Home / Navy / Bare Printed Circuit Board Manufacturing / Notice

Printed Circuit Boa

Updated

Solicitation from the Department of the Navy. Due Dec 8, 2026, 2:00 PM (UTC-4), 25 days left.

Be among the first to see new Bare Printed Circuit Board Manufacturing contracts
Only new notices that match, once a day.
Title as postedPRINTED CIRCUIT BOA
Solicitation numberN0038326RAB09
AgencyDepartment of the Navy
OfficeNAVSUP Weapon Systems Support
Notice typeSolicitation
Set-asideNone
Trade (NAICS)Bare Printed Circuit Board Manufacturing (334412)
Product or service code5998
PostedNov 12, 2026
Response deadlineDec 8, 2026, 2:00 PM (UTC-4) (25 days left)
Add the deadline toGoogle Calendar · Apple / Outlook (.ics)
Official notice
Send to a teammate

Description

The quantity for this repair requirement is now reduced to 2. This requirement is for the repair of the items herein this solicitation. Repair Turnaround Time (RTAT) definition: The contractual delivery is measured from asset Return to the date of asset acceptance under the terms of the contract.

For purposes of this section, return is defined as physical receipt of the F-condition asset at the contractor's facility as reflected in the Action Date entry in the commercial Asset Visibility (CAV) system. In accordance with the CAV Statement of Work, the contractor is required to accurately report all transactions by the end of the fifth regular business day after receipt and the Action Date entered in CAV must be dated to reflect the actual date of physical receipt.

The Contractor must obtain final inspection and acceptance by the Government for all assets within the RTATs established in the subsequent contract. Required RTAT: ## ____ days after receipt of asset. Throughput Constraint: Contractor must provide a throughput Constraint for each NSN(s).

Total assets to be repaired monthly after initial delivery commences X/month (contractor fill in #). A throughput of ##____ per month reflects no throughput constraint. Reconciliation: A reconciliation modification will be issued after final Inspection and acceptance of all assets inducted under the subsequent contract.

The parties have agreed to a price (shown on the schedule page of the contract) for each unit at the negotiated RTAT. Such prices are based on the Contractor meeting the RTAT requirements described within the schedule page. If the Contractor does not meet the applicable RTAT requirement, consideration will be assessed and subject to negotiation.

Induction Expiration Date: 365 days after contract award date. Any asset received after this date in days is not authorized for repair without bi-lateral agreement between the Contractor and NAVSUP WSS Contracting Officer. \ 1. SCOPE 1.1 .

Markings shall be in accordance with MIL-STD-130. 1.2 Articles to be furnished hereunder shall be manufactured, tested and inspected in accordance with ;BAE SYSTEMS INFORMATION AND ELECTRONIC SYSTEMS INTEGRATION; drawing number ( ;80249; ) ;8581299-1; , Revision ;LATEST; and all details and specifications referenced therein. 1.3 Unless expressly provided for elsewhere in this clause, equipment such as fixtures, jigs, dies, patterns, mylars, special tooling, test equipment, or any other manufacturing aid required for the manufacture and/or testing of the subject item(s) will not be provided by the Government or any other source and is the sole responsibility of the contractor.

The foregoing applies notwithstanding any reference to such equipment or the furnishing thereof that may be contained in any drawing or referenced specification. 1.4 If MIL-STD-454 is referenced in the drawings or in the specification, the contractor is expected to show compliance with IPC/EIAJ-STD-001C. 2. Applicable documents - not applicable 3.

REQUIREMENTS 3.1 1.0 GENERAL 3.1.1 This Statement of Work (SOW) establishes the criteria for repair and testing /inspection of the subject item. It includes inspection, component repair and replacement,reassembly and testing procedures required to return units back into a servicable condition. 3.2 2.0 DEFINITIONS.

3.2.1 CONTRACTOR: Is defined as the successful offeror awarded a contract, orderor issued a project work order. The term "contract" encompasses a contract, an order, or a project work order. 3.2.2 OVERHAUL: An overhauled part is one which has been disassembled, cleaned, inspected, repaired as necessary (by replacing or repairing all components which have been found to exceed limits established by the repair/overhaul manual) reassembled and tested in accordance with the approved repair/overhaul manual listed in this SOW and returned to a Ready for Issue (RFI) condition (Refer to contract schedule for items to be overhauled).

3.2.3 REPAIR: A repaired part is one which has been restored to a Ready for Issue(RFI) condition (by replacing or repairing those components found to be defective, broken, damaged or inoperative during the initial evaluation and troubleshooting phase) and tested in accordance with the approved repair/overhaul manual listed in this SOW (Refer to contract schedule for items to be repaired).

3.3 3.0 SCOPE 3.3.1 GENERAL. The items to be furnished hereunder shall be overhauled, upgraded,repaired, tested, inspected, and accepted in accordance with the terms and conditions specified in this contract. Unless expressly provided Government

Clauses in this notice (18):

The description continues in the official notice.

Contracting contact

As published on the official notice. Ask questions in writing and before any questions deadline the notice sets.

Is your business small enough?

For NAICS 334412, a business counts as small if it has no more than 750 employees (SBA size standard). This notice is not set aside, but the size decides your small business status on it. SBA table, current as of Oct 15, 2026.

Notice history

Companies that win this kind of work

Federal contractors paid for bare printed circuit board manufacturing work, who also hold Navy contracts (last 12 months): possible competitors, or partners to team with.

About the buyer

The Department of the Navy awarded $130.1 billion in contracts in the last 12 months; its biggest suppliers were Electric Boat Corporation, Lockheed Martin Corporation and RTX Corporation. See what Navy is buying now.

Bare Printed Circuit Board Manufacturing contracts right now

There are 150 open government contract opportunities in this trade (NAICS 334412), 36 posted in the last 7 days; 9% are set aside for small businesses. The agencies buying the most are Defense Logistics Agency and Department of the Navy. Most of the work with a stated place is in Pennsylvania and Washington. A notice in this trade gives a median of 31 days from posting to deadline; this one gives 26 days.

All open bare printed circuit board manufacturing contracts

Recent awards in this trade

From the award notices agencies publish.

Similar open bare printed circuit board manufacturing bids

F-16 - Circuit Card Assembly
Defense Logistics Agency
Due Dec 14, 2026, 11:59 PM (UTC-7) · 31 days left
Sources Sought · Posted Nov 12, 2026
ISBC VME120
Defense Logistics Agency
Due Dec 11, 2026, 4:30 PM (UTC-4) · 28 days left
Solicitation · Posted Nov 12, 2026
TTAP SBC
Defense Logistics Agency
Due Nov 24, 2026, 4:30 PM (UTC-4) · 11 days left
Solicitation · Posted Nov 12, 2026
Circuit Card ASSY
Department of the Navy
Due Jan 22, 2027, 4:30 PM (UTC-4)
Solicitation · Posted Nov 12, 2026
Circuit Card Assemb
Department of the Navy
Due Jan 22, 2027, 4:30 PM (UTC-4)
Solicitation · Posted Nov 12, 2026
Printed Circuit Boa
Department of the Navy
Due Dec 11, 2026, 4:30 PM (UTC-4) · 28 days left
Solicitation · Posted Nov 12, 2026