NM FLAP SR35(1) Grant County Bridges
Updated
Sources Sought from the Federal Highway Administration, for work in Mimbres, New Mexico. Due Dec 1, 2026, 2:00 PM (UTC-7), 14 days left.
| Solicitation number | 6982AF26B000010 |
|---|---|
| Agency | Federal Highway Administration |
| Office | 6982AF Central Federal Lands Divisi |
| Notice type | Sources Sought |
| Set-aside | None |
| Trade (NAICS) | Highway, Street, and Bridge Construction (237310) |
| Product or service code | Y1LB |
| Place of performance | Mimbres, New Mexico |
| Posted | Nov 16, 2026 |
| Response deadline | Dec 1, 2026, 2:00 PM (UTC-7) (14 days left) |
| Add the deadline to | Google Calendar · Apple / Outlook (.ics) |
Federal prevailing wage rates for this place: New Mexico Davis-Bacon and SCA wage determinations.
Description
This is not an invitiation for bid, plan and SPEFICIATIONS are not AVAILBLE project number: NM FLAP SR35(1) PROJECT NAME: Grant county bridges set- aside: FULL AND OPEN Competition with HUBZone Price Preference PROJECT DESCRIPTION: The Grant County Bridges Project is located near Mimbres, New Mexico, in Grant County, along State Route (SR) 35. SR 35 serves as a 27?mile highway providing access to the Gila National Forest, connecting SR 15 in Silver City to SR 152 in Mimbres.
The proposed improvements include work at four locations along SR 35: Bridge 1330 — Milepost (MP) 0.5 Concrete box culvert — MP 4.65 Bridge 1873 — MP 5.2 Bridge 1876 — MP 8.42 SCOPE OF THE WORK: The project includes reconstruction of three bridges and a concrete box culvert. Improvements would provide reliable and safe access to the Gila National Forest for local and regional travelers.
Improvements to these structures would also benefit travelers by accessing residential and commercial properties along SR 35. Schedule A includes: The project includes demolition of the existing bridge and construction of three (3) new simple-span, precast, prestressed concrete bridges: an 80?ft simple span with precast prestressed I?girders and a cast?in?place reinforced concrete deck; a skewed 55?ft?6?in simple span using precast, prestressed voided slabs with a cast?in?place (CIP) concrete overlay; and a 36?ft simple span using precast, prestressed voided slabs with a cast?in?place (CIP) concrete overlay.
Bridge 1, a 80?ft simple span: precast, prestressed I?girders with a cast?in?place reinforced concrete deck. Bridge 2, a 55?ft?6?in skewed simple span: precast, prestressed voided slabs with a cast?in?place (CIP) concrete overlay. Bridge 3, 36?ft simple span: precast, prestressed voided slabs with a cast?in?place (CIP) concrete overlay.
Option X includes: The work consists of removing an existing open-bottom concrete box culvert and replacing it with a 10?ft by 5?ft reinforced concrete box culvert. PRINCIPAL WORK ITEMS: Schedule A Removal of Bridge 484 Cuyd of Structural Concrete 707 LNFT of Precast, prestressed concrete slabs 48 inch voided (15” and 18”) 80,900 LB of reinforced steel epoxy coated 511 LNFT Bridge railing steel 800 LNFT drilled shaft 30 inches.
40 weeks of Temporary Traffic control flagger and Traffic Control Supervisor Option X 2 Each Concrete headwall (including wing walls) 60 LNFT, 10 ft span, 5 ft rise precast reinforced box culvert 5 weeks of Traffic Control Supervisor ESTIMATED COST RANGE: The estimated price range is between $10,000,000 and $20,000,000. ITEMS WORTH NOTING: Construction in Mimbres can be maintained through all seasons, but you must factor in cold-weather provisions for the winter months to ensure the integrity and quality of critical bridge and culvert materials like concrete and sealants.
Contracting contact
- Laura Slauter · [email protected]
- Kelly Palmer · [email protected]
As published on the official notice. Ask questions in writing and before any questions deadline the notice sets.
Is your business small enough?
For NAICS 237310, a business counts as small if it has no more than $45.0 million in average annual receipts (SBA size standard). This notice is set aside, so only businesses under that size, or in the named program, can bid. SBA table, current as of Oct 15, 2026.
Highway, Street, and Bridge Construction contracts right now
There are 54 open government contract opportunities in this trade (NAICS 237310), 16 posted in the last 7 days; 76% are set aside for small businesses. The agencies buying the most are Federal Highway Administration, Forest Service and Department of the Army. Most of the work with a stated place is in Colorado, Montana and North Dakota. A notice in this trade gives a median of 28 days from posting to deadline; this one gives 15 days.
All open highway, street, and bridge construction contracts
Coming up in this trade
Planned contracts from the agencies' procurement forecasts, often months before a solicitation. Plans can change.
Recent awards in this trade
- WSP USA Solutions Inc $211,681 · Department of the Army · Oct 28, 2026
- Aspen Construction Company $132.7 million · Department of the Air Force · Sep 30, 2026
- David Taylor Construction, Inc. $2.8 million · Department of the Army · Sep 29, 2026
- Titan Industrial Services, Inc $8.6 million · Department of the Army · Sep 22, 2026
- Titan Industrial Services, Inc $8.6 million · Department of the Army · Sep 22, 2026
From the award notices agencies publish.