Home / VA / Commercial and Institutional Building Construction / Notice

666-27-102 Lightning Protection Update B71N

Updated

Solicitation from the Department of Veterans Affairs, for work in Sheridan, Wyoming. Due Nov 27, 2026, 10:00 AM (UTC-7), 31 days left.

Be among the first to see new Commercial Construction contracts
Only new notices that match, once a day.
Title as postedZ2DA--666-27-102 Lightning Protection Update B71N
Solicitation number36C25926Q0880_1
AgencyDepartment of Veterans Affairs
OfficeNetwork Contract Office 19 (36C259)
Notice typeSolicitation
Set-asideService-disabled veteran-owned
Trade (NAICS)Commercial and Institutional Building Construction (236220)
Product or service codeZ2DA
Place of performanceSheridan, Wyoming
PostedOct 26, 2026
Response deadlineNov 27, 2026, 10:00 AM (UTC-7) (31 days left)
Add the deadline toGoogle Calendar · Apple / Outlook (.ics)
Official notice
Send to a teammate

Bid documents (9)

Paid members download every document from this page, or buy this bid alone.

Federal prevailing wage rates for this place: Wyoming Davis-Bacon and SCA wage determinations.

Description

GENERAL: Introduction: An inspection for current code compliance of the lightning Protection System on Building 71N has been conducted and found the system needs upgrades and repairs to meet current NFPA 780 and UL96A standards. The Sheridan VA Medical Center needs the services of a qualified contractor to perform the needed lightning protection upgrades to the main hospital building 71N. Located on the Sheridan Wyoming Veterans Affairs Medical Center (VAMC) campus, at 1898 Fort Road, Sheridan, Wyoming 82801.

Statement of Work: Specifics a. Existing Conditions The existing lightning protection system (LPS) for Building 71N was installed in 1989 during the building s original construction. Overall, the system remains in fair condition, though it requires repair because several air terminals have become detached from their adhesive bonds to the roof surface. Air terminals are present at all high points of the structure, and all roof-mounted equipment and appurtenances are properly grounded.

A main grounding bus connects the communication systems and possibly the electrical distribution system to the primary service ground. The specific location where the grounding system bonds together the structural steel, electrical system, lightning protection components, and plumbing to create an equipotential ground could not be identified during the assessment. A continuous grounding loop encircles Buildings 9, 71, and 71N, with all roof air terminals and down conductors tied into this loop.

Down conductors descend to the loop at the corners of each of these buildings. Each air terminal has at least two separate grounding paths, satisfying current code requirements. No Transient Voltage Surge Suppression (TVSS) devices were observed in the system.

The lower 8 feet of the ground down conductors are encased in PVC electrical conduit for protection. New Construction Recent construction has added large equipment and a screen wall to the roof, which now obstructs and interferes with the original positioning of the existing air terminals. This new equipment sits higher than the existing lightning protection system components, rendering the current air terminals ineffective at intercepting and safely directing lightning strikes to ground.

Project Requirements To bring the existing lightning protection system (LPS) into compliance the following corrections are needed: Install Transient Voltage Surge Suppression (TVSS) devices at the building s main service panel. Establish proper bonding by interconnecting all electrical systems, communication systems, piping, and structural steel at the service entrance to create an equipotential ground.

Repair all roof air terminals that have detached or pulled away from their adhesive mounts on the roof surface. Install new air terminals at both ends of each screen wall, with additional terminals spaced at 20-foot intervals along the top of each wall, and at the highest point of the HVAC ductwork. Install an air terminal at each corner of the new HVAC equipment.

Connect all newly installed air terminals to the existing LPS using #2 bare copper conductors. After these corrections have been completed, a qualified inspection is required to verify full compliance with NFPA 780 and UL 96A standards. Upon successful inspection, a Master Label Certificate should be issued for the lightning protection system.

General: Construction project is to be completed within 120 calendar days from date of Notice to Proceed (NTP). Contractor shall provide all equipment, materials, supplies, tools, software, supervision, and labor required for this project, which may include, but is not limited to, demolition work, providing negative pressure environment for work, and providing all new equipment, utilities, and room finishes as indicated in the plans and this SOW per VA construction standards.

Safety submittals shall be completed and approved prior to the commencement of on-site construction work. Material selection submittals shall be completed and approved prior to ordering of materials for the project. The building tenants not in the construction areas will remain at work in the buildings during this construction.

Patients will remain on the floor in areas not under construction, so the contractor shall make patient safety, and infection control measures a priority. The contractor shall coordinate work locations and schedules with VA COR to minimize impact to building tenants. All electrical, carpentry, architectural, mechanical work, product design, project management, and other work needed on this project shall be provided by the Contractor.

All required electrical work, low, medium, or high voltage, shall be installed and terminated by the Contractor. No wiring or cabling shall be abandoned in place. All piping, cabling, and wiring shall be labeled.

All cabling and patch cabling shall match the VAMC s station-standard colors. The installation must, at a minimum, be in accordance with all applicable codes indicated in the Department of Veterans Affairs Design Manuals and VA .PUBLICATIONS (Master Construction Specifications, Construction Standards, National Fire Protection Association (NFPA), Underwriters Laboratory (UL), International Building Code IBC 2003, and National Electric Code (NEC) building codes and standards and the VA Information Security Handbook 6500.6, 6550.0 etc.).

The Contractor shall read and be familiar with the most current editions of the applicable codes, standards, guides, and manuals. Sources can be accessed at the Office of Construction and Facilities Management s Technical Information Library (TIL) (cfm.va.gov/TIL).

Any penetrations through any floors, ceilings, or walls shall be fire caulked, or otherwise fire sealed, and shall be done in this contract to meet VA standards and NFPA standards. Contractor shall utilize the VAMC s station-standard fire stop products or approved equal product(s). The station-standard products are SpecSeal fire caulk prod

The description continues in the official notice.

Contracting contact

As published on the official notice. Ask questions in writing and before any questions deadline the notice sets.

Is your business small enough?

For NAICS 236220, a business counts as small if it has no more than $45.0 million in average annual receipts (SBA size standard). This notice is set aside, so only businesses under that size, or in the named program, can bid. SBA table, current as of Oct 15, 2026.

Companies that win this kind of work

Federal contractors paid for commercial and institutional building construction work, who also hold VA contracts (last 12 months): possible competitors, or partners to team with.

About the buyer

The Department of Veterans Affairs awarded $84.6 billion in contracts in the last 12 months; its biggest suppliers were Optum Public Sector Solutions, Inc., Mckesson Corporation and Triwest Healthcare Alliance Corp. See what VA is buying now.

Who can bid: Service-Disabled Veteran-Owned (SDVOSB) set-aside

SDVOSB set-asides are for small businesses owned and controlled by service-disabled veterans, certified by the SBA.

How to get certified: SDVOSB certification guide. All open Service-Disabled Veteran-Owned (SDVOSB) set-asides.

Commercial and Institutional Building Construction contracts right now

There are 296 open government contract opportunities in this trade (NAICS 236220), 126 posted in the last 7 days; 58% are set aside for small businesses. The agencies buying the most are Department of Veterans Affairs, Department of the Army and Department of the Navy. Most of the work with a stated place is in New York, California and Texas. A notice in this trade gives a median of 21 days from posting to deadline; this one gives 32 days.

All open commercial and institutional building construction contracts

Coming up in this trade

Planned contracts from the agencies' procurement forecasts, often months before a solicitation. Plans can change.

SAFB Card Reader Cabling Replacement
General Services Administration
Evaluation Stage · Award FY 2026 · Below $150K · Firm Fixed Price
HSI Wet Cell ESS
General Services Administration
Acquisition Planning · Award FY 2026 · Below $150K · 8(a) Sole Source · Firm Fixed Price
USDC Carpet Refresh Chambers
General Services Administration
Acquisition Planning · Award FY 2026 · Below $150K · 8(a) Sole Source · Firm Fixed Price

Recent awards in this trade

From the award notices agencies publish.

Similar open commercial and institutional building construction bids

442-306 | Construct Physical Therapy Addition | Cheyenne, WY
Department of Veterans Affairs
Due Oct 29, 2026, 4:00 PM (UTC-4) · 2 days left
Presolicitation · Service-disabled veteran-owned · Cheyenne, WY · Posted Oct 22, 2026
SPECIAL NOTICE: Akeroyd Blood Donor Center - Joint Base San Antonio - VIRTUAL INDUSTRY DAY
Department of the Army
Due Oct 27, 2026, 12:45 PM (UTC-5) · due today
Special Notice · Posted Oct 26, 2026
ICD-705 Controlled Spaces Modernization and Sustainment Program - (Progressive Design-build (PDB) Other Transaction Agreement (OTA)
Department of the Army
Due Nov 17, 2026, 2:00 PM (UTC+9) · 21 days left
Sources Sought · Osan Air Base, South Korea · Posted Oct 26, 2026
(EAR048) Repair Fire Alarm System Eareckson Air Station Facilities
Department of the Army
Due Nov 16, 2026, 2:00 PM (UTC-9) · 20 days left
Special Notice · EARECKSON AS, AK · Posted Oct 26, 2026
Kaneohe WCR Construction
Department of the Army
Due Nov 11, 2026, 2:00 PM (UTC-5) · 15 days left
Sources Sought · Posted Oct 26, 2026
CON NRM 531-25-102 | Expand Emergency Room
Department of Veterans Affairs
Due Nov 6, 2026, 10:00 AM (UTC-7) · 10 days left
Solicitation · Service-disabled veteran-owned · Boise, ID · Posted Oct 26, 2026