Home / Navy / Bare Printed Circuit Board Manufacturing / Notice

PWA DCI

Updated

Solicitation from the Department of the Navy. Due Dec 7, 2026, 4:30 PM (UTC-4), 27 days left.

Be among the first to see new Bare Printed Circuit Board Manufacturing contracts
Only new notices that match, once a day.
Solicitation numberN0010427QTA21
AgencyDepartment of the Navy
OfficeNAVSUP Weapon Systems Support Mech
Notice typeSolicitation
Set-asideNone
Trade (NAICS)Bare Printed Circuit Board Manufacturing (334412)
Product or service code5998
PostedNov 9, 2026
Response deadlineDec 7, 2026, 4:30 PM (UTC-4) (27 days left)
Add the deadline toGoogle Calendar · Apple / Outlook (.ics)
Official notice
Send to a teammate

Description

Accelerated delivery is encouraged and accepted before the delivery date(s) listed in the schedule. ^^ All freight is FOB Origin. This RFQ is for repair. The resultant award of this solicitation will be issueThe Government is seeking a Repair Turnaround Time (RTAT) of: 229 Days_ Government Source Inspection (GSI) is required.

Please note freight is handled by the Navy as per the Commercial Asset VisibiliYour quote should include the following information: QUOTE AMOUNT AND RTAT Unit Price:__________ Total Price:__________ Repair Turnaround Time (RTAT): _______ days If your company is not quoting the Government's Required Repair Turnaround Time__________ __________ __________ Repair Turnaround Time (RTAT): the resultant contractual delivery requirement i Check one: Firm-fixed-Price ___ Not-to Exceed (NTE): ___ Return Material Authorization # (RMA), if applicable:__________ Delivery Vehicle (if Delivery Order requested) (if your company has a current ^^^^^^^^^^^^^^^TESTING AND EVALUATION IF BEYOND REPAIR^^^^^^^^^^^^^^^ T&E fee/price (if asset is determined BR/BER): If an item is determined BR, and the contractor provides documentation that costs were incurred during evalua The T&E fee (if asset is determined BR/BER) was determined/computed based on: AWARDEE info & performance location Awardee CAGE: __________ Inspection & Acceptance CAGE, if not same as ""awardee CAGE"": __________ Facility/Subcontractor CAGE (where the asset should be shipped), if not same ^^^^^^^^^^^^^^^ IOT COMPARE REPAIR PRICE TO PRICE TO BUY NEW^^^^^^^^^^^^^^^ New unit price:__________ New unit delivery lead-time:__________ \

  1. SCOPE 1.1 This contract/purchase order contains the requirements for repair and the contract quality requirements for the PWA DCI .
  2. APPLICABLE DOCUMENTS 2.1 Applicable Documents - The document(s) listed below form a part of this contract/purchase order including modifications or exclusions. 2.1.1 "Document References" listed below must be obtained by the Contractor.

Ordering information is included as an attachment to this contract/purchase order.

3. REQUIREMENTS 3.1 Cage Code/Reference Number Items - The PWA DCI repaired under this contract/purchase order shall meet the operational and functional requirements as represented by the Cage Code(s) and reference number(s) listed below. All repair work shall be performed in accordance with the contractors repair/overhaul standard practices, manuals and directives including but not limited to drawings, technical orders, manufacturing operations, tooling instructions, approved repair standards and any other contractor or government approved documents developed to provide technical repair procedures.

CAGE___Ref. No. ;27192 MC-014477-01; 3.2 Marking - This item shall be physically identified in accordance with ;MIL-STD-129; . 3.3 Changes in Design, Material Servicing, or Part Number - Except for a Code 1 change, which shall be processed as provided in the code statement shown below, no substitution of items shall be made until the NAVICP-MECH Contracting Officer has notified and approval has been given by issuance of a written change order.

When any change in design, material, servicing or part number is made to replace or substitute any item to be furnished on this contract/purchase order, the Contractor shall furnish, for the substituting/replacement item, a drawing and an explanation of the reason for the change, explaining the reason therefor. If finished detail drawings are not available, shop drawings in the form used by the manufacturer will be acceptable for Government evaluation.

When notifying the Procurement Contracting Officer of the reasons for making substitutions, the type of change shall be indicated by code number in accordance with one of the following statements: Code 1: PART NUMBER CHANGE ONLY - If the Manufacturer's Part Number indicated thereon has changed, but the parts are identical in all respects, supply the item and advise NAVICP-MECH immediately of the new part number.

Code 2: Assembly (or set or kit) not furnished - Used following detail parts. Code 3: Part not furnished separately - Use assembly. Code 4: Part redesigned - Old and new parts are completely interchangeable.

Code 5: Part redesigned - New part replaces old. Old part cannot replace new. Code 6: Part redesigned - Parts not interchangeable.

3.4 Mercury Free - The material supplied under this contract/purchase order is intended for use on submarines/surface ships and therefore shall contain no metallic mercury and shall be free from mercury contamination. Mercury contamination of the material will be cause for rejection. If the inclusion of metallic mercury is required as a functional part of the material furnished under this contract, the Contractor shall obtain written approval fr

Clauses in this notice (11):

Documents referenced (1): MIL-STD-129

The description continues in the official notice.

Contracting contact

As published on the official notice. Ask questions in writing and before any questions deadline the notice sets.

Is your business small enough?

For NAICS 334412, a business counts as small if it has no more than 750 employees (SBA size standard). This notice is not set aside, but the size decides your small business status on it. SBA table, current as of Oct 15, 2026.

Companies that win this kind of work

Federal contractors paid for bare printed circuit board manufacturing work, who also hold Navy contracts (last 12 months): possible competitors, or partners to team with.

About the buyer

The Department of the Navy awarded $130.1 billion in contracts in the last 12 months; its biggest suppliers were Electric Boat Corporation, Lockheed Martin Corporation and RTX Corporation. See what Navy is buying now.

Bare Printed Circuit Board Manufacturing contracts right now

There are 144 open government contract opportunities in this trade (NAICS 334412), 51 posted in the last 7 days; 10% are set aside for small businesses. The agencies buying the most are Defense Logistics Agency and Department of the Navy. Most of the work with a stated place is in Pennsylvania and Washington. A notice in this trade gives a median of 31 days from posting to deadline; this one gives 28 days.

All open bare printed circuit board manufacturing contracts

Recent awards in this trade

From the award notices agencies publish.

Similar open bare printed circuit board manufacturing bids

Display, Optoelectronic
Defense Logistics Agency
Due Nov 20, 2026 · 10 days left
Solicitation · Posted Nov 9, 2026
Electronic C/B Card
Department of the Navy
Due Nov 23, 2026, 4:30 PM (UTC-4) · 13 days left
Solicitation · Posted Nov 9, 2026
Electronic Componen, in Repair/Modification of
Department of the Navy
Due Dec 22, 2026, 4:00 PM (UTC-4) · 42 days left
Solicitation · Posted Nov 9, 2026
Circuit Card Assemb, in Repair/Modification of
Department of the Navy
Due Dec 7, 2026, 4:30 PM (UTC-4) · 27 days left
Solicitation · Posted Nov 9, 2026
Circuit Card Assemb
Department of the Navy
Due Nov 13, 2026, 4:30 PM (UTC-4) · 3 days left
Solicitation · Posted Nov 9, 2026
Test Set, Electrical FI
Defense Logistics Agency
Due Nov 19, 2026 · 9 days left
Solicitation · Posted Nov 8, 2026