USACE Moorings Life Safety Improvement Project
Updated
Sources Sought from the Department of the Army. Due Dec 18, 2026, 3:00 PM (UTC-8), 30 days left.
| Solicitation number | W9127N27R2185 |
|---|---|
| Agency | Department of the Army |
| Office | W071 Endist Portland |
| Notice type | Sources Sought |
| Set-aside | None |
| Posted | Nov 17, 2026 |
| Response deadline | Dec 18, 2026, 3:00 PM (UTC-8) (30 days left) |
| Add the deadline to | Google Calendar · Apple / Outlook (.ics) |
Description
This is a SOURCES SOUGHT and is for informational/market research purposes only. This is not a request for proposal, quotation or bid, nor a synopsis of a proposed contract action under FAR subpart 5.2. This Sources Sought is to gain knowledge of the interest, capabilities, and qualifications of industry so the Government can make informed business decisions.
We are seeking responses from both large and small business members of industry to include: Small Business, Small Disadvantaged Businesses to include 8(a) firms, Historically Underutilized Business Zones (HUBZone), Woman Owned Small Business (WOSB) to include Economically Disadvantaged Women-Owned Small Business (EDWOSB), Service-Disabled Veteran-Owned Small business (SDVOSB) and Veteran Owned Small Business (VOSB).
All interested parties are highly encouraged to respond. The North American Industrial Classification Code (NAICS) for this requirement is: TBD. The approximate value of Project will be $5 to $25M. Formal Sources Sought Response Due – before 3:00 pm Pacific on December 18th 2026.
- Project Details and Background The project is to upgrade the administration buildings at the US Government Moorings located on the west bank of the Willamette River (River Miles 6.08 to 6.21). This facility serves as the primary port, repair and supply base for the USACE Portland District Fleet, including dredges and hydro survey vessels. After a major fire at the facility, the Government is pursuing life safety and seismic upgrades to the facility.
- Project Scope This project will involve upgrading the Fire Protection systems to the Administration building, Machine Shop, Warehouse, Weld Shop, and sprinkler system to the Administration building and Weld shop and adding site lighting.
This would also include life safety and code improvements within the same buildings. Anticipated Construction Schedule: CENWP intends to advertise in May 2027 and award in July 2027. Construction Contract with estimated construction completion by the end of calendar year 2028.
Estimated Construction Cost (ECC): The current ECC is between $5,000,000 to $25,000,000 Number and Type of Contracts: NWP contemplates awarding one (1), Firm Fixed-Price contract. The acquisition strategy decision has not yet been determined. Maximum small business participation is being sought at both the Prime and subcontracting levels.
Anticipated Source Selection Process: The expected method to determine the best value to the government is Invitation for Bid. Project Details: The following information represents the project objectives: Improve the life safety of the facilities at the US. Government Moorings.
3. Submission Instructions. Formal responses to this Sources Sought notice must be submitted electronically by e-mail to SUBJECT: US Moorings Life Safety Upgrade to Ian Lutjens at [email protected] and Brandon Lasich at [email protected] Interested parties’ responses to this Sources Sought shall be limited to six (6) pages and shall include the following information: Experience in installing fire control systems.
Experience in installing Sprinkler systems. Retro fitting new health life safety systems into an older building. Upgrading utilities in an older building 4.
Disclaimer and Important Notes. This notice does not obligate the Government to award a contract. No reimbursement will be made for any costs associated with providing information in response to this Sources Sought or any follow up information.
The Government reserves the right to use information provided by respondents for any purpose deemed necessary and legally appropriate. Any organization responding to this notice should ensure that its response is complete and sufficiently detailed to allow the Government to determine the organization's capabilities to perform the work. Respondents are advised that the Government is under no obligation to acknowledge receipt of the information received or to provide feedback to respondents with respect to any information submitted.
All interested firms must be registered in the System for Award Management (SAM) at sam.gov to have size status considered. You must remain current for the duration of the source selection process to be eligible for award of a Government contract.
Contracting contact
- Ian Lutjens · [email protected]
- Brandon Lasich · [email protected]
As published on the official notice. Ask questions in writing and before any questions deadline the notice sets.
About the buyer
The Department of the Army awarded $112.7 billion in contracts in the last 12 months; its biggest suppliers were Lockheed Martin Corporation, The Boeing Company and Raytheon Company. See what Army is buying now.