Butterfly VLV 3.00
Updated
Solicitation from the Department of the Navy. Due Dec 7, 2026, 4:30 PM (UTC-4), 31 days left.
| Title as posted | BUTTERFLY VLV 3.00 |
|---|---|
| Solicitation number | N0010426QTC52 |
| Agency | Department of the Navy |
| Office | NAVSUP Weapon Systems Support Mech |
| Notice type | Solicitation |
| Set-aside | None |
| Trade (NAICS) | Other Metal Valve and Pipe Fitting Manufacturing (332919) |
| Product or service code | 4820 |
| Posted | Nov 5, 2026 |
| Response deadline | Dec 7, 2026, 4:30 PM (UTC-4) (31 days left) |
| Add the deadline to | Google Calendar · Apple / Outlook (.ics) |
Description
Accelerated and incremental delivery is encouraged and accepted before the delivery date(s) listed in the schedule. All freight is FOB Origin. This RFQ is for a buy.
The resultant award of this solicitation will be issued Government source inspection is required. Unit Price:__________ FIRM Total Price:__________ FIRM Procurement Turnaround Time (PTAT) :__________ Awardee CAGE: __________ Manufacturing Facility CAGE, if not at source:__________ Packaging Facility CCAGE, if not at source: __________ Delivery Vehicle (if Delivery Order requested) (if your company has a current BOA/IDIQ, for example) :__________ Important Traceability Notice: If you are not the manufacturer of the material you are offering, you must provide a letter/official email from the OEM confirming your company is an authorized distributor of their items. \
- SCOPE 1.1 This contract/purchase order contains the requirements for manufacture and the contract quality requirements for the BUTTERFLY VLV 3.00 .
- APPLICABLE DOCUMENTS 2.1 Applicable Documents - The document(s) listed below form a part of this contract/purchase order including modifications or exclusions. 2.1.1 "Document References" listed below must be obtained by the Contractor. Ordering information is included as an attachment to this contract/purchase order.
- REQUIREMENTS 3.1 Cage Code/Reference Number Items - The BUTTERFLY VLV 3.00 furnished under this contract/purchase order shall be the design represented by Cage Code(s) reference number(s).
Cage _______ ref. no. ;7KXG7 400300-110NT8QT/G002; 3.2 Marking - This item shall be physically identified in accordance with ;MIL-STD-130, REV N, 16 NOV 2012; . 3.3 Changes in Design, Material Servicing, or Part Number - Except for a Code 1 change, which shall be processed as provided in the code statement shown below, no substitution of items shall be made until the NAVICP-MECH Contracting Officer has notified and approval has been given by issuance of a written change order.
When any change in design, material, servicing or part number is made to replace or substitute any item to be furnished on this contract/purchase order, the Contractor shall furnish, for the substituting/replacement item, a drawing and an explanation of the reason for the change, explaining the reason therefor. If finished detail drawings are not available, shop drawings in the form used by the manufacturer will be acceptable for Government evaluation.
When notifying the Procurement Contracting Officer of the reasons for making substitutions, the type of change shall be indicated by code number in accordance with one of the following statements: Code 1: PART NUMBER CHANGE ONLY - If the Manufacturer's Part Number indicated thereon has changed, but the parts are identical in all respects, supply the item and advise NAVICP-MECH immediately of the new part number.
Code 2: Assembly (or set or kit) not furnished - Used following detail parts. Code 3: Part not furnished separately - Use assembly. Code 4: Part redesigned - Old and new parts are completely interchangeable.
Code 5: Part redesigned - New part replaces old. Old part cannot replace new. Code 6: Part redesigned - Parts not interchangeable.
4. QUALITY ASSURANCE 4.1 Responsibility for Inspection - Unless otherwise specified in the contract/purchase order, the Contractor is responsible for the performance of all inspection requirements as specified herein. Except as otherwise specified in the contract/purchase order, the Contractor may use his own or any other facilities suitable for the performance of the inspection requirements specified herein, unless disapproved by the Government.
The Government reserves the right to perform any of the inspections set forth in the specification where such inspections are deemed necessary to assure supplies and services conform to prescribed requirements. 4.2 Responsibility for Compliance - All items must meet all requirements of this contract/purchase order. The inspection set forth in this specification shall become a part of the Contractor's overall inspection system or quality program.
The absence of any inspection requirements shall not relieve the Contractor of the responsibility of assuring that all products or supplies submitted to the Government for acceptance comply with all requirements of the contract/purchase order. Sampling in quality conformance does not authorize submission of known defective material, either indicated or actual, not does it commit the Government to acceptance of defective material.
4.3 Records - Records of all inspection work by the Contractor shall be kept complete and available to the Government during the performance of contract/purchase order and for a period of 365 calendar days after final delivery of supplies. 5. PACKAGING 5.1 Preservation, Packaging, Packing and Marking - Preservation, Packaging, Packing and Marking shall be in accordance with the Contract/Purchase Order Schedule and as specified below.
MIL-STD 2073 packaging applies as found elsewhere in the schedule 6. NOTES 6.1 Ordering Information for Document Referen
Clauses in this notice (10):
- Item Unique Identification and Valuation (Jan 2023)
- Inspection of Supplies--Fixed-Price (Aug 1996)
- Wide Area Workflow Payment Instructions (Jan 2023)
- Navy Use of Abilityone Support Contractor - Release of Offeror Information (3-18))
- Mandatory Use of Workflow Pro (WFP) Mod Assist Module
- Small Business Subcontracting Plan (DOD CONTRACTS)-BASIC (DEV 2026-O0037)(Jul 2026))
- Contractor Purchasing System Administration-Basic (DEV 2026-O0015)(Jul 2026)
- Security Prohibitions and Exclusions (Class Deviation 2026-O0025)(Feb 2026)
- Alternate A, Annual Representations and Certifications (Deviation 2026-O0043)(Feb 2026))
- Notice of Priority Rating for National Defense, Emergency Perpardeness, and ENRGY Progam Use (April 2008))
The description continues in the official notice.
Contracting contact
As published on the official notice. Ask questions in writing and before any questions deadline the notice sets.
Is your business small enough?
For NAICS 332919, a business counts as small if it has no more than 750 employees (SBA size standard). This notice is not set aside, but the size decides your small business status on it. SBA table, current as of Oct 15, 2026.
Companies that win this kind of work
Federal contractors paid for other metal valve and pipe fitting manufacturing work, who also hold Navy contracts (last 12 months): possible competitors, or partners to team with.
- Bell Boeing Joint Project Office $9.7 million in this trade
- Ruta Supplies Inc $5.0 million in this trade
- JA Moody LLC $4.4 million in this trade
- Leslie Controls, Inc. $3.4 million in this trade
- Hamilton Sundstrand Corporation $1.7 million in this trade
About the buyer
The Department of the Navy awarded $132.7 billion in contracts in the last 12 months; its biggest suppliers were Electric Boat Corporation, Lockheed Martin Corporation and RTX Corporation. See what Navy is buying now.
Other Metal Valve and Pipe Fitting Manufacturing contracts right now
There are 194 open government contract opportunities in this trade (NAICS 332919), 48 posted in the last 7 days; 12% are set aside for small businesses. The agencies buying the most are Department of the Navy, Defense Logistics Agency and US Coast Guard. Most of the work with a stated place is in Maryland, Maine and Washington. A notice in this trade gives a median of 29 days from posting to deadline; this one gives 32 days.
All open other metal valve and pipe fitting manufacturing contracts
Coming up in this trade
Planned contracts from the agencies' procurement forecasts, often months before a solicitation. Plans can change.
Recent awards in this trade
- JLG Industries, Inc. $350,000 · Defense Logistics Agency · Nov 4, 2026
- Boeing Distribution Services X, Inc. $33,572 · Defense Logistics Agency · Nov 4, 2026
- ECI Defense Group, Inc. $38,521 · Defense Logistics Agency · Nov 4, 2026
- Waterbury Plumbing & Heating Supply, Inc. $92,130 · Defense Logistics Agency · Nov 4, 2026
- Triman Industries Inc $101,315 · Defense Logistics Agency · Nov 3, 2026
From the award notices agencies publish.