AZ BL COLO 7528(1) Burro Creek Road
Updated
Solicitation from the Federal Highway Administration, for work in Kingman, Arizona. Due Nov 17, 2026, 2:00 PM (UTC-7), 20 days left.
| Solicitation number | 6982AF27B000002 |
|---|---|
| Agency | Federal Highway Administration |
| Office | 6982AF Central Federal Lands Divisi |
| Notice type | Solicitation |
| Set-aside | Small business |
| Trade (NAICS) | Highway, Street, and Bridge Construction (237310) |
| Product or service code | Y1LB |
| Place of performance | Kingman, Arizona |
| Posted | Oct 27, 2026 |
| Response deadline | Nov 17, 2026, 2:00 PM (UTC-7) (20 days left) |
| Add the deadline to | Google Calendar · Apple / Outlook (.ics) |
Bid documents (8)
- Design Physical Data and Reports 70 KB
- AZ BL COLO 7528 Burro Creek Road Justification for Other Than Full and Open Competition Redacted 267 KB
- AZ BL COLO 7528 Burro Creek Road GEO Report and PVMNT Report 20.0 MB
- AZ BL COLO 7528 Burro Creek Road HYD Report 35.8 MB
- AZ BL COLO 7528 Burro Creek Road Plans 143.6 MB
- AZ BL COLO 7528 Invitation for Bids 2.0 MB
- Standard Specifications for Construction FHWA Federal Hwy Projects 5.7 MB
- Questions and Answers AZ BL COLO 7582 Burro Creek Road-response10.27.2026 213 KB
Paid members download every document from this page, or buy this bid alone.
Federal prevailing wage rates for this place: Arizona Davis-Bacon and SCA wage determinations.
Description
PROJECT DESCRIPTION: Burro Creek Road is located in Mohave County, 71 miles southwest of Kingman, Arizona. The project is located in rolling terrain, with elevations along this section ranging from approximately 1,885 to 2,255 feet. The project begins at the bridge over Burro Creek and ends at the cattle guard near the intersection with US Hwy 93.
The project's length is approximately 1.3 miles. SCOPE OF THE WORK: The proposed of this resurfacing, restoration, and rehabilitation (3R) project is to improve access to the camping and day use areas at the Burro Creek Campground, reduce maintenance costs and erosion, improve sediment control, drainage and safety. The scope of work for this project includes the following major construction activities and items: Pavement Rehabilitation: 1.3 miles of roadway resurfacing incorporating Full Depth Reclamation (FDR) and Asphalt Concrete Pavement, along with applicable fog seals and tack coats.
Drainage Improvements: Installation of cross culverts and reconstruction of an existing headwall. Additional drainage work includes ditch grading and reconditioning, berms, bank stabilization, and the addition of flared end sections and riprap aprons throughout the project. Earthwork & Stabilization: Embankment benching, slope stabilization, slope scaling, and specific bridge approach repairs at the eastern abutment to resolve undercutting concerns Safety & Traffic Control Items: Installation of new regulatory and warning signs, pavement markings and the placement of boulders to control public access at specific locations throughout the project.
The project is structured with a base Schedule A encompassing the primary roadway rehabilitation, and an Option X which includes work associated with repairing bridge sedimentation, addressing undercutting at the bridge approaches, and boulder placement. PRINCIPAL WORK ITEMS: Roadway Aggregate: 1,600 TONS Ditch Reconditioning: 2,000 LNFT Full Depth Reclamation: 1.3 MILE Asphalt Concrete Pavement: 3,600 TON 18-Inch Pipe Culvert: 100 LNFT 24-Inch Pipe Culvert: 175 LNFT Boulder: 100 EACH ANTICIPATED SCHEDULE: Advertisement – October 2026 Award-January - 2027 Construction – January 2027 through October 2027 ESTIMATED COST RANGE: Between $2,000,000 and $5,000,000
Contracting contact
- Eric Grosskreuz · [email protected]
- Kelly Palmer · [email protected]
As published on the official notice. Ask questions in writing and before any questions deadline the notice sets.
Is your business small enough?
For NAICS 237310, a business counts as small if it has no more than $45.0 million in average annual receipts (SBA size standard). This notice is set aside, so only businesses under that size, or in the named program, can bid. SBA table, current as of Oct 15, 2026.
Notice history
- Oct 15, 2026: Solicitation Due Nov 17, 2026, 2:00 PM (UTC-7)
- Oct 15, 2026: Presolicitation Due Nov 17, 2026, 2:00 PM (UTC-7)
Who can bid: Small Business set-aside
Total and partial small business set-asides are open to any business under the SBA size standard for the notice's NAICS code.
All open Small Business set-asides.
Highway, Street, and Bridge Construction contracts right now
There are 55 open government contract opportunities in this trade (NAICS 237310), 22 posted in the last 7 days; 75% are set aside for small businesses. The agencies buying the most are Federal Highway Administration, Department of the Army and Forest Service. Most of the work with a stated place is in Colorado, Idaho and North Dakota. A notice in this trade gives a median of 20 days from posting to deadline; this one gives 21 days.
All open highway, street, and bridge construction contracts
Coming up in this trade
Planned contracts from the agencies' procurement forecasts, often months before a solicitation. Plans can change.
Recent awards in this trade
- Aspen Construction Company $132.7 million · Department of the Air Force · Sep 30, 2026
- David Taylor Construction, Inc. $2.8 million · Department of the Army · Sep 29, 2026
- Titan Industrial Services, Inc $8.6 million · Department of the Army · Sep 22, 2026
- Titan Industrial Services, Inc $8.6 million · Department of the Army · Sep 22, 2026
- Bering Straits Global Innovations, LLC $26.1 million · Department of the Army · Jun 25, 2026
From the award notices agencies publish.