Home / Army / Commercial and Institutional Building Construction / Notice

Progressive Design Build - 26,000 SF hangar at Lakehurst on Joint Base McGuire-Dix-Lakehurst (JBMDL).

Updated

Sources Sought from the Department of the Army, for work in Joint Base MDL, New Jersey. Due Nov 12, 2026, 2:00 AM (UTC-5), 9 days left.

Be among the first to see new Commercial Construction contracts
Only new notices that match, once a day.
Solicitation numberW912DS27S0005
AgencyDepartment of the Army
OfficeW2SD Endist New York
Notice typeSources Sought
Set-asideNone
Trade (NAICS)Commercial and Institutional Building Construction (236220)
Product or service codeY1BZ
Place of performanceJoint Base MDL, New Jersey
PostedNov 2, 2026
Response deadlineNov 12, 2026, 2:00 AM (UTC-5) (9 days left)
Add the deadline toGoogle Calendar · Apple / Outlook (.ics)
Official notice
Send to a teammate

Bid documents (1)

Paid members download every document from this page, or buy this bid alone.

Federal prevailing wage rates for this place: New Jersey Davis-Bacon and SCA wage determinations.

Description

The U.S. Army Corps of Engineers (USACE), New York District, has a requirement for the design and construction of a new roughly 26,000 SF hangar at Lakehurst on Joint Base McGuire-Dix-Lakehurst (JBMDL). The project is anticipated to provide a permanent, secure, and efficiently configured Naval Secure Test and Research (NavSTAR) hangar to support aircraft compatibility testing at the Lakehurst test site on JBMDL.

The Government is seeking industry feedback regarding the most effective means to plan, design, procure, construct, commission, and transition the new hangar. 1. NavSTAR Hangar Facility and Utility Systems New Hangar Facility: Construct a new permanent 25,172 SF footprint steel-frame hangar facility west of Bldg. 685 to support simultaneous 1-in/1-out fixed-wing carrier aircraft compatibility testing.

Space includes several secure rooms that must be designed, built, and certified to the current ICD 705 standards with all appropriate secure network connections. Include a fully climate-controlled maintenance and testing bay, maintenance workshop, two (2) logistics warehouses, a payloads storage room, a security office, and dedicated support space for personnel. Ensure the facility incorporates high-performance and sustainable building design features maximizing energy efficiency in accordance with DoD Unified Facilities Criteria (UFC), federal laws, and Executive Orders to meet or exceed useful service life.

Primary Power and Electrical Distribution: Provide a new 750 kW standby generator to supply emergency/backup power to the hangar facility and its secure testing operations. Provide complete primary and secondary electrical distribution systems, including transformers, apron lighting, and exterior security lighting. Integrate telecommunications infrastructure and secure communications lines directly with the existing installation network.

Climate Control, Mechanical, and Fire Systems: Provide a fully climate-controlled HVAC system tailored for the maintenance/testing bay and personnel support areas, including dedicated environmental controls for secure operational zones. Provide potable water lines, sanitary sewer lines, natural gas piping, and a dedicated fire suppression system. Ensure all mechanical systems utilize life-cycle cost-effective, high-efficiency systems engineered for long-term utility-support operations.

Commissioning, OMSI, and Post-Award Support: Provide complete system commissioning, cybersecurity feature testing, and operational validation. Develop and deliver Operations and Maintenance Support Information (OMSI) technical manuals to the Government. Provide Post Construction Award Services (PCAS) to support transition-to-operations.

2. Civil, Structural, and Site Infrastructure Site Preparation, Grading, and Drainage: Perform site clearing, excavation, and site preparation, including the possibility of 10,000 CY of bulk cut/fill earthwork. Implement a comprehensive storm water management facility incorporating Low Impact Development (LID) design elements to control runoff and protect local ecosystems.

Foundations and Structural Systems: Construct a structural steel-frame building super-structure utilizing a built-up roofing assembly. Provide a spread footing reinforced concrete foundation engineered to mitigate local soil bearing and settlement risks. Paving and Site Access Improvements: Construct a dedicated fixed-wing taxiway to connect the hangar with the adjacent catapult system on the test runway.

Construct a rotary-wing parking apron, a hangar access apron, and organizational vehicle parking. Construct dedicated concrete and asphalt access roads, including curbs, grading, and sidewalks, connecting the facility directly to the existing base road network via Deweese Road and E. Clubhouse Lake Road. 3.

Utility Connections, Interfaces, and Cutover Work Existing Utility Interfaces: Connect the new facility to existing base potable water, sanitary sewer, natural gas, electrical, telecommunications, and storm water drainage networks. Confirm existing-system capacities, tie-in locations, and coordinate necessary utility outage windows with base public works. Operational Continuity & Interface Management: Coordinate all tie-in actions directly adjacent to the existing active catapult system on the test runway to ensure zero unplanned disruptions to active aircraft compatibility testing.

Coordinate utility cutovers and final energization sequences with JBMDL installation operations to maintain continuous mission capabilities. 4. Security, Cybersecurity, and Site Safeguards Physical Security and Site Access: Provide dedicated physical security features in accordance with Geographic Combatant Commander policies and Unified Facilities Criteria (UFC) for DoD Minimum Antiterrorism Standards for Buildings.

Construct roughly 650 LF of 8-foot industrial chain-link perimeter security fencing to establish a secure boundary. Install two (2) overhead vehicle slide gates to provide strictly controlled physical access to the secure aircraft operational apron and hangar apron areas. Cybersecurity and Secure Information Exchange: Provide robust cybersecurity features for all Facility-Related Control Systems (FRCS) in accordance with current DoD criteria.

Ensure secure communications infrastructure and information systems are fully commissioned, with all technical compliance costs fully integrated under the early-stage conservative risk posture. Securely handle and store all project data, design files, and specifications in accordance with federal laws and regulations governing Controlled Unclassified Information (CUI). Estimated Acquisition Magnitude: $50,000,000.00 to $75,000,000.00

Contracting contact

As published on the official notice. Ask questions in writing and before any questions deadline the notice sets.

Is your business small enough?

For NAICS 236220, a business counts as small if it has no more than $45.0 million in average annual receipts (SBA size standard). This notice is not set aside, but the size decides your small business status on it. SBA table, current as of Oct 15, 2026.

Companies that win this kind of work

Federal contractors paid for commercial and institutional building construction work, who also hold Army contracts (last 12 months): possible competitors, or partners to team with.

About the buyer

The Department of the Army awarded $83.4 billion in contracts in the last 12 months; its biggest suppliers were Lockheed Martin Corporation, Raytheon Company and The Boeing Company. See what Army is buying now.

Commercial and Institutional Building Construction contracts right now

There are 294 open government contract opportunities in this trade (NAICS 236220), 122 posted in the last 7 days; 60% are set aside for small businesses. The agencies buying the most are Department of Veterans Affairs, Department of the Army and Department of the Navy. Most of the work with a stated place is in California, New York and North Carolina. A notice in this trade gives a median of 20 days from posting to deadline; this one gives 10 days.

All open commercial and institutional building construction contracts

Coming up in this trade

Planned contracts from the agencies' procurement forecasts, often months before a solicitation. Plans can change.

SAFB Card Reader Cabling Replacement
General Services Administration
Evaluation Stage · Award FY 2026 · Below $150K · Firm Fixed Price
HSI Wet Cell ESS
General Services Administration
Acquisition Planning · Award FY 2026 · Below $150K · 8(a) Sole Source · Firm Fixed Price
USDC Carpet Refresh Chambers
General Services Administration
Acquisition Planning · Award FY 2026 · Below $150K · 8(a) Sole Source · Firm Fixed Price

Recent awards in this trade

From the award notices agencies publish.

Similar open commercial and institutional building construction bids

Construction of F16 Mission Training Center
Department of the Army
Solicitation · Small business · Egg Harbor Township, NJ · Posted Nov 2, 2026
561-26-103 Upgrade Electrical and Plumbing in Building 18B
Department of Veterans Affairs
Due Nov 30, 2026, 9:45 AM (UTC-5) · 27 days left
Solicitation · Service-disabled veteran-owned · East Orange, NJ · Posted Oct 29, 2026
Design/Build Maintenance and Repair Army Reserve (MRAR), Area Maintenance Support Activity (AMSA) 21, JBMDL, NJ
Department of the Army
Due Dec 21, 2026, 2:00 PM (UTC-5) · 48 days left
Presolicitation · Small business · Joint Base MDL, NJ · Posted Oct 8, 2026
Department Of Energy - National Nuclear Security Administration Joint Cyber Facility Construction Solicitation
Public Buildings Service
Due Dec 7, 2026, 11:00 AM (UTC-7) · 34 days left
Presolicitation · Lakewood, CO · Posted Nov 2, 2026
Re-slurry and Re-stripe Bldg. 88 and 98 Parking Lots
Department of Veterans Affairs
Due Nov 6, 2026, 12:00 PM (UTC-8) · 3 days left
Solicitation · Posted Nov 2, 2026
Design and construction of 5,964 SF addition to an existing aircraft paint shop and installation of a media blast booth
Department of the Army
Due Nov 18, 2026, 2:00 PM (UTC-8) · 15 days left
Sources Sought · Joint Base Lewis McChord, WA · Posted Nov 2, 2026