Control and Status
Updated
Solicitation from the Department of the Navy. Due Nov 30, 2026, 2:00 PM (UTC-4), 31 days left.
| Title as posted | CONTROL AND STATUS |
|---|---|
| Solicitation number | N0038327RAA14 |
| Agency | Department of the Navy |
| Office | NAVSUP Weapon Systems Support |
| Notice type | Solicitation |
| Set-aside | None |
| Trade (NAICS) | Other Aircraft Parts and Auxiliary Equipment Manufacturing (336413) |
| Product or service code | 1680 |
| Posted | Oct 29, 2026 |
| Response deadline | Nov 30, 2026, 2:00 PM (UTC-4) (31 days left) |
| Add the deadline to | Google Calendar · Apple / Outlook (.ics) |
Description
This requirement is for the repair of the items herein this solicitation. Repair Turnaround Time (RTAT) definition: The contractual delivery requirementis measured from asset Return to the date of asset acceptance under the terms of the contract. For purposes of this section, return is defined as physical receiptof the F-condition asset at the contractor?s facility as reflected in the Action Dateentry in the commercial Asset Visibility (CAV) system.
In accordance with the CAVStatement of Work, the contractor is required to accurately report all transactions by the end of the fifth regular business day after receipt and the Action Date entered in CAV must be dated to reflect the actual date of physical receipt. The Contractor must obtain final inspection and acceptance by the Government for all assets within the RTATs established in the subsequent contract.
Required RTAT: ## ____ days after receipt of asset. Throughput Constraint: Contractor must provide a throughput Constraint for each NSN(s). Total assets to be repaired monthly after initial delivery commences X/month (contractor fill in #).
A throughput of ##____ per month reflects no throughput constraint. Reconciliation: A reconciliation modification will be issued after final Inspection and acceptance of all assets inducted under the subsequent contract. The parties have agreed to a price (shown on the schedule page of the contract) for each unit at the negotiated RTAT.
Such prices are based on the Contractor meeting the RTAT requirements described within the schedule page. If the Contractor does not meet the applicable RTAT requirement, consideration will be assessed and subject to negotiation. Induction Expiration Date: 365 days after contract award date.
Any asset received after this date in days is not authorized for repair without bi-lateral agreement between the Contractor and NAVSUP WSS Contracting Officer. \ 1. SCOPE 1.1 . Markings shall be in accordance with MIL-STD-130. 1.2 Articles to be furnished hereunder shall be repaired, tested and inspected in accordance with the terms and conditions specified in the Requirements Section of this document.
1.2.1 Any item contracted for repair SHALL have a Statement of Work to ensure compliance with all repair procedures and requirements. Repair of: Control and status ;control & status mo 1680-01-582-7988; NSN , ;70974 5204500-100-105; Part Number, Shall be performed IAW: CONTROL AND STATUS ;N/A; Publication (s). 1.2.2 There will be no repair deviation from the approved written procedures without review and acceptance by the Basic Design Engineer.
All requests for Waiver/Deviation shall be via Form 1694 routed throught the Local DCMA/ACO office for review and recommendations via form 1998. 1.3 Articles to be furnished hereunder shall be manufactured, tested and inspected in accordance with ;NORTHROP GRUMMAN SYSTEMS CORP; drawing number ( ;70974; ) ;5204500-100-105; , Revision ;LATEST; and all details and specifications referenced therein.
1.4 Unless expressly provided for elsewhere in this clause, equipment such as fixtures, jigs, dies, patterns, mylars, special tooling, test equipment, or any other manufacturing aid required for the manufacture and/or testing of the subject item(s) will not be provided by the Government or any other source and is the sole responsibility of the contractor. The foregoing applies notwithstanding any reference to such equipment or the furnishing thereof that may be contained in any drawing or referenced specification.
1.5 If MIL-STD-454 is referenced in the drawings or in the specification, the contractor is expected to show compliance with IPC/EIAJ-STD-001C. 2. Applicable documents - not applicable 3. REQUIREMENTS The contractor shall maintain a quality control system which meets the requirements of Mil-I-45208A, Mil-Q 9858,ISO-9000 / 9001 / 9002 or equivalent.
Responsibility for inspection: Unless otherwise specified, the contractor is responsible for the performance of all inspection requirements as specified herein. Except as otherwise specified, the contractor may use his own or any other facility suitable for the performance of the inspection requirements specified herein. PROCEDURES:The contractor shall prepare and maintain Quality Control Documentation, test and repair procedures, and inspection procedures which shall be made available to the Government for review and approval.
The pr
Clauses in this notice (21):
- Item Unique Identification and Valuation (Jan 2023)
- Higher-Level Contract Quality Requirement
- Inspection and Acceptance of Supplies
- Stop-Work Order (Aug 1989)
- Wide Area Workflow Payment Instructions (Jan 2023)
- Navy Use of Abilityone Support Contractor - Release of Offeror Information (3-18))
- Mandatory Use of Workflow Pro (WFP) Mod Assist Module
- Integrity of Unit Prices (Nov 2021)
- Safeguarding Sensitive Conventional Arms, Ammunition, and Explosives (Nov 2023)
- Equal Opportuity for Workers with Disabilities (DEV 2026-O0040)(Feb 2026)
- Transportation of Supplies by Sea (Oct 2024)
- Buy American-Free Trade Agreements-Balance of Payments Program-Basic (Feb 2024)
- Limitations on Pass-Through Charges (DEV 2026-O0048)(Mar 2026)
- Security Prohibitions and Exclusions (Class Deviation 2026-O0025)(Feb 2026)
- Buy American-Free Trade Agreements-Balance of Payments Program Certificate-Basic (Feb 2024))
- Buy American--Balance of Payments Program Certificate-Basic (Feb 2024)
- Alternate A, Annual Representations and Certifications (Deviation 2026-O0043)(Feb 2026))
- Royalty Information (Apr 1984)
- Type of Contract (DEV 2026-O0045)(Mar 2026)
- Notice of Priority Rating for National Defense, Emergency Preparedness, Andenergy Program Use (Apr 2008))
- Only One Offer (Deviation 2026-O0048)(Mar 2026)
The description continues in the official notice.
Contracting contact
As published on the official notice. Ask questions in writing and before any questions deadline the notice sets.
Is your business small enough?
For NAICS 336413, a business counts as small if it has no more than 1,250 employees (SBA size standard, with exceptions in the notes). This notice is not set aside, but the size decides your small business status on it. SBA table, current as of Oct 15, 2026.
Companies that win this kind of work
Federal contractors paid for other aircraft parts and auxiliary equipment manufacturing work, who also hold Navy contracts (last 12 months): possible competitors, or partners to team with.
- Northrop Grumman Systems Corporation $1.6 billion in this trade
- RTX Corporation $1.1 billion in this trade
- L3HARRIS Technologies Integrated Systems L.P. $953.7 million in this trade
- Lockheed Martin Corporation $857.7 million in this trade
- Bell Boeing Joint Project Office $852.8 million in this trade
About the buyer
The Department of the Navy awarded $132.1 billion in contracts in the last 12 months; its biggest suppliers were Electric Boat Corporation, Lockheed Martin Corporation and RTX Corporation. See what Navy is buying now.
Other Aircraft Parts and Auxiliary Equipment Manufacturing contracts right now
There are 706 open government contract opportunities in this trade (NAICS 336413), 271 posted in the last 7 days; 36% are set aside for small businesses. The agencies buying the most are Defense Logistics Agency, Department of the Navy and Department of the Air Force. Most of the work with a stated place is in Virginia, Oklahoma and Pennsylvania. A notice in this trade gives a median of 30 days from posting to deadline; this one gives 32 days.
All open other aircraft parts and auxiliary equipment manufacturing contracts
Coming up in this trade
Planned contracts from the agencies' procurement forecasts, often months before a solicitation. Plans can change.
Recent awards in this trade
- Triman Industries Inc $95,545 · Defense Logistics Agency · Oct 29, 2026
- S3 Aerodefense LLC $90,678 · Defense Logistics Agency · Oct 29, 2026
- LCF Systems, Inc. $59,687 · Defense Logistics Agency · Oct 29, 2026
- Aviator Systems Inc. $189,084 · Defense Logistics Agency · Oct 29, 2026
- Harry Miller Co LLC $38,584 · Defense Logistics Agency · Oct 29, 2026
From the award notices agencies publish.