Sensor Device
Updated
Solicitation from the Department of the Navy. Due Dec 11, 2026, 2:00 PM (UTC-4), 36 days left.
| Title as posted | SENSOR DEVICE |
|---|---|
| Solicitation number | N0038326RMA90 |
| Agency | Department of the Navy |
| Office | NAVSUP Weapon Systems Support |
| Notice type | Solicitation |
| Set-aside | None |
| Trade (NAICS) | Other Aircraft Parts and Auxiliary Equipment Manufacturing (336413) |
| Product or service code | 1680 |
| Posted | Nov 4, 2026 |
| Response deadline | Dec 11, 2026, 2:00 PM (UTC-4) (36 days left) |
| Add the deadline to | Google Calendar · Apple / Outlook (.ics) |
Description
All contractual documents (i.e. contracts, purchase orders, task orders delivery orders and modifications) related to the instant procurement are considered to be "issued" by the government when copies are either deposited in the mail, transmitted by facsimile, or sent by other electronic commerce methods, such as email. The government's acceptance of the contractor's proposal constitutes bilateral agreement to "issue" contractual documents as detailed herein.
Early and incremental deliveries accepted and preferred. 1. SCOPE 1.1 Articles to be furnished hereunder shall be repaired, tested and inspected in accordance with the terms and conditions specified in the Requirements Section of this document.
1.1.1 Any item contracted for repair SHALL have a Statement of Work to ensure compliance with all repair procedures and requirements. Repair of: SENSOR DEVICE ;1680-01-671-2764; NSN , ;1011850-101; Part Number, Shall be performed IAW: Sensor device ;IAW latest revision; Publication (s). 1.1.2 There will be no repair deviation from the approved written procedures without review and acceptance by the Basic Design Engineer.
All requests for Waiver/Deviation shall be via Form 1694 routed throught the Local DCMA/ACO office for review and recommendations via form 1998. 2. Applicable documents - not applicable 3. REQUIREMENTS 3.1 1.0 GENERAL 3.1.1 This Statement of Work (SOW) establishes the criteria for repair and testing /inspection of the subject item.
It includes inspection, component repair and replacement,reassembly and testing procedures required to return units back into a servicable condition. 3.2 2.0 DEFINITIONS. 3.2.1 CONTRACTOR: Is defined as the successful offeror awarded a contract, orderor issued a project work order.
The term "contract" encompasses a contract, an order, or a project work order. 3.2.2 OVERHAUL: An overhauled part is one which has been disassembled, cleaned, inspected, repaired as necessary (by replacing or repairing all components which have been found to exceed limits established by the repair/overhaul manual) reassembled and tested in accordance with the approved repair/overhaul manual listed in this SOW and returned to a Ready for Issue (RFI) condition (Refer to contract schedule for items to be overhauled).
3.2.3 REPAIR: A repaired part is one which has been restored to a Ready for Issue(RFI) condition (by replacing or repairing those components found to be defective, broken, damaged or inoperative during the initial evaluation and troubleshooting phase) and tested in accordance with the approved repair/overhaul manual listed in this SOW (Refer to contract schedule for items to be repaired).
3.3 3.0 SCOPE 3.3.1 GENERAL. The items to be furnished hereunder shall be overhauled, upgraded,repaired, tested, inspected, and accepted in accordance with the terms and conditions specified in this contract. Unless expressly provided Government Furnished Property, including equipment such as fixtures, jigs, dies, patterns, mylars, special tooling, special test equipment, or any other manufacturing aid required for the repair, manufacture, and/or testing of the subject item(s) will not be provided by the Government and shall be the responsibility of the contractor.
The foregoing applies notwithstanding any reference to such equipment or the furnishing thereof that may be contained in any drawing, manual, or specification for the contract items. 3.3.2 REPAIR UPGRADE REQUIREMENTS:The contractor shall provide the necessary facility, labor, materials, parts, and test and tooling equipment required to to return the following items to a Ready For Issue (RFI) condition: SENSOR DEVICE ;SENSOR DEVICE; P/N, ;1011850-101; NSN, ;1680-01-671-2764; Tech Publications 3.3.3 RFI is defined as that condition allowing the items to perform properly and reliably in an operational environment in a manner they were intended to operate.The contractor must perform all repairs/upgrades at the facility identified within this SOW.
Repairs performed by the contractor or subcontractor shall be performed in accordance with the specified drawings and repair manual(s). 3.4 Changes to such manuals used for repairs under this contract, or changes to drawings or specifications used in the manufacture of parts utilized in these repairs, require Procuring
Contact: N761.37 · P1G · 2156972983 · [email protected]
Clauses in this notice (21):
- Item Unique Identification and Valuation (Jan 2023)
- Higher-Level Contract Quality Requirement
- Inspection and Acceptance of Supplies
- Stop-Work Order (Aug 1989)
- Wide Area Workflow Payment Instructions (Jan 2023)
- Navy Use of Abilityone Support Contractor - Release of Offeror Information (3-18))
- Mandatory Use of Workflow Pro (WFP) Mod Assist Module
- Integrity of Unit Prices (Nov 2021)
- Warranty of Supplies of a Noncomplex Nature (Jun 2003)
- Safeguarding Sensitive Conventional Arms, Ammunition, and Explosives (Nov 2023)
- Equal Opportuity for Workers with Disabilities (DEV 2026-O0040)(Feb 2026)
- Transportation of Supplies by Sea (Oct 2024)
- Buy American-Free Trade Agreements-Balance of Payments Program-Basic (Feb 2024)
- Security Prohibitions and Exclusions (Class Deviation 2026-O0025)(Feb 2026)
- Buy American-Free Trade Agreements-Balance of Payments Program Certificate-Basic (Feb 2024))
- Buy American--Balance of Payments Program Certificate-Basic (Feb 2024)
- Alternate A, Annual Representations and Certifications (Deviation 2026-O0043)(Feb 2026))
- Royalty Information (Apr 1984)
- Type of Contract (DEV 2026-O0045)(Mar 2026)
- Notice of Priority Rating for National Defense, Emergency Preparedness, Andenergy Program Use (Apr 2008))
- Only One Offer (Deviation 2026-O0048)(Mar 2026)
The description continues in the official notice.
Contracting contact
As published on the official notice. Ask questions in writing and before any questions deadline the notice sets.
Is your business small enough?
For NAICS 336413, a business counts as small if it has no more than 1,250 employees (SBA size standard, with exceptions in the notes). This notice is not set aside, but the size decides your small business status on it. SBA table, current as of Oct 15, 2026.
Notice history
- Oct 9, 2026: Solicitation Due Nov 19, 2026, 2:00 PM (UTC-4)
- Aug 21, 2026: Solicitation Due Oct 19, 2026, 2:00 PM (UTC-4)
- Jul 31, 2026: Solicitation Due Aug 31, 2026, 2:00 PM (UTC-4)
Companies that win this kind of work
Federal contractors paid for other aircraft parts and auxiliary equipment manufacturing work, who also hold Navy contracts (last 12 months): possible competitors, or partners to team with.
- Northrop Grumman Systems Corporation $1.6 billion in this trade
- RTX Corporation $1.1 billion in this trade
- L3HARRIS Technologies Integrated Systems L.P. $953.7 million in this trade
- Lockheed Martin Corporation $857.7 million in this trade
- Bell Boeing Joint Project Office $852.8 million in this trade
About the buyer
The Department of the Navy awarded $132.7 billion in contracts in the last 12 months; its biggest suppliers were Electric Boat Corporation, Lockheed Martin Corporation and RTX Corporation. See what Navy is buying now.
Other Aircraft Parts and Auxiliary Equipment Manufacturing contracts right now
There are 697 open government contract opportunities in this trade (NAICS 336413), 270 posted in the last 7 days; 36% are set aside for small businesses. The agencies buying the most are Defense Logistics Agency, Department of the Navy and US Coast Guard. Most of the work with a stated place is in Virginia, Oklahoma and Pennsylvania. A notice in this trade gives a median of 30 days from posting to deadline; this one gives 37 days.
All open other aircraft parts and auxiliary equipment manufacturing contracts
Coming up in this trade
Planned contracts from the agencies' procurement forecasts, often months before a solicitation. Plans can change.
Recent awards in this trade
- Everstone Industries LLC $126,892 · Defense Logistics Agency · Nov 4, 2026
- Alcazar General Contractor LLC $65,250 · Defense Logistics Agency · Nov 4, 2026
- Ontic Engineering & Manufacturing, Inc $923,772 · Defense Logistics Agency · Nov 4, 2026
- Boeing Distribution, Inc. $76,692 · Defense Logistics Agency · Nov 4, 2026
- Boeing Distribution, Inc. $97,414 · Defense Logistics Agency · Nov 4, 2026
From the award notices agencies publish.