Home / VA / Commercial and Institutional Building Construction / Notice

657-27-103JB, FCA Replace Building 51 Roof, JB

Updated

Sources Sought from the Department of Veterans Affairs, for work in St. Louis. Due Nov 9, 2026, 10:00 AM (UTC-6), 10 days left.

Be among the first to see new Commercial Construction contracts
Only new notices that match, once a day.
Title as postedZ2DA--657-27-103JB, FCA Replace Building 51 Roof, JB
Solicitation number36C25527Q0044
AgencyDepartment of Veterans Affairs
Office255-Network Contract Office 15 (36C255)
Notice typeSources Sought
Set-asideService-disabled veteran-owned
Trade (NAICS)Commercial and Institutional Building Construction (236220)
Product or service codeZ2DA
Place of performanceSt. Louis
PostedOct 29, 2026
Response deadlineNov 9, 2026, 10:00 AM (UTC-6) (10 days left)
Add the deadline toGoogle Calendar · Apple / Outlook (.ics)
Official notice
Send to a teammate

Bid documents (1)

Paid members download every document from this page, or buy this bid alone.

Description

657-27-103JB, FCA Replace Building 51 Roof This is a Sources Sought Notice to determine the availability of service disabled veteran owned small business (SDVOSB) firms for a possible small business category type set-aside for Construction Services project: This is a Sources Sought Notice that is issued for information and planning purposes only and is not to be construed as a commitment by the government, implied or otherwise to issue a solicitation or ultimately award a contract.

An award will not be made on information received in response to this notice. This notice is not a Request for Proposal (RFP); it is a market research tool being utilized to determine the availability of sources prior to issuing a Best Value type RFP. Project description and scope

  1. This contract is for CONSTRUCTION services for the work required to replace the existing roof and associated components on Building 51 at the St. Louis Medical Center Jefferson Barracks.
  2. Description: Construction services: Furnish complete construction services to replace all designated Building 51 roofs, including projections, entrance roofs, and connecting portions.

The preliminary net roof area is approximately 56,000 square feet, subject to field verification. Provide a watertight thermoplastic polyolefin (TPO) roofing system in accordance with the VA-prepared drawings and specifications. Contractor shall submit shop drawings, product data, and installation details for all proposed materials, equipment, and systems to be installed or replaced under this contract for VA review prior to commencing the associated work.

Submittals shall include applicable manufacturer's specifications and required engineering certifications. Schedule, phasing, and occupied operations: Complete construction and closeout within 222 calendar days after the Notice to Proceed issue date. Building 51 remains occupied and operational 24 hours per day, seven days per week.

Work hours are from 7:00 a.m. to 4:30 p.m., local time. Submit a contractor-developed phasing plan for the Contracting Officer's Representative (COR) to review before roofing. Complete both highest penthouse roof platforms first on the original building and the highest roof section first on the addition; either building portion may be started first.

Maintain safe access, utilities, and required infection-control and HVAC-intake protection. Provide construction fall protection and keep the building watertight; coordinate service interruptions with the VA. Investigation and Roofing Requirements: a. Hazardous Materials: While neither Asbestos Containing Material nor Lead is expected to be encountered within the scope of this project, it will be the responsibility of the contractor to hire an independent 3rd party VPIH to complete the related work if they are to encounter a material that they deem suspicious. b. Demolition limit: At the original building (Zones 1-7, 13, and 14), remove the existing roofing assembly through the base sheet to the top of the Zonolite lightweight-concrete topping; retain the topping and underlying structural concrete deck.

At the addition (Zones 8-12 and 15), remove the existing roofing assembly, including insulation and intervening layers, to the top of the metal roof deck; retain the deck and supporting structure. Clean and inspect retained surfaces, and repair deterioration within specified repair limits. Report differing construction or deterioration beyond those limits to the COR before proceeding with affected work. c. New roof and mechanical securement: Install mechanically fastened rigid insulation, adhered cover board, and fully adhered 70-mil TPO roofing membrane with continuous hot-airwelded seams.

Contractor shall verify that the proposed fastening system is compatible with Building 51's existing roof construction. d. Parapets, penetrations, and retained metal: Extend new roofing up parapets to the existing flashing. Flash and seal, with the correct system specific boots, all roof penetrations with compatible membrane extending at least 8 inches above the finished roof, or higher where required by applicable VA criteria and manufacturer/warranty requirements.

Retain metal flashings, flanges, and coping unless scheduled for replacement, and replace roofing beneath retained metal. Specific Replacement and Repairs: e. Associated roof work: Retain rooftop HVAC units in place and replace roofing beneath elevated units and frames and around curbs. Replace old or deteriorated wooden rooftop support blocks with load-rated black rubber blocks compatible with the roofing; retain serviceable recently replaced blocks.

Replace roof-drain covers/strainers and recondition retained drains with watertight connections. Reflash existing scuppers and provide new scuppers only where detailed; retain gutters and downspouts unless otherwise indicated. Correct approximately 250 square feet of depressed roof on the original building's middle section north of the penthouse to provide positive drainage.

Replace expansion-joint weatherproofing/cover material at two original-building sections, approximately 40 linear feet each. Temporarily remove and reinstall the existing lightning-protection system in its original locations and configuration with new clips securing it; complete specified testing and certification. Repair approximately 150 linear feet of the existing movable stanchion-andrope warning-line barrier.

Replace the penthouse roof-access ladder to meet applicable VA safety requirements and OSHA criteria. Install 3-foot by 3-foot walking pads with 8-inch clear gaps along approximately 600 linear feet of total walkway route, including gaps. Provide positive drainage to roof drains and scuppers throughout all reroofed areas.

Standing water shall not remain more than 48 hours after rainfall ends under conditions conducive to drying. Correct low spots and other drainage deficiencies that prevent compliance before final acceptance. f. Skylights: Replace four skylights:

The description continues in the official notice.

Contracting contact

As published on the official notice. Ask questions in writing and before any questions deadline the notice sets.

Is your business small enough?

For NAICS 236220, a business counts as small if it has no more than $45.0 million in average annual receipts (SBA size standard). This notice is set aside, so only businesses under that size, or in the named program, can bid. SBA table, current as of Oct 15, 2026.

Companies that win this kind of work

Federal contractors paid for commercial and institutional building construction work, who also hold VA contracts (last 12 months): possible competitors, or partners to team with.

About the buyer

The Department of Veterans Affairs awarded $84.6 billion in contracts in the last 12 months; its biggest suppliers were Optum Public Sector Solutions, Inc., Mckesson Corporation and Triwest Healthcare Alliance Corp. See what VA is buying now.

Who can bid: Service-Disabled Veteran-Owned (SDVOSB) set-aside

SDVOSB set-asides are for small businesses owned and controlled by service-disabled veterans, certified by the SBA.

How to get certified: SDVOSB certification guide. All open Service-Disabled Veteran-Owned (SDVOSB) set-asides.

Commercial and Institutional Building Construction contracts right now

There are 309 open government contract opportunities in this trade (NAICS 236220), 124 posted in the last 7 days; 61% are set aside for small businesses. The agencies buying the most are Department of Veterans Affairs, Department of the Army and Department of the Navy. Most of the work with a stated place is in New York, California and Texas. A notice in this trade gives a median of 20 days from posting to deadline; this one gives 11 days.

All open commercial and institutional building construction contracts

Coming up in this trade

Planned contracts from the agencies' procurement forecasts, often months before a solicitation. Plans can change.

SAFB Card Reader Cabling Replacement
General Services Administration
Evaluation Stage · Award FY 2026 · Below $150K · Firm Fixed Price
HSI Wet Cell ESS
General Services Administration
Acquisition Planning · Award FY 2026 · Below $150K · 8(a) Sole Source · Firm Fixed Price
USDC Carpet Refresh Chambers
General Services Administration
Acquisition Planning · Award FY 2026 · Below $150K · 8(a) Sole Source · Firm Fixed Price

Recent awards in this trade

From the award notices agencies publish.

Similar open commercial and institutional building construction bids

Ca-Humboldt Bay Nwr-Tide Gate Repair
Departmental Offices
Due Nov 13, 2026, 5:00 PM (UTC-8) · 14 days left
Sources Sought · Small business · Posted Oct 29, 2026
FMF EC B-HAC Insular Air-Naval Station Hanger Renovation & Facilities Expansion U.S. Army Corps of Engineers (USACE) – Latin America and Caribbean District (SAA)
Department of the Army
Due Nov 12, 2026, 4:00 PM (UTC-4) · 13 days left
Sources Sought · San Cristobal Island, Ecuador · Posted Oct 29, 2026
Department of Veteran Affairs - Personnel Security Adjudication Center
Department of the Army
Due Nov 19, 2026, 11:00 AM (UTC-6) · 20 days left
Solicitation · Small business · Posted Oct 29, 2026
Dino Replace Swing Arm Gates
National Park Service
Due Nov 18, 2026, 1:00 PM (UTC-7) · 19 days left
Solicitation · Posted Oct 29, 2026
Black Warrior, Tombigbee, Alabama, Coosa Rivers Project Management Office
Department of the Army
Due Nov 5, 2026, 2:00 PM (UTC-6) · 6 days left
Solicitation · Posted Oct 29, 2026
PN 110205 - SOS Hangar Renovation - Progressive-Design-Build OT
Department of the Army
Due Nov 11, 2026, 2:00 PM (UTC-5) · 12 days left
Special Notice · Posted Oct 29, 2026