Home / Navy / Other Metal Valve and Pipe Fitting Manufacturing / Notice

Disk, Rupturable

Updated

Solicitation from the Department of the Navy. Due Nov 16, 2026, 4:30 PM (UTC-4), 10 days left.

Be among the first to see new Other Metal Valve and Pipe Fitting Manufacturing contracts
Only new notices that match, once a day.
Title as postedDISK,RUPTURABLE
Solicitation numberN0010426QYAJ2
AgencyDepartment of the Navy
OfficeNAVSUP Weapon Systems Support Mech
Notice typeSolicitation
Set-asideNone
Trade (NAICS)Other Metal Valve and Pipe Fitting Manufacturing (332919)
Product or service code4820
PostedNov 5, 2026
Response deadlineNov 16, 2026, 4:30 PM (UTC-4) (10 days left)
Add the deadline toGoogle Calendar · Apple / Outlook (.ics)
Official notice
Send to a teammate

Description

Repair Turnaround Time (RTAT) definition: The contractual delivery requirement is measured from asset Return to the date of asset acceptance under the terms of the contract. For purposes of this section, Return is defined as physical receipt of the F-condition asset at the contractor's facility as reflected in the Action Date entry in the Commercial Asset Visibility (CAV) system.

In accordance with the CAV Statement of Work, the contractor is required to accurately report all transactions by the end of the fifth regular business day after receipt and the Action Date entered in CAV must be dated to reflect the actual date of physical receipt. The Contractor must obtain final inspection and acceptance by the Government for all assets within the RTATs established in this contract.

Required RTAT: ## 182 days after receipt of asset Throughput Constraint: Contractor must provide a throughput Constraint for each NSN(s). Total assets to be repaired monthly after initial delivery commences X/month (contractor fill in #). A throughput of ##____ per month reflects no throughput constraint.

Induction Expiration Date: 365 days after contract award date. Any asset received after this date in days is not authorized for repair without bi-lateral agreement between the Contractor and NAVSUP WSS Contracting Officer. If a firm fixed price (FFP) cannot be determined, please inform the PCO.

These items require Government source approval prior to award. If you are NOTAN approved source, you must submit, together with your proposal, theinformation detailed in the NAVSUP WSS source approval brochure which can beobtained online at navsup.navy.mil/public/navsup/w... under "commodities." Offers received which fail to provide all data requiredby the source approval brochure will not be considered for award under thissolicitation.

Please note, if evaluation of a source approval requestsubmitted hereunder cannot be processed in time and / or approval requirementspreclude the ability to obtain subject items in time to meet governmentrequirements, award of requirement may be continued based on fleet support needs.

  1. SCOPE 1.1 This contract/purchase order contains the requirements for repair and the contract quality requirements for the DISK,RUPTURABLE .
  2. APPLICABLE DOCUMENTS 2.1 Applicable Documents - The document(s) listed below form a part of this contract/purchase order including modifications or exclusions. 2.1.1 "Document References" listed below must be obtained by the Contractor.

Ordering information is included as an attachment to this contract/purchase order.

3. REQUIREMENTS 3.1 Cage Code/Reference Number Items - The DISK,RUPTURABLE repaired under this contract/purchase order shall meet the operational and functional requirements as represented by the Cage Code(s) and reference number(s) listed below. All repair work shall be performed in accordance with the contractors repair/overhaul standard practices, manuals and directives including but not limited to drawings, technical orders, manufacturing operations, tooling instructions, approved repair standards and any other contractor or government approved documents developed to provide technical repair procedures.

CAGE___Ref. No. ;73030 NV822184-2; 3.2 Marking - This item shall be physically identified in accordance with MIL-STD-130. 3.3 Changes in Design, Material Servicing, or Part Number - Except for a Code 1 change, which shall be processed as provided in the code statement shown below, no substitution of items shall be made until the NAVICP-MECH Contracting Officer has notified and approval has been given by issuance of a written change order.

When any change in design, material, servicing or part number is made to replace or substitute any item to be furnished on this contract/purchase order, the Contractor shall furnish, for the substituting/replacement item, a drawing and an explanation of the reason for the change, explaining the reason therefor. If finished detail drawings are not available, shop drawings in the form used by the manufacturer will be acceptable for Government evaluation.

When notifying the Procurement Contracting Officer of the reasons for making substitutions, the type of change shall be indicated by code number in accordance with one of the following statements: Code 1: PART NUMBER CHANGE ONLY - If the Manufacturer's Part Number indicated thereon has changed, but the parts are identical in all respects, supply the item and advise NAVICP-MECH immediately of the new part numb

Contact: TBD · TBD · TBD · TBD

Clauses in this notice (16):

Documents referenced (1): MIL-STD-130

The description continues in the official notice.

Contracting contact

As published on the official notice. Ask questions in writing and before any questions deadline the notice sets.

Is your business small enough?

For NAICS 332919, a business counts as small if it has no more than 750 employees (SBA size standard). This notice is not set aside, but the size decides your small business status on it. SBA table, current as of Oct 15, 2026.

Notice history

Companies that win this kind of work

Federal contractors paid for other metal valve and pipe fitting manufacturing work, who also hold Navy contracts (last 12 months): possible competitors, or partners to team with.

About the buyer

The Department of the Navy awarded $132.7 billion in contracts in the last 12 months; its biggest suppliers were Electric Boat Corporation, Lockheed Martin Corporation and RTX Corporation. See what Navy is buying now.

Other Metal Valve and Pipe Fitting Manufacturing contracts right now

There are 194 open government contract opportunities in this trade (NAICS 332919), 48 posted in the last 7 days; 12% are set aside for small businesses. The agencies buying the most are Department of the Navy, Defense Logistics Agency and US Coast Guard. Most of the work with a stated place is in Maryland, Maine and Washington. A notice in this trade gives a median of 29 days from posting to deadline; this one gives 11 days.

All open other metal valve and pipe fitting manufacturing contracts

Coming up in this trade

Planned contracts from the agencies' procurement forecasts, often months before a solicitation. Plans can change.

Reheat control valves and circuit settersautoflow cartridges manual isolation valves
Agricultural Research Service
Acquisition Planning · Award FY 2027 · $500K - $999K · Unknown
SSB NCAO BPA Call Swagelok TN-U1 (CGB)
Bureau of Reclamation
Acquisition Planning · Award FY 2027 · Below $150K · To Be Determined
Grant Creek AOPs
Forest Service
Awarded · Award FY 2026 · $500K - $999K · Unknown

Recent awards in this trade

From the award notices agencies publish.

Similar open other metal valve and pipe fitting manufacturing bids

Valve, Safety Relief
Defense Logistics Agency
Due Nov 16, 2026 · 10 days left
Solicitation · Posted Nov 5, 2026
Sleeve and Slide, DIREC
Defense Logistics Agency
Due Nov 16, 2026 · 10 days left
Solicitation · Posted Nov 5, 2026
Switch, Pressure
Defense Logistics Agency
Due Nov 16, 2026 · 10 days left
Solicitation · Small business · Posted Nov 5, 2026
Switch Assembly
Defense Logistics Agency
Due Nov 16, 2026 · 10 days left
Solicitation · Small business · Posted Nov 5, 2026
Coupling, Shaft, Rigid
Defense Logistics Agency
Due Nov 16, 2026 · 10 days left
Solicitation · Posted Nov 5, 2026
Valve, Regulating, Fluid
Defense Logistics Agency
Due Nov 16, 2026 · 10 days left
Solicitation · Posted Nov 5, 2026