agreements-Balance of Payments Program Certificate-Basic (Feb 2024))
- Buy American--Balance of Payments Program (Feb 2024)
- Royalty Information (Apr 1984)
- Annual Representations and Certifications (Mar 2025)(DEVIATION 2025-O0003 and 2025-O0004))
- Type of Contract (Apr 1984)
- Notice of Priority Rating for National Defense, Emergency Preparedness, Andenergy Program Use (Apr 2008))
The description continues in the official notice.
Contracting contact
As published on the official notice. Ask questions in writing and before any questions deadline the notice sets.
Is your business small enough?
For NAICS 334412, a business counts as small if it has no more than 750 employees (SBA size standard). This notice is not set aside, but the size decides your small business status on it. SBA table, current as of Oct 15, 2026.
Notice history
- Nov 3, 2026: Presolicitation Due Nov 30, 2026, 2:00 PM (UTC-4)
- Nov 3, 2026: Solicitation Due Nov 30, 2026, 2:00 PM (UTC-4)
- Jun 20, 2025: Solicitation Due Jul 21, 2025, 2:00 PM (UTC-4)
- Jun 4, 2025: Presolicitation Due Jul 21, 2025, 12:00 AM (UTC-4)
Companies that win this kind of work
Federal contractors paid for bare printed circuit board manufacturing work, who also hold Navy contracts (last 12 months): possible competitors, or partners to team with.
- Fairwinds Technologies LLC $305.0 million in this trade
- Supplycore LLC $150.9 million in this trade
- Atlantic Diving Supply, Inc. $124.2 million in this trade
- Raytheon Company $59.2 million in this trade
- DRS Network & Imaging Systems LLC $55.9 million in this trade
About the buyer
The Department of the Navy awarded $132.7 billion in contracts in the last 12 months; its biggest suppliers were Electric Boat Corporation, Lockheed Martin Corporation and RTX Corporation. See what Navy is buying now.
Bare Printed Circuit Board Manufacturing contracts right now
There are 132 open government contract opportunities in this trade (NAICS 334412), 42 posted in the last 7 days; 9% are set aside for small businesses. The agencies buying the most are Department of the Navy and Defense Logistics Agency. Most of the work with a stated place is in Washington and Pennsylvania. A notice in this trade gives a median of 31 days from posting to deadline; this one gives 27 days.
All open bare printed circuit board manufacturing contracts
Recent awards in this trade
- Mark C. Pope Associates, Inc. $27,300 · Defense Logistics Agency · Nov 3, 2026
- Coastal Design, LLC $99,250 · Defense Logistics Agency · Oct 30, 2026
- Kampi Components Co Inc $97,651 · Defense Logistics Agency · Oct 30, 2026
- PAR Defense Industries, LLC $350,000 · Defense Logistics Agency · Oct 30, 2026
- Jo-Kell Inc. $159,940 · Defense Logistics Agency · Oct 29, 2026
From the award notices agencies publish.