Home / Army / Notice

Production of Small Unmanned Aircraft Systems (sUAS) Lethality Payloads at Pine Bluff Arsenal

Updated

Special Notice from the Department of the Army, for work in Pine Bluff, Arkansas. Due Dec 14, 2026, 4:00 PM (UTC-6), 44 days left.

Be among the first to see new government bids that match your business
Only new notices that match, once a day.
Solicitation numberW519TC27CSUAS
AgencyDepartment of the Army
OfficeAcc
Notice typeSpecial Notice
Set-asideNone
Place of performancePine Bluff, Arkansas
PostedOct 30, 2026
Response deadlineDec 14, 2026, 4:00 PM (UTC-6) (44 days left)
Add the deadline toGoogle Calendar · Apple / Outlook (.ics)
Official notice
Send to a teammate

Bid documents (1)

Paid members download every document from this page, or buy this bid alone.

Federal prevailing wage rates for this place: Arkansas Davis-Bacon and SCA wage determinations.

Description

30 OCT 2026 The response due date is 4:00 PM CST on 14 DEC 2026. Submit responses to this request for partnership solutions to [email protected] and [email protected] with subject line: PSO Response Production of Small Unmanned Aircraft Systems (sUAS) Lethality Payloads at Pine Bluff Arsenal (PBA). Partnership Solutions Opening – Request for Whitepapers Agency: Department of War (DoW) / Army Materiel Command (AMC) Notice Type: Partnership Solutions Opening (PSO) Title: Production of sUAS Lethality Payloads at PBA.

1.0 Introduction & authority The U.S. Army Materiel Command (AMC) is issuing this request for partnership solutions via white paper submission solely for market research, planning, and concept exploration regarding a potential Public-Private Partnership (P3) under the authority of 10 U.S.C. 7544. The Government is requesting specific conceptual solutions on how to optimally structure and execute P3 Cooperative Arrangements.

The core objective is to leverage private investment to modernize Government facilities to Industry 4.0 and 5.0 automation standards. Industry 4.0 is defined as the Fourth Industrial Revolution, is characterized by the "Smart Factory."

It aims to create highly efficient, autonomous production lines by integrating cyber-physical systems with the Internet of Things (IoT) and cloud computing. Industry 5.0 is not meant to replace Industry 4.0 but to refine it. It recognizes that pure automation can overlook human creativity and environmental impact.

It places the well-being of the worker and the planet at the center of the industrial process. This modernization will enable authorized co-production and facility-use activities that mutually benefit the Government's national security mission and the private partner's commercial enterprise. Disclaimer: This PSO does not constitute a Request for Proposals (RFP), nor is it a procurement action governed by the Federal Acquisition Regulation (FAR).

The Government is not obligated to enter into any cooperative arrangement or agreement because of this PSO and will not reimburse respondents for any costs associated with submitting a response. 2.0 PROBLEM STATEMENT PBA is requesting a commercial partnership to support the development and production of lethal energetic payloads for sUAS and Electronic Safe & Arming Devices (ESAD).

These efforts include scaling low-cost, modernized sUAS lethality and energetic payload manufacturing. PBA intends for flexible production lines with ability to accommodate modular manufacturing capabilities for differing explosives, varying payload sizes, explosive safe and arming devices, energetic airframes, etc. PBA can provide both logistical and facility support, including approximately 100,000 square feet of storage and production capacity.

The government has various 1 or 2 story buildings available in area 34-000 ranging in size from 396 sq ft to 13,551 sq ft with various existing capabilities to include electricity, water, air sewer, Natural Gas, and/or steam. Additional building details provided in Attachment 1. The production facilities were constructed in 1941-42 for the war effort to handle highly volatile chemical, pyrotechnic, and incendiary compounds.

Structurally and architecturally, these buildings reflect a combination of standardized strict hazard segmentation, and fortified safety engineering. Buildings are constructed with heavy, reinforced concrete interior blast walls and thick foundations, but with deliberately weak, lightweight exterior walls and roofs. PBA can provide the following support: • Direct labor • Engineering • Base operations • Logistical support • Environmental and safety support, including leveraging PBA's existing Explosive Site Safety Plans to expedite the mandatory joint site-licensing updates required for the partner's specific energetic footprint and, as applicable, for any non-Department of Defense owned toxic or hazardous materials, supporting Government coordination and processing of a 10 U.S.C. 2692 exception request; the contractor remains responsible for providing the technical, environmental, safety, and operational information required to support that request. • Utilities: Existing utility systems vary by facility as shown in Attachment 1.

The contractor is responsible for any necessary capital investments required to utilize these utilities, including the procurement and installation of utility meters, sub-meters, service hookups, and distribution lines. 3.0 FINANCIAL & INVESTMENT REQUIREMENTS (CAPITAL EXPENDITURES) To accelerate modernization without requiring upfront Government funding, the selected industry partner(s) must meet the following financial parameters: Private Equity Financed Capital Expenditures (CapEx): An industry partner(s) must utilize private equity or internal corporate capital to fund 100% of the modernization CapEx for the targeted building(s).

Scope of CapEx: This investment must cover all necessary facility upgrades, structural modifications, equipment procurement, software integration, and physical installation. Permanent upgrades become Government property upon installation, with the contractor retaining operational use for the duration of the agreement. 4.0 OPERATIONAL CONCEPT: COOPERATIVE ARRANGEMENT In exchange for the capital investment, the Government will enter a Cooperative Arrangement pursuant to 10 U.S.C. 7544(a).

Commercial Capacity Guarantee (Facilities Use): In accordance with 10 U.S.C 7544(b)(5), an industry partner will be granted a facilities-use contract guaranteeing a portion of the capacity of the modernized/new lines for their own commercial requirements, with the precise amount to be negotiated based on the overall structure of the partnership, other in-kind considerations offered, etc. Excess Capacity Utilization: Pursuant to 10 U.S.C 7544(c)(3), an industry partner is authorized to use any additional excess capacity not actively utilized or identified for future by the Govern

The description continues in the official notice.

Contracting contact

As published on the official notice. Ask questions in writing and before any questions deadline the notice sets.

About the buyer

The Department of the Army awarded $84.6 billion in contracts in the last 12 months; its biggest suppliers were Lockheed Martin Corporation, Raytheon Company and The Boeing Company. See what Army is buying now.