Home / Navy / Other Aircraft Parts and Auxiliary Equipment Manufacturing / Notice

Cable Assembly, ROTA

Updated

Solicitation from the Department of the Navy. Due Nov 30, 2026, 4:30 PM (UTC-4), 31 days left.

Be among the first to see new Other Aircraft Parts and Auxiliary Equipment Manufacturing contracts
Only new notices that match, once a day.
Title as postedCABLE ASSEMBLY,ROTA
Solicitation numberN0038327QAA18
AgencyDepartment of the Navy
OfficeNAVSUP Weapon Systems Support
Notice typeSolicitation
Set-asideNone
Trade (NAICS)Other Aircraft Parts and Auxiliary Equipment Manufacturing (336413)
Product or service code1680
PostedOct 29, 2026
Response deadlineNov 30, 2026, 4:30 PM (UTC-4) (31 days left)
Add the deadline toGoogle Calendar · Apple / Outlook (.ics)
Official notice
Send to a teammate

Description

This requirement is for the repair of the items herein this solicitation. Repair Turnaround Time (RTAT) definition: The contractual delivery requirementis measured from asset Return to the date of asset acceptance under the terms of the contract. For purposes of this section, return is defined as physical receiptof the F-condition asset at the contractor?s facility as reflected in the Action Dateentry in the commercial Asset Visibility (CAV) system.

In accordance with the CAVStatement of Work, the contractor is required to accurately report all transactions by the end of the fifth regular business day after receipt and the Action Date entered in CAV must be dated to reflect the actual date of physical receipt. The Contractor must obtain final inspection and acceptance by the Government for all assets within the RTATs established in the subsequent contract.

Required RTAT: ## ____ days after receipt of asset. Throughput Constraint: Contractor must provide a throughput Constraint for each NSN(s). Total assets to be repaired monthly after initial delivery commences X/month (contractor fill in #).

A throughput of ##____ per month reflects no throughput constraint. Reconciliation: A reconciliation modification will be issued after final Inspection and acceptance of all assets inducted under the subsequent contract. The parties have agreed to a price (shown on the schedule page of the contract) for each unit at the negotiated RTAT.

Such prices are based on the Contractor meeting the RTAT requirements described within the schedule page. If the Contractor does not meet the applicable RTAT requirement, consideration will be assessed and subject to negotiation. Induction Expiration Date: 365 days after contract award date.

Any asset received after this date in days is not authorized for repair without bi-lateral agreement between the Contractor and NAVSUP WSS Contracting Officer. \ 1. SCOPE 1.1 . Markings shall be in accordance with MIL-STD-130. 1.2 Articles to be furnished hereunder shall be repaired, tested and inspected in accordance with the terms and conditions specified in the Requirements Section of this document.

1.2.1 Any item contracted for repair SHALL have a Statement of Work to ensure compliance with all repair procedures and requirements. Repair of: CABLE ASSEMBLY,ROTA ;1680-01-661-7957; NSN , ;5217008-110; Part Number, Shall be performed IAW: Cable assembly,ROTA ;latest applicable repair; Publication (s). 1.2.2 There will be no repair deviation from the approved written procedures without review and acceptance by the Basic Design Engineer.

All requests for Waiver/Deviation shall be via Form 1694 routed throught the Local DCMA/ACO office for review and recommendations via form 1998. 1.3 Articles to be furnished hereunder shall be repaired, tested andinspected in accordance with the terms and conditions specified in theRequirements Section of this document. 1.4 Unless expressly provided for elsewhere in this clause, equipment suchas fixtures, jigs, dies, patterns, mylars, special tooling, test equipment, orany other manufacturing aid required for the manufacture and/or testing of the subject item(s) will not be provided by the Government or any other source and is the sole responsibility of the contractor.

The foregoing applies notwithstanding any reference to such equipment or the furnishing thereof that may be contained in any drawing or referenced specification. 1.5 The use of MIL-W-81381 wire in any item to be delivered under this procurement is prohibited. The foregoing prohibition applies notwithstanding any reference to MIL-W-81381 wire that may be made in any of the drawings or specifications for this procurement.

SAE-AS22759 series wire shall be used in lieu of MIL-W-81381 wire, in any place where MIL-W-81381 wire is cited in this procurement. Any questions concerning this requirement should be directed to the Procuring Contracting Officer. 1.6 If MIL-STD-454 is referenced in the drawings or in the specification,the contractor is expected to show compliance with IPC/EIAJ-STD-001C Personnel performing tasks in accordance with IPC/EIAJ-STD-001C shall be trained and certified as requried by IPC/EIAJ-STD-001C paragraph 5.1.4. 2.

Applicable documents - not applicable 3. REQUIREMENTS The contractor shall maintain a quality control system which meets the requirements of Mil-I-45208A, Mil-Q 9858,ISO-9000 / 9001 / 9002 or equivalent. Responsibility for inspection: Unless otherwise specified, the contractor is responsible for the performance of all inspection requirements as specified herein.

Except as otherwise specified, the contractor may use his own

Contact: N723.10 · B5K · 215-697-4020 · [email protected]

Clauses in this notice (15):

The description continues in the official notice.

Contracting contact

As published on the official notice. Ask questions in writing and before any questions deadline the notice sets.

Is your business small enough?

For NAICS 336413, a business counts as small if it has no more than 1,250 employees (SBA size standard, with exceptions in the notes). This notice is not set aside, but the size decides your small business status on it. SBA table, current as of Oct 15, 2026.

Companies that win this kind of work

Federal contractors paid for other aircraft parts and auxiliary equipment manufacturing work, who also hold Navy contracts (last 12 months): possible competitors, or partners to team with.

About the buyer

The Department of the Navy awarded $132.1 billion in contracts in the last 12 months; its biggest suppliers were Electric Boat Corporation, Lockheed Martin Corporation and RTX Corporation. See what Navy is buying now.

Other Aircraft Parts and Auxiliary Equipment Manufacturing contracts right now

There are 706 open government contract opportunities in this trade (NAICS 336413), 271 posted in the last 7 days; 36% are set aside for small businesses. The agencies buying the most are Defense Logistics Agency, Department of the Navy and Department of the Air Force. Most of the work with a stated place is in Virginia, Oklahoma and Pennsylvania. A notice in this trade gives a median of 30 days from posting to deadline; this one gives 32 days.

All open other aircraft parts and auxiliary equipment manufacturing contracts

Coming up in this trade

Planned contracts from the agencies' procurement forecasts, often months before a solicitation. Plans can change.

Purchase Alta X Drone and Accessories
Department of the Interior
Acquisition Planning · Award FY 2026 · $5M - $9.9M · Other Than Small Business · Firm Fixed Price
Purchase Alta X Drone and Accessories
Department of the Interior
Exercise of Option · Award FY 2026 · $250K - $499K · Other Than Small Business · Firm Fixed Price
Aircraft Repair Parts Contractor Logistic Support
Department of Transportation
$5M - $9.9M · To Be Determined

Recent awards in this trade

From the award notices agencies publish.

Similar open other aircraft parts and auxiliary equipment manufacturing bids

New Manufacture: Valve, Regulating, Fl / NSN 4810-01-123-7254 -OR- NSN 4810-01-282-7884
Defense Logistics Agency
Solicitation · Posted Oct 29, 2026
Head, Linear Actuati
Defense Logistics Agency
Due Nov 6, 2026 · 7 days left
Solicitation · Small business · Posted Oct 29, 2026
Jack, Hydraulic, Trip
Defense Logistics Agency
Due Nov 9, 2026 · 10 days left
Solicitation · Small business · Posted Oct 29, 2026
Servovalve, Hydraulic
Defense Logistics Agency
Due Nov 30, 2026, 4:00 PM (UTC-6) · 31 days left
Solicitation · Posted Oct 29, 2026
SPRRA127FA008
Defense Logistics Agency
Solicitation · Posted Oct 29, 2026
Amended FINAL RFP - Landing Gear Collaborative Supply Chain Integration II
Defense Logistics Agency
Due Mar 1, 2027, 5:00 PM (UTC-7)
Solicitation · Small business · Posted Oct 29, 2026