666-27-102 Lightning Protection Update B71N
Updated
Presolicitation from the Department of Veterans Affairs. Due Oct 30, 2026, 10:00 AM (UTC-6), 3 days left.
| Title as posted | Z2DA--666-27-102 Lightning Protection Update B71N |
|---|---|
| Solicitation number | 36C25926Q0880 |
| Agency | Department of Veterans Affairs |
| Office | Network Contract Office 19 (36C259) |
| Notice type | Presolicitation |
| Set-aside | None |
| Trade (NAICS) | Commercial and Institutional Building Construction (236220) |
| Product or service code | Z2DA |
| Posted | Oct 26, 2026 |
| Response deadline | Oct 30, 2026, 10:00 AM (UTC-6) (3 days left) |
| Add the deadline to | Google Calendar · Apple / Outlook (.ics) |
Bid documents (9)
- 1989-04-06 - 71 - Bldg 71 Outpatient-Clinical Addition 898 KB
- Bid document 138 KB
- Construction Safety Handout 70 KB
- LOS Certification 852.219- DEVIATION 19 KB
- Lightning Protection Update Building 71N Specifications 244 KB
- Past Performance Questionnaire Blank 62 KB
- Prime and Subcontractor Construction Breakdown 147 KB
- Self-Performed and Subcontracted Worksheet 20 KB
- Specifications Guarantee Period 119 KB
Paid members download every document from this page, or buy this bid alone.
Description
GENERAL: Introduction: An inspection for current code compliance of the lightning Protection System on Building 71N has been conducted and found the system needs upgrades and repairs to meet current NFPA 780 and UL96A standards. The Sheridan VA Medical Center needs the services of a qualified contractor to perform the needed lightning protection upgrades to the main hospital building 71N. Located on the Sheridan Wyoming Veterans Affairs Medical Center (VAMC) campus, at 1898 Fort Road, Sheridan, Wyoming 82801.
Statement of Work: Specifics a. Existing Conditions The existing lightning protection system (LPS) for Building 71N was installed in 1989 during the building s original construction. Overall, the system remains in fair condition, though it requires repair because several air terminals have become detached from their adhesive bonds to the roof surface. Air terminals are present at all high points of the structure, and all roof-mounted equipment and appurtenances are properly grounded.
A main grounding bus connects the communication systems and possibly the electrical distribution system to the primary service ground. The specific location where the grounding system bonds together the structural steel, electrical system, lightning protection components, and plumbing to create an equipotential ground could not be identified during the assessment. A continuous grounding loop encircles Buildings 9, 71, and 71N, with all roof air terminals and down conductors tied into this loop.
Down conductors descend to the loop at the corners of each of these buildings. Each air terminal has at least two separate grounding paths, satisfying current code requirements. No Transient Voltage Surge Suppression (TVSS) devices were observed in the system.
The lower 8 feet of the ground down conductors are encased in PVC electrical conduit for protection. New Construction Recent construction has added large equipment and a screen wall to the roof, which now obstructs and interferes with the original positioning of the existing air terminals. This new equipment sits higher than the existing lightning protection system components, rendering the current air terminals ineffective at intercepting and safely directing lightning strikes to ground.
Project Requirements To bring the existing lightning protection system (LPS) into compliance the following corrections are needed: Install Transient Voltage Surge Suppression (TVSS) devices at the building s main service panel. Establish proper bonding by interconnecting all electrical systems, communication systems, piping, and structural steel at the service entrance to create an equipotential ground.
Repair all roof air terminals that have detached or pulled away from their adhesive mounts on the roof surface. Install new air terminals at both ends of each screen wall, with additional terminals spaced at 20-foot intervals along the top of each wall, and at the highest point of the HVAC ductwork. Install an air terminal at each corner of the new HVAC equipment.
Connect all newly installed air terminals to the existing LPS using #2 bare copper conductors. After these corrections have been completed, a qualified inspection is required to verify full compliance with NFPA 780 and UL 96A standards. Upon successful inspection, a Master Label Certificate should be issued for the lightning protection system.
General: Construction project is to be completed within 120 calendar days from date of Notice to Proceed (NTP). Contractor shall provide all equipment, materials, supplies, tools, software, supervision, and labor required for this project, which may include, but is not limited to, demolition work, providing negative pressure environment for work, and providing all new equipment, utilities, and room finishes as indicated in the plans and this SOW per VA construction standards.
Safety submittals shall be completed and approved prior to the commencement of on-site construction work. Material selection submittals shall be completed and approved prior to ordering of materials for the project. The building tenants not in the construction areas will remain at work in the buildings during this construction.
Patients will remain on the floor in areas not under construction, so the contractor shall make patient safety, and infection control measures a priority. The contractor shall coordinate work locations and schedules with VA COR to minimize impact to building tenants. All electrical, carpentry, architectural, mechanical work, product design, project management, and other work needed on this project shall be provided by the Contractor.
All required electrical work, low, medium, or high voltage, shall be installed and terminated by the Contractor. No wiring or cabling shall be abandoned in place. All piping, cabling, and wiring shall be labeled.
All cabling and patch cabling shall match the VAMC s station-standard colors. The installation must, at a minimum, be in accordance with all applicable codes indicated in the Department of Veterans Affairs Design Manuals and VA .PUBLICATIONS (Master Construction Specifications, Construction Standards, National Fire Protection Association (NFPA), Underwriters Laboratory (UL), International Building Code IBC 2003, and National Electric Code (NEC) building codes and standards and the VA Information Security Handbook 6500.6, 6550.0 etc.).
The Contractor shall read and be familiar with the most current editions of the applicable codes, standards, guides, and manuals. Sources can be accessed at the Office of Construction and Facilities Management s Technical Information Library (TIL) (cfm.va.gov/TIL).
Any penetrations through any floors, ceilings, or walls shall be fire caulked, or otherwise fire sealed, and shall be done in this contract to meet VA standards and NFPA standards. Contractor shall utilize the VAMC s station-standard fire stop products or approved equal product(s). The station-standard products are SpecSeal fire caulk prod
The description continues in the official notice.
Contracting contact
- Elia-Laritza L Ruiz-Manzo (CS) · Contract Specialist · [email protected]
As published on the official notice. Ask questions in writing and before any questions deadline the notice sets.
Is your business small enough?
For NAICS 236220, a business counts as small if it has no more than $45.0 million in average annual receipts (SBA size standard). This notice is not set aside, but the size decides your small business status on it. SBA table, current as of Oct 15, 2026.
Notice history
- Oct 26, 2026: Presolicitation Due Oct 30, 2026, 10:00 AM (UTC-6)
- Oct 9, 2026: Presolicitation Due Oct 23, 2026, 10:00 AM (UTC-6)
Companies that win this kind of work
Federal contractors paid for commercial and institutional building construction work, who also hold VA contracts (last 12 months): possible competitors, or partners to team with.
- Sawtooth Construction JV II LLC $234.4 million in this trade
- Hsgs-Ameresco, LLC $201.6 million in this trade
- Korte Construction Company $133.6 million in this trade
- Cdeem Co $107.1 million in this trade
- Suffolk Construction Company, Inc. $88.4 million in this trade
About the buyer
The Department of Veterans Affairs awarded $84.6 billion in contracts in the last 12 months; its biggest suppliers were Optum Public Sector Solutions, Inc., Mckesson Corporation and Triwest Healthcare Alliance Corp. See what VA is buying now.
Commercial and Institutional Building Construction contracts right now
There are 296 open government contract opportunities in this trade (NAICS 236220), 126 posted in the last 7 days; 58% are set aside for small businesses. The agencies buying the most are Department of Veterans Affairs, Department of the Army and Department of the Navy. Most of the work with a stated place is in New York, California and Texas. A notice in this trade gives a median of 21 days from posting to deadline; this one gives 4 days.
All open commercial and institutional building construction contracts
Coming up in this trade
Planned contracts from the agencies' procurement forecasts, often months before a solicitation. Plans can change.
Recent awards in this trade
- LI Craftsmanship Inc $595,000 · Department of Veterans Affairs · Oct 22, 2026
- Enfield Enterprises LLC $158,926 · Department of the Navy · Oct 22, 2026
- Aaecon General Contracting LLC $3.8 million · Department of Veterans Affairs · Oct 22, 2026
- Hess Contracting LLC $35,035 · Departmental Offices · Oct 20, 2026
- Valiant Construction LLC $22.3 million · Department of Veterans Affairs · Oct 20, 2026
From the award notices agencies publish.