Home / Navy / Other Metal Valve and Pipe Fitting Manufacturing / Notice

Valve, Linear, Direct

Updated

Solicitation from the Department of the Navy. Due Nov 23, 2026, 4:30 PM (UTC-4), 6 days left.

Be among the first to see new Other Metal Valve and Pipe Fitting Manufacturing contracts
Only new notices that match, once a day.
Title as postedVALVE,LINEAR,DIRECT
Solicitation numberN0010426QFC29
AgencyDepartment of the Navy
OfficeNAVSUP Weapon Systems Support Mech
Notice typeSolicitation
Set-asideNone
Trade (NAICS)Other Metal Valve and Pipe Fitting Manufacturing (332919)
Product or service code4820
PostedNov 16, 2026
Response deadlineNov 23, 2026, 4:30 PM (UTC-4) (6 days left)
Add the deadline toGoogle Calendar · Apple / Outlook (.ics)
Official notice
Send to a teammate

Description

This amendment is hereby issued to change the quantity to 11. All other terms and conditions remain the same.

  1. DD1423 Data Item A001 (Inspection and Test Plan) may be waived if already on file at NAVSUP WSS Mechanicsburg.
  2. Portsmouth NSY's DODAAC has changed from N00102 to N50286. Any reference to N00102 within this order should be updated to N50286.
  3. The following proposed delivery schedule applies: Submission of Certification Data CDRLs will be on or before 20 days prior to scheduled delivery. PNSY review/acceptance of Certification CDRLs 6 working days after receipt of Certification DD 1423 CDRLs. Final delivery of material will be on or before 365 days after effective date of the resulting contract.
  4. Any contract awarded as a result of this solicitation will be "DO" rated order; "DO" rated order certified for national defense use under the Defense Priorities and Allocations System (DPAS).
  5. This order is issued pursuant to Emergency Acquisition Flexibilities (EAF). \ 1.

SCOPE 1.1 The material covered in this contract/purchase order will be used in a crucial shipboard system. The use of incorrect or defective material would create a high probability of failure resulting in serious personnel injury, loss of life, loss of vital shipboard systems, or loss of the ship itself. Therefore, the material has been designated as Special Emphasis SUBSAFE/Non-Level I material and special control procedures are invoked to ensure receipt of correct material.

2. APPLICABLE DOCUMENTS 2.1 Order of Precedence - In the event of a conflict between the text of this contract/purchase order and the references and/or drawings cited herein, the text of this contract/purchase order must take precedence. Nothing in this contract/purchase order, however, must supersede applicable laws and regulations unless a specific exemption has been obtained.

2.2 Applicable Documents - The document(s) listed below form a part of this contract/purchase order including modifications or exclusions. 2.2.1 Specification Revisions - The specification revisions listed under "Documents References" below are the preferred revision. Older and/or newer r evisions are acceptable when listed within Contract Support Library Reference Number CSD155 in ECDS (Electric Contractor Data Submission) at: ht tps://register.nslc.navy.mil/.

This is to allow Contractors to use certain acceptable older specification revisions to purge their existing stock of material certified to those older revisions or to use newer specification revisions when material is certified to newly released revisions,without requiring the submittal of waiver/deviation requests for each specification revision on every contract. Revisions of specifications reflecting editorial and/or re-approval (e.g. E2009, R2014, etc.) are considered inconsequential, but are acceptable when their revisions are listedwithin CSD155 or elsewhere within this contract.

2.2.2 Test/Inspection Certifications - To allow Contractors to use existing stock of material previously tested with NDT specification revisions that are technically acceptable while minimizing the submittal of waivers/deviations, the following test/inspection specification revisions are acceptable in lieu of their preferred current revisions (where applicable) listed under "Document References" below when they were the current revision as of the date of NDT certification.

MIL-STD-1949 Original, Revision A, A Chg Not 2 MIL-I-6868 Rev. E, Revision E Amendment 1, Revision E Amendment 2 ASTM-E1417 1999, 2011 SAE-AMS-STD-2154 2005, 2010 2.2.3 The documents and drawings listed below under DRAWING NO. are not provided with this Contract/Purchase order. Drawing no CAGE rev DISTR CD ;20312-001 78062 B D; 2.2.4 "Document References" listed below must be obtained by the Contractor.

Ordering information is included as an attachment to this contract/purchase order.

DOCUMENT REF DATA=ISO/IEC

Contact: N743.23 · WVU · N/A · [email protected]

Clauses in this notice (17):

Documents referenced (7): ANSI/ASQ Z1.4, MIL-STD-792, ASTM-E1417, ASTM-E1444, MIL-I-6868, ISO_9001, ISO10012

The description continues in the official notice.

Contracting contact

As published on the official notice. Ask questions in writing and before any questions deadline the notice sets.

Is your business small enough?

For NAICS 332919, a business counts as small if it has no more than 750 employees (SBA size standard). This notice is not set aside, but the size decides your small business status on it. SBA table, current as of Oct 15, 2026.

Notice history

Companies that win this kind of work

Federal contractors paid for other metal valve and pipe fitting manufacturing work, who also hold Navy contracts (last 12 months): possible competitors, or partners to team with.

About the buyer

The Department of the Navy awarded $129.8 billion in contracts in the last 12 months; its biggest suppliers were Electric Boat Corporation, Lockheed Martin Corporation and RTX Corporation. See what Navy is buying now.

Other Metal Valve and Pipe Fitting Manufacturing contracts right now

There are 175 open government contract opportunities in this trade (NAICS 332919), 51 posted in the last 7 days; 6% are set aside for small businesses. The agencies buying the most are Department of the Navy, Defense Logistics Agency and US Coast Guard. Most of the work with a stated place is in California, Maryland and Maine. A notice in this trade gives a median of 30 days from posting to deadline; this one gives 7 days.

All open other metal valve and pipe fitting manufacturing contracts

Coming up in this trade

Planned contracts from the agencies' procurement forecasts, often months before a solicitation. Plans can change.

Reheat control valves and circuit settersautoflow cartridges manual isolation valves
Agricultural Research Service
Acquisition Planning · Award FY 2027 · $500K - $999K · Unknown
SSB NCAO BPA Call Swagelok TN-U1 (CGB)
Bureau of Reclamation
Acquisition Planning · Award FY 2027 · Below $150K · To Be Determined
Grant Creek AOPs
Forest Service
Awarded · Award FY 2026 · $500K - $999K · Unknown

Recent awards in this trade

From the award notices agencies publish.

Similar open other metal valve and pipe fitting manufacturing bids

Switch, Pressure
Defense Logistics Agency
Due Nov 27, 2026 · 10 days left
Solicitation · Posted Nov 16, 2026
Valve Assembly, Mani
Defense Logistics Agency
Due Dec 10, 2026, 2:00 PM (UTC-5) · 23 days left
Solicitation · Posted Nov 16, 2026
Valve, Flow Control, in Repair/Modification of
Department of the Navy
Due Nov 19, 2026, 4:30 PM (UTC-4) · 2 days left
Solicitation · Posted Nov 16, 2026
Valve, Globe
Department of the Navy
Due Nov 24, 2026, 4:30 PM (UTC-4) · 7 days left
Solicitation · Posted Nov 16, 2026
Poppet, Valve and Similar Replacement Parts
Department of the Navy
Due Dec 14, 2026, 4:30 PM (UTC-4) · 27 days left
Solicitation · Posted Nov 16, 2026
Ball & Seat Set
Department of the Navy
Due Dec 18, 2026, 4:30 PM (UTC-4) · 31 days left
Solicitation · Posted Nov 16, 2026