CB Safety DEV Gen 2
Updated
Solicitation from the Department of the Navy. Due Nov 23, 2026, 4:30 PM (UTC-4), 27 days left.
| Title as posted | CB SAFETY DEV GEN 2 |
|---|---|
| Solicitation number | N0010426QBL25 |
| Agency | Department of the Navy |
| Office | NAVSUP Weapon Systems Support Mech |
| Notice type | Solicitation |
| Set-aside | None |
| Trade (NAICS) | Switchgear and Switchboard Apparatus Manufacturing (335313) |
| Product or service code | 5925 |
| Posted | Oct 26, 2026 |
| Response deadline | Nov 23, 2026, 4:30 PM (UTC-4) (27 days left) |
| Add the deadline to | Google Calendar · Apple / Outlook (.ics) |
Description
This solicitation remains open until 23 November 2026. \ any manufacturer that has not previously provided and passed first article testing shall provide 5 units to the design agency for this purpose. A material IRPOD is available at the BPMI site. Vendor review of the IRPOD is mandatory.
Unless otherwise specified, pricing for this quotation is valid for 60 days after the closing date as indicated on the quotation. Please specify (if other than 60 days) __________ days. If you are submitting your quote via email or NECO, please specify the number of days pricing is valid.
All contractual documents (i.e. contracts, purchase orders, task orders, delivery orders and modifications) related to the instant procurement are considered to be 'issued' by the Government when copies are either deposited in the mail, transmitted by facsimile, or sent by other electronic commerce methods, such as email. The Government's acceptance of the contractor's proposal constitutes bilateral agreement to 'issue' contractual documents as detailed herein. \
- SCOPE 1.1 In the event of a conflict between section "C" and section "D" of the contract/purchase order, Section "C" will take precedence.
- APPLICABLE DOCUMENTS 2.1 Applicable Documents;
Technical documents associated to this solicitation or award such as; IRPOD, drawings,technical data, STRs, as well as certain military specifications, and commercial item descriptions (CID) etc. May be obtained at (HTTPS://logistics.UNNPP.GOV/ECOMMERCE) these documents, at the required revision levels that are associated to either this solicitation or award, become a part of this solicitation or award unless changed by an ADMENDMENT to the solicitation or modification to the award.
This website requires a password and PRE-registration. To obtain instruction on how to register and obtain a password contact the BPMI website administrator. 3.
Requirements 3.1 NAVSUP WSS-MECH code N94 additional technical documentation order of precedence and effective issues of cited documentation dated: July 2004 a. Order of precedence for document conflict resolution: the technical and quality requirements applicable to manufacture of the material being purchased under this order are contained or invoked in one or more of the documents listed below.
In the event of any inconsistencies between any provisions of this order, the order or precedence shall be as follows:
- Amendments to the purchase order/contract
- Schedule of supplies of the purchase order/contract.
- Terms and conditions of the purchase order/contract.
- Individual repair part ordering data (IRPOD); or master procurement specification, as applicable.
- Any invoked standard technical requirements (STRS).
- Drawings referenced in the IRPOD, or master procurement specification , as applicable.
- Specifications referenced in the IRPOD, master procurement specifications or drawing(S), as applicable.
B. Effective issues of cited drawings, specifications, standards and other documents:
- The contractor shall comply with the specified revisions of the documents (i.e. drawings,specifications,standards and other documents) cited in the IRPOD and/or procurement specification contained herein. The contractor shall obtain written approval for the contracting officer to use document revisions other than those specified. When a later drawing revision is submitted for approval, two full size clear legible prints shall be provided.
- Where documents are referred to only by the basic identification name or number and no specific revision thereto, the contractor use of any issue of the document except all such revisions shall be dated 1 November 1969 or later.
C. Use of document revisions in their entirety:
- Contractors shall use revisions to each cited or referenced document in its entirety unless the contractor obtains contracting officer approval to do otherwise (i.e. the contractor shall not use portions of different revisions of a document). D. Vendor waiver/deviations on critical contracts. 1. Compliance with the delivery date and technical requirements of NAVSUP WSS critical repair part material contracts is expected.
- As the cautionary note contained in the contract states, seller intended use of any material which is not in full compliance with the specified contract technical requirements, should be identified as an exception in advance either at the time the quotation is submitted or prior to manufacture.
- Requests for delivery date extensions and waivers/deviations should be accompanied by an explanation of the cause for the delay, or the reason for the requested non-conformance with an offer of consideration in the event the CO
Clauses in this notice (16):
- Item Unique Identification and Valuation (Jan 2023)
- Inspection of Supplies--Fixed-Price (Aug 1996)
- Inspection and Acceptance - Short Version
- Stop-Work Order (Aug 1989)
- General Information-Fob-Destination
- Wide Area Workflow Payment Instructions (Jan 2023)
- First Article Approval--Government Testing (Sep 1989)
- Bechtel Plant Machinery INC 3500 Technology Drive Monroeville, PA 15146-2459 ATTN: Chad Work (Circuit Breakers)
- Notice of Cybersecurity Maturity Model Certification Level Requirements (Nov 2025))
- Federal Acquisition Supply Chain Security Act Orders-Prohibition (Dec 2023)
- Notice of Total Small Business Set-Aside (Oct 2020)(DEVIATION 2020-O0008)
- Alternate A, Annual Representations and Certifications (Oct 2025)
- Small Business Program Representations (Feb 2024)
- Annual Representations and Certifications (Mar 2025)(DEVIATION 2025-O0003 AND2025-O0004))
- Notice of Priority Rating for National Defense, Emergency Perpardeness, and ENRGY Progam Use (April 2008))
- Evaluation of First Article Testing
The description continues in the official notice.
Contracting contact
As published on the official notice. Ask questions in writing and before any questions deadline the notice sets.
Is your business small enough?
For NAICS 335313, a business counts as small if it has no more than 1,250 employees (SBA size standard). This notice is not set aside, but the size decides your small business status on it. SBA table, current as of Oct 15, 2026.
Notice history
- Oct 26, 2026: Solicitation Due Nov 23, 2026, 4:30 PM (UTC-4)
- Feb 3, 2026: Solicitation Due Mar 5, 2026, 4:30 PM (UTC-4)
Companies that win this kind of work
Federal contractors paid for switchgear and switchboard apparatus manufacturing work, who also hold Navy contracts (last 12 months): possible competitors, or partners to team with.
- Jo-Kell Inc. $19.9 million in this trade
- Eaton Corporation $9.2 million in this trade
- Northrop Grumman Systems Corporation $6.1 million in this trade
- L3 Technologies, Inc. $1.0 million in this trade
- Laurel Technologies Partnership $439,940 in this trade
About the buyer
The Department of the Navy awarded $132.1 billion in contracts in the last 12 months; its biggest suppliers were Electric Boat Corporation, Lockheed Martin Corporation and RTX Corporation. See what Navy is buying now.
Switchgear and Switchboard Apparatus Manufacturing contracts right now
There are 56 open government contract opportunities in this trade (NAICS 335313), 29 posted in the last 7 days; 30% are set aside for small businesses. The agencies buying the most are Defense Logistics Agency, Department of the Navy and Department of Energy. Most of the work with a stated place is in Tennessee, Virginia and Mississippi. A notice in this trade gives a median of 15 days from posting to deadline; this one gives 28 days.
All open switchgear and switchboard apparatus manufacturing contracts
Coming up in this trade
Planned contracts from the agencies' procurement forecasts, often months before a solicitation. Plans can change.
Recent awards in this trade
- Dutch Valley Supply Co. $61,026 · Defense Logistics Agency · Oct 23, 2026
- Hydra-Electric Company $34,320 · Defense Logistics Agency · Oct 23, 2026
- Larkos Packing And Distribution Inc. $350,000 · Defense Logistics Agency · Oct 22, 2026
- Universal Spartan LLC $350,000 · Defense Logistics Agency · Oct 21, 2026
- Ralphs Of Lafayette Inc. $350,000 · Defense Logistics Agency · Oct 21, 2026
From the award notices agencies publish.