Home / Army / Other Heavy and Civil Engineering Construction / Notice

St. Lucie South Jetty Repair Industry Day

Updated

Special Notice from the Department of the Army, for work in Stuart, Florida. Due Dec 7, 2026, 10:00 AM (UTC-5), 37 days left.

Be among the first to see new Other Heavy and Civil Engineering Construction contracts
Only new notices that match, once a day.
Solicitation numberW912EP27Z1CUE
AgencyDepartment of the Army
OfficeW074 Endist Jacksnvlle
Notice typeSpecial Notice
Set-asideNone
Trade (NAICS)Other Heavy and Civil Engineering Construction (237990)
Product or service codeZ1KA
Place of performanceStuart, Florida
PostedOct 30, 2026
Response deadlineDec 7, 2026, 10:00 AM (UTC-5) (37 days left)
Add the deadline toGoogle Calendar · Apple / Outlook (.ics)
Official notice
Send to a teammate

Bid documents (3)

Paid members download every document from this page, or buy this bid alone.

Federal prevailing wage rates for this place: Florida Davis-Bacon and SCA wage determinations.

Description

This announcement constitutes a Special Notice. This announcement seeks information from industry and will only be used for preliminary planning purposes. This is not a solicitation for proposals and no contract shall be awarded from this special notice.

Respondents will not be notified of the results of the evaluation. This is a SAVE-THE-DATE special notice for an industry day event on 07 December 2026 at 10:00 AM EST. All interested Offerors are required to access SAM.gov for future updates.

Please view registration information and details below. The presentation slides and list of attendees will be made available and posted to the subject special notice on SAM.gov after the conclusion of the event. The U.S. Army Corps of Engineers, Jacksonville District will be holding an Industry Day event to gauge the interest, capabilities, and qualifications of various members of the Construction Community, to include Small Businesses.

This event will provide information and obtain feedback from interested Offerors prior to issuance of the official solicitation. This requirement is for fiscal year (FY) 2027 award. NAICS Code 237990: Other Heavy and Civil Engineering Construction Small Business Standard: $45 million Price Target Range: $25 - $50 million Estimated Period of Performance: 730 calendar days Project Background Project Title: St. Lucie South Jetty Rehabilitation Interagency, Martin County, Florida.

Project Description: The work consists of rehabilitation of the head structure of the South Jetty at St. Lucie Inlet. This includes a rebuilt rounded head structure and head-to-trunk transition with a marine mattress foundation and toe protection stones. Rehabilitation will require substantial moving and manipulation of both new and existing stones to obtain the required interlocking.

The reworking of existing stones is only for incorporation of new stone. The retrieval of existing stone outside of the design template will not be required and is not part of the necessary rework of existing stone. The originally constructed South Jetty is approximately 1,320 feet in length with a crest height of 5.5 feet NAVD88.

The crest width is 10 feet and the north and south slopes of the structure slope at 1V:2H. There is an asphalt walkway approximately 1,090 feet in length that runs along the existing jetty crest, terminating eastward at approximately Station 12+00 as shown on the approved permit drawings. Manipulation of stone along the crest may be necessary while completing the required work along the side slopes.

The asphalt walkway will need to be removed within the repair area as necessary as work progresses. Any asphalt sections removed, or damaged such that they need to be removed, must be transported and properly disposed of off-site, and will not need to be replaced. Project Information Scope of Work: The proposed work includes rehabilitation of the head of the south jetty structure (the seaward-most 400 to 500 feet) by restabilizing the structure foundation and placing a second layer of large armor stone.

The proposed scope includes: Excavating the existing bed material to place a widened marine mattress foundation, expanding the current structure footprint up to 85 feet on the jetty centerline as shown on the approved permit drawings; Placing 9- to 15-ton toe protection stones to form the structure foundation and provide scour protection; Removing and disposing of the remaining asphalt walkway and other debris off-site; Repairing the existing core and reworking the single layer of armor stone, as needed; and, Placing a second layer of 9- to 15-ton armor stone to stabilize the structure.

Overview of Construction Staging and Access Requirements: Clearing of access routes and staging areas may be required. Any areas that are disturbed during construction are to be restored to pre-construction conditions or better once jetty rehabilitation work is completed. Expansion and/or improvements of access routes may be required.

Maximum limits of access routes and staging areas are shown on the approved permit drawings. Additional Environmental Considerations: Construction will be permitted all year round and confined to daylight hours only. Construction that occurs during turtle and shorebird nesting seasons or has the potential to impact other Endangered Species Act (ESA) Protected Species, is subject to environmental restrictions and monitoring requirements.

Refer to Table 1 below for a list of protected species. Access from the water is allowed, but material cannot be dredged outside of the construction limits. All material excavated must pass through a 2-inch screen prior to use as backfill around the jetty structure or on the beach.

All screened material must be disposed of off site. Excavated material may be used to build up the east staging area within the limits shown on the approved permit drawings. After jetty rehabilitation work is complete, the staging area must be graded to the beach fill template and native vegetation restored as shown on the approved permit drawings.

Requests for Information: Industry is asked to consider the following questions and provide input at the Industry Day: Company/Contractor name, address, point of contact, phone number and e-mail address. Does the Contractor plan to submit a proposal for this contract? Describe the proposed construction methods and equipment needed to rehabilitate the jetty.

Address, at a minimum, excavation of existing grade, maintaining open excavation areas, debris removal, and installation of marine mattresses and armor stone. Would temporary earth-retention or water-control measures, such as a cofferdam or similar system, be required to complete the work? Would dewatering be completed if this is the proposed construction methodology?

If a cofferdam or other earth-retention system that also excludes all swimming ESA-listed species is not proposed, describe the measures that would be used to prevent the swimming ESA-listed species from ente

The description continues in the official notice.

Contracting contact

As published on the official notice. Ask questions in writing and before any questions deadline the notice sets.

Is your business small enough?

For NAICS 237990, a business counts as small if it has no more than $45.0 million in average annual receipts (SBA size standard). This notice is not set aside, but the size decides your small business status on it. SBA table, current as of Oct 15, 2026.

Companies that win this kind of work

Federal contractors paid for other heavy and civil engineering construction work, who also hold Army contracts (last 12 months): possible competitors, or partners to team with.

About the buyer

The Department of the Army awarded $84.6 billion in contracts in the last 12 months; its biggest suppliers were Lockheed Martin Corporation, Raytheon Company and The Boeing Company. See what Army is buying now.

Other Heavy and Civil Engineering Construction contracts right now

There are 197 open government contract opportunities in this trade (NAICS 237990), 37 posted in the last 7 days; 49% are set aside for small businesses. The agencies buying the most are Department of the Army, Department of the Navy and Department of Veterans Affairs. Most of the work with a stated place is in Louisiana, Virginia and Texas. A notice in this trade gives a median of 28 days from posting to deadline; this one gives 38 days.

All open other heavy and civil engineering construction contracts

Coming up in this trade

Planned contracts from the agencies' procurement forecasts, often months before a solicitation. Plans can change.

Boise River Diversion Dam Bridge Replacement
Department of the Interior
Acquisition Planning · Award FY 2026 · $150K - $249K · Small Business Set Aside - Total · Firm Fixed Price
NEW - 3 year maintenance contract of Steamboat Shoreline stabilization planting and Logboom
Department of the Interior
Acquisition Planning · Award FY 2026 · $250K - $499K · Small Business Set Aside - Total · Firm Fixed Price
NEW - Henry Hagg Lake Shoreline Stabilization - Barge Drilling; crane to load drill on barge
Department of the Interior
Acquisition Planning · Award FY 2026 · Below $150K · Small Business Set Aside - Total · Firm Fixed Price

Recent awards in this trade

From the award notices agencies publish.

Similar open other heavy and civil engineering construction bids

Tampa Harbor Improvements Industry Day
Department of the Army
Due Nov 18, 2026, 9:00 AM (UTC-5) · 18 days left
Special Notice · Tampa, FL · Posted Oct 23, 2026
P110 Cape Canaveral Railhead and Transfer Facilities at Kennedy Space Center, Florida
Department of the Navy
Due Nov 4, 2026, 2:00 PM (UTC-5) · 4 days left
Sources Sought · Merritt Island, FL · Posted Oct 21, 2026
Repair Aids to Navigation (ATON) - Southern Area of USCG District Northeast
US Coast Guard
Due Dec 8, 2026, 2:00 PM (UTC-5) · 38 days left
Presolicitation · Small business · New Haven, CT · Posted Oct 30, 2026
W912EE27BA002 - Lease of One Cutterhead, Hydraulic Pipeline Dredge (Not Less Than 24-Inch Diameter) Fully Operated with Attendant Plant and Personnel, and with a Draft not to Exceed 9 Feet, for Construction and Maintenance Dredging - JBJ Waterway
Department of the Army
Due Nov 16, 2026, 12:00 PM (UTC-6) · 16 days left
Presolicitation · Vicksburg, MS · Posted Oct 30, 2026
W912EE27BA001 - Lease of One Cutterhead, Hydraulic Pipeline Dredge (Not Less Than 18-Inch Diameter) Fully Operated with Attendant Plant and Personnel, and with a Draft not to Exceed 9 Feet, for Construction and Maintenance Dredging - MS River Harbors
Department of the Army
Due Nov 16, 2026, 12:00 PM (UTC-5) · 16 days left
Presolicitation · Vicksburg, MS · Posted Oct 30, 2026
FWS - Pixley NWR Water Recirculation Design-Build
Departmental Offices
Due Nov 30, 2026, 9:00 AM (UTC-8) · 30 days left
Solicitation · Small business · Posted Oct 30, 2026