Home / Army / Other Heavy and Civil Engineering Construction / Notice

Maintenance Dredging of New York and New Jersey Harbor – Arthur Kill 50 foot Reach Federal Navigation Project

Updated

Sources Sought from the Department of the Army. Due Dec 2, 2026, 2:00 PM (UTC-5), 14 days left.

Be among the first to see new Other Heavy and Civil Engineering Construction contracts
Only new notices that match, once a day.
Solicitation numberW912DS27S0009
AgencyDepartment of the Army
OfficeW2SD Endist New York
Notice typeSources Sought
Set-asideNone
Trade (NAICS)Other Heavy and Civil Engineering Construction (237990)
Product or service codeY1KF
PostedNov 17, 2026
Response deadlineDec 2, 2026, 2:00 PM (UTC-5) (14 days left)
Add the deadline toGoogle Calendar · Apple / Outlook (.ics)
Official notice
Send to a teammate

Description

Market Survey Background Information The New York District of the U.S. Army Corps of Engineers (USACE) proposes to perform maintenance dredging of the New York and New Jersey Harbor – Arthur Kill 50 foot Reach Federal Navigation Project to a depth of -50 feet Mean Lower Low Water (MLLW) plus 1 foot of allowable over-depth. The proposed maintenance dredging would remove approximately 150,000 cubic yards (CY) of material from the critical shoal area.

The dredged material would be dredged and subsequently placed at a suitable, contractor provided, state permitted upland placement site(s). The dredged material is expected to consist primarily of silt, clay, and some sand. Based on the past dredging projects within the New York Harbor, and anticipated restrictions found in the New York State Department of Environmental Conservation Water Quality Certificate, the proposed work can only be performed by utilizing a mechanical clamshell dredge with environmental bucket.

Additionally, tug-boats, sealed hull barges and survey vessels will be needed to perform the work during the dredging, transport, processing and placement activities. The dredging, transport and placement at a suitable, contractor provided, state permitted upland placement site(s) would be required to meet all federal, state, and local criteria required by the government agencies having jurisdiction where the dredging and placement sites are located.

All necessary permits required for the dredged material placement will be provided by the contractor to the government. The apparent low bidder shall, within 35 calendar days from the date the apparent low bidder is notified of being such, provide copies of all required permits and approvals for transportation, transfer, dewatering, processing, and final placement of dredged material, and shall submit evidence of such permits and approvals to the government.

Once the contract is awarded, the contractor will be required to commence work within five (5) calendar days after the date of receipt of the Notice to Proceed and maintain an integrated production rate of at least 3,000 cubic yards per calendar day for the dredging and placement of the dredged material. The presence of the dredging equipment in the channel will impact ship traffic, and it is necessary to maintain this production rate while minimizing the duration of this impact.

The proposed work is anticipated to take place in the summer / fall of 2027. SURVEY OF THE DREDGING INDUSTRY The following confidential survey questionnaire is designed to apprise USACE of prospective dredging contractors’ project execution capabilities. Please provide your response to the following questions.

All questions are in regard to the Arthur Kill 50 foot Reach maintenance dredging project. General

  1. Have you ever worked on dredging jobs similar in nature to this project? If so, please describe the project and for whom the work was performed. Identify a point of contact and phone number, as a reference of relevant experience.
  2. Have you performed dredging within the waters of the Port of New York and New Jersey?
  3. Do you have experience with the placement of dredged material at a suitable, contractor provided, state permitted upland placement site? Please list your experience.
  4. What percentage of work (volume of material dredged, transported, processed and ultimately placed) can you perform with your own equipment or equipment owned by another dredging contractor?
  5. Would you be willing to bid on the project previously described? If the answer is No, please explain why not.
  6. Would you be bidding on this project as a sole contractor, prime contractor with subcontractor(s) or as a joint venture?
  7. Is there a dollar limit on the size of contract that you would bid? If so, what is that limit?
  8. What is the largest dredging contract, in dollars, on which you were the prime contractor?
  9. What is your bonding capacity per contract? What is your total bonding capacity?
  10. Do you have experience using USACE Resident Management System (RMS) 3.0 for delivering Submittals, Daily Dredging Reports and Pay Estimates?
  11. In the event that the USACE transitions from Resident Management System (RMS) to an alternative construction management system during the contract, will the contractor be ready to adapt to the new management system?
  12. Do you have experience applying USACE EM 385-1-1 (Mar 2024) and all requirements? Deficiencies observed on site will require immediate attention and action to meet all applicable safety codes. Equipment
  13. What type of dredge equipment do you own and/or operate that is suitable for the work described? Do you own a mechanical dredge with a closed environmental clamshell bucket? Please list each piece of equipment capable of performing the work described, i.e. dredging, transfer, transportation, processing and final placement of the material. For each dredge that you list, please specify its bucket size(s), and any other salient characteristics.
  14. Identify which dredge(s), including support equipment (tug, crew boat, scows, etc.), you would employ on this project. Also, for each dredge, identify the maximum dredging depth.
  15. Do you own material scows? If so, how many do you have available for use? Please list the name of the scow, its type (ocean-going, sealed hull, etc) and the capacity.
  16. Do you have the capability to process the dredged material on your own? If so please explain. If not, what commercial provider of dredge material processing will you engage for this project? What is the daily processing capacity in either case?
  17. Will you be able to meet a production rate of 3,000 cubic yards per calendar day and complete all work?
  18. Do you have experience with the use of an automated Dredged Material Monitoring System (Black Box / Silent Inspector) employing a Dredged Material Inspector (DMI)?

Contracting contact

As published on the official notice. Ask questions in writing and before any questions deadline the notice sets.

Is your business small enough?

For NAICS 237990, a business counts as small if it has no more than $45.0 million in average annual receipts (SBA size standard). This notice is not set aside, but the size decides your small business status on it. SBA table, current as of Oct 15, 2026.

Companies that win this kind of work

Federal contractors paid for other heavy and civil engineering construction work, who also hold Army contracts (last 12 months): possible competitors, or partners to team with.

About the buyer

The Department of the Army awarded $112.7 billion in contracts in the last 12 months; its biggest suppliers were Lockheed Martin Corporation, The Boeing Company and Raytheon Company. See what Army is buying now.

Other Heavy and Civil Engineering Construction contracts right now

There are 199 open government contract opportunities in this trade (NAICS 237990), 41 posted in the last 7 days; 47% are set aside for small businesses. The agencies buying the most are Department of the Army, Departmental Offices and Department of Veterans Affairs. Most of the work with a stated place is in Louisiana, Virginia and Washington. A notice in this trade gives a median of 31 days from posting to deadline; this one gives 15 days.

All open other heavy and civil engineering construction contracts

Coming up in this trade

Planned contracts from the agencies' procurement forecasts, often months before a solicitation. Plans can change.

Boise River Diversion Dam Bridge Replacement
Department of the Interior
Acquisition Planning · Award FY 2026 · $150K - $249K · Small Business Set Aside - Total · Firm Fixed Price
NEW - 3 year maintenance contract of Steamboat Shoreline stabilization planting and Logboom
Department of the Interior
Acquisition Planning · Award FY 2026 · $250K - $499K · Small Business Set Aside - Total · Firm Fixed Price
NEW - Henry Hagg Lake Shoreline Stabilization - Barge Drilling; crane to load drill on barge
Department of the Interior
Acquisition Planning · Award FY 2026 · Below $150K · Small Business Set Aside - Total · Firm Fixed Price

Recent awards in this trade

From the award notices agencies publish.

Similar open other heavy and civil engineering construction bids

Port of Nome Modification - Phase 2
Department of the Army
Due Dec 17, 2026, 2:00 PM (UTC-9) · 29 days left
Presolicitation · Posted Nov 17, 2026
Synopsis - Repair Boca Chita Shoreline
Departmental Offices
Presolicitation · Small business · Posted Nov 17, 2026
Pass-A-Grille-Pass, Maintenance Dredging, Pinellas County, Florida
Department of the Army
Due Nov 20, 2026, 2:00 PM (UTC-5) · 2 days left
Solicitation · Small business · Posted Nov 17, 2026
Construct Interim Remedial Action (IRA) for the Nelson Tunnel Superfund Site
Department of the Army
Due Nov 20, 2026, 2:00 PM (UTC-6) · 2 days left
Presolicitation · Posted Nov 17, 2026
Construct Interim Remedial Action (IRA) for the Nelson Tunnel Superfund Site
Department of the Army
Due Jan 6, 2027, 1:00 PM (UTC-6) · 49 days left
Solicitation · Posted Nov 17, 2026
W9127N27BA005 Foster Spillway Gate Nut Replacements and Re-Tensioning
Department of the Army
Due Dec 16, 2026, 12:00 PM (UTC-8) · 28 days left
Presolicitation · Small business · Posted Nov 16, 2026