Home / Army / Commercial and Institutional Building Construction / Notice

Progressive Design-Build (PDB) - USSF Integration Facility F/10852 at WPAFB

Updated

Special Notice from the Department of the Army, for work in Wright Patterson AFB, Ohio. Due Nov 30, 2026, 11:00 AM (UTC-5), 17 days left.

Be among the first to see new Commercial Construction contracts
Only new notices that match, once a day.
Solicitation numberW912QR-PDB-USSF-Integration-Facility
AgencyDepartment of the Army
OfficeW072 Endist Louisville
Notice typeSpecial Notice
Set-asideNone
Trade (NAICS)Commercial and Institutional Building Construction (236220)
Product or service codeZ2AZ
Place of performanceWright Patterson AFB, Ohio
PostedNov 12, 2026
Response deadlineNov 30, 2026, 11:00 AM (UTC-5) (17 days left)
Add the deadline toGoogle Calendar · Apple / Outlook (.ics)
Official notice
Send to a teammate

Federal prevailing wage rates for this place: Ohio Davis-Bacon and SCA wage determinations.

Description

SPECIAL NOTICE The U.S. Army Corps of Engineers (USACE) is issuing this special notice to announce an upcoming competition for a design and construction solicitation for the US Space Force Integration Facility, F/10852 using Progressive Design-Build under 10 USC §2808a Other Transaction Authority for Construction. This notice is for informational and planning purposes to allow interested parties to prepare for and provide feedback prior to the official solicitation release.

I. INDUSTRY DAY USACE intends to conduct an Industry Day on 03 December 2026 at 0900 Eastern Time to provide an overview of the project, acquisition strategy, and anticipated requirements. This event will provide interested parties with an opportunity to gain additional insight into the project and proposed PDB under an OT (non-FAR-based) framework. A notional acquisition schedule will be shared.

Interested parties are encouraged to ask questions and provide input. General questions will be permitted during the Industry Day; however, all discussions and responses provided during the event are considered unofficial and are for informational purposes only. Statements made during the Industry Day do not constitute commitment, authorization, or binding guidance related to the future RFQ.

Official Questions and Answers (Q&A) will be accepted and addressed following the release of RFQ. II. LOCATION Industry Day Presentation location: Hope Hotel, 10823 Chidlaw Rd # A, Dayton, OH 45433 III.

PROJECT OVERVIEW Project Title: US Space Force Integration Facility, F/10852 Location: Wright-Patterson Air Force Base (WPAFB), OH NAICS Code: 236220 Total Program Funding: $394,000,000.00 IV. PROJECT DESCRIPTION The USSF Integration Facility is a newly programmed mission at Wright-Patterson Air Force WPAFB, Ohio. It serves as a highly classified and secured contiguous operations area to enable Director for National Intelligence (DNI) and United States Space Force (USSF) directed and endorsed missions in areas of the highest national security, housing intelligence analysis and production for new and expanded all-source means that enable near-real-time capabilities.

The facility supports the intelligence needs of the Defense Intelligence Enterprise, USSF, joint warfighters, policymakers, and acquisition professionals, driving intelligence, surveillance, and reconnaissance (ISR) for space domain operations including detection, characterization, and targeting of adversary space capabilities. The adjacent existing facility, Building F/10854, will remain fully occupied and uninterrupted, maintaining 24/7 business operations and ICD 705 security accreditation throughout construction, requiring strict utility, access, physical security, and logistical phasing constraints.

Construction is broken into distinct agreement phases under the Progressive Design-Build (PDB) framework. Phase 1 (Design & Pre-Construction): This Phase is structured to collaboratively advance the facility design from initial concepts to 65% design maturity, perform detailed constructability reviews, conduct transparent open-book cost estimating, identify and mitigate complex interface risks, and validate the overall space programming.

Pre-construction services will establish a baseline cost and allow for early design and potential separate authorization of long-lead procurement items. Phase 2 (Final Design and Construction): This Phase will include the completion of final design documents (95% and 100% Certified Final), fast-tracking capabilities, and all physical construction activities, including structural, interior finishes, specialized secure Sensitive Compartmented Information Facility (SCIF) fit-out, redundant systems commissioning, and final security accreditation.

Phase 2 will also include comprehensive site work, utility distribution integration, and connection into the active Building F/10854. Phase 2 covers construction of the multi-floor, approximately 333,700 SF secure USSF Integration Facility, including the physical connection to active Building F/10854, the integration of high-efficiency HVAC networks, a backup generator facility, high-security electrical switchgear, and the buildout of specialized SCIF and SAP compartments.

The Government will use available concept design information, programmed requirements, and initial planning data as the initial technical baseline. During Phase 1, the selected Design-Builder will validate the baseline and may recommend refinements; any material deviation from the Government’s baseline will require Government review and approval. The scope generally encompasses the following critical lines of effort: Critical Infrastructure and Utilities: Installation of high-efficiency mechanical, electrical, plumbing (MEP), heating, ventilation, and air conditioning (HVAC) systems designed for 24/7 continuous operation, electrical tie-ins to centralized utilities, backup generator integration (7,500 KW), Lightning Protection Systems (LPS), and addressable fire protection networks.

Secure Facilities: Turnkey design, construction, and Defense Intelligence Agency (DIA) accreditation of highly classified Special Access Program (SAP) SCIF spaces built to stringent ICD 705, IC Tech Spec, and Telecommunictaions Electronics Material Protected from Emanating Spurious Tranmission (TEMPEST) shielding standards to ensure complete physical, visual, and acoustic isolation.

New Construction, Envelope, and Physical Connection: Construction of a new structural frame with metal panels and pre-cast exterior walls, establishing a secure thermal wall envelope, executing the physical and utility connection to adjacent operational Building F/10854, and conducting all associated site work, paving, and access control infrastructure. V. ACQUISITION STRATEGY - PRE-AWARD The USACE will use a streamlined competitive selection process: Step 1 –RFQ: Interested parties will submit a Statement of Qualifications (SOQ).

Following evaluation of the qualification packages,

The description continues in the official notice.

Contracting contact

As published on the official notice. Ask questions in writing and before any questions deadline the notice sets.

Is your business small enough?

For NAICS 236220, a business counts as small if it has no more than $45.0 million in average annual receipts (SBA size standard). This notice is not set aside, but the size decides your small business status on it. SBA table, current as of Oct 15, 2026.

Companies that win this kind of work

Federal contractors paid for commercial and institutional building construction work, who also hold Army contracts (last 12 months): possible competitors, or partners to team with.

About the buyer

The Department of the Army awarded $123.6 billion in contracts in the last 12 months; its biggest suppliers were Lockheed Martin Corporation, The Boeing Company and Raytheon Company. See what Army is buying now.

Commercial and Institutional Building Construction contracts right now

There are 294 open government contract opportunities in this trade (NAICS 236220), 115 posted in the last 7 days; 65% are set aside for small businesses. The agencies buying the most are Department of Veterans Affairs, Department of the Army and Department of the Navy. Most of the work with a stated place is in California, North Carolina and Texas. A notice in this trade gives a median of 22 days from posting to deadline; this one gives 18 days.

All open commercial and institutional building construction contracts

Coming up in this trade

Planned contracts from the agencies' procurement forecasts, often months before a solicitation. Plans can change.

SAFB Card Reader Cabling Replacement
General Services Administration
Evaluation Stage · Award FY 2026 · Below $150K · Firm Fixed Price
HSI Wet Cell ESS
General Services Administration
Acquisition Planning · Award FY 2026 · Below $150K · 8(a) Sole Source · Firm Fixed Price
USDC Carpet Refresh Chambers
General Services Administration
Acquisition Planning · Award FY 2026 · Below $150K · 8(a) Sole Source · Firm Fixed Price

Recent awards in this trade

From the award notices agencies publish.

Similar open commercial and institutional building construction bids

Progressive Design-Build (PDB) - RENOVATE HQ AFMC B/10262 PH 2 at WPAFB
Department of the Army
Due Nov 30, 2026, 11:00 AM (UTC-5) · 17 days left
Sources Sought · Wright Patterson AFB, OH · Posted Nov 12, 2026
B422 Breakroom, B300 BDOC
Department of the Army
Due Dec 10, 2026, 1:00 PM (UTC-5) · 27 days left
Solicitation · Small business · Mansfield, OH · Posted Nov 12, 2026
Renovate 6S for Inpatient Mental Health - 552-20-101
Department of Veterans Affairs
Solicitation · Service-disabled veteran-owned · Dayton, OH · Posted Nov 9, 2026
JOFOC- GRC Construction (GMACC-2)
National Aeronautics and Space Administration
Special Notice · Cleveland, OH · Posted Nov 4, 2026
Project 538-18-101 Improve Water System - Legionella
Department of Veterans Affairs
Solicitation · Service-disabled veteran-owned · Chillicothe, OH · Posted Oct 29, 2026
RWP - Test Site 2 (TS2) Improvements & Modernization, Aerospace Vehicle Survivability Facility (AVSF)
Department of the Air Force
Due Nov 16, 2026, 2:00 PM (UTC-6) · 3 days left
Solicitation · Wright Patterson AFB, OH · Posted Oct 18, 2026