0 MEWP BOOM LIFT ANNUAL INSPECTION
Updated
A PDF document (284 KB) attached to Annual Inspection Maintenance of Manlifts, from the US Coast Guard. Due Nov 16, 2026, 8:00 AM (UTC-5).
File name: TE-1_S00011.0_MEWP BOOM LIFT_ANNUAL INSPECTION_20260205.pdf
The full file is for paid members, or buy this bid alone.
Preview
MEWP BOOM LIFT
S00011.0
U.S. COAST GUARD
REV’D: 02/05/2026
ASSET NUMBER
OPERATING ACTIVITY
MAINTENANCE ACCOMPLISHED
DATE
ASSET HOURS
MO
DAY
YEAR
MO
ZULU DATE
DAY
MO
MAINTENANCE DUE
DATE
ASSET HOURS
DAY
YEAR
ZULU TIME
YEAR
SERAL NUMBER TRACKED ITEM – ALL INFORMATION REQUIRED
ITEM NO.
[ 1 ] DUE
CMS CODE
ACTION
DESCRIPTION
CEINUM
N/A
INSPECT
ANNUAL INSPECTION
N/A
SCHEDULED
UNSCHEDULED
ENGINE SERIAL NUMBER
ELAPS/TIME CLOCK/ ECM HOUR READING
DISCREPANCIES FOUND:
HOURS___.___
OTHER___.___
IF DISCREPANCIES ARE FOUND REMARKS ARE REQUIRED
REMARKS:
TECHNICIAN’S
SIGNATURE
TECHNICIAN’S
ID
*ASTERISK INDICATES QA REQUIRED
QA
REFERENCES:
OEM SERVICE MANUAL
REVIEWED
BY
LOG YN
DATA ENTRY
COMPLETED
MEWP BOOM LIFT
U.S. COAST GUARD
S00011.0
REV’D: 02/05/2026
MEWP BOOM LIFT ANNUAL INSPECTION
REFERENCES:
NONE
TOOLS/TEST EQUIPMENT:
Compressor, Air, P/N: N/A, CAGE: N/A, NIIN: N/A (with range suitable for asset) Gauge, Tire, P/N: N/A, CAGE: N/A, NIIN: N/A (with range suitable for asset) Tester, Antifreeze, P/N: GG-T-250, CAGE: N/A, NIIN: 6630-00-247-2968 (or equivalent) Wrench, Torque, P/N: N/A, CAGE: N/A, NIIN: N/A (with range suitable for asset)
EXPENDABLES:
Example, Nomenclature, P/N: N/A, CAGE: N/A, NIIN: N/A
CONSUMABLES:
Antifreeze, P/N: GG-T-250, CAGE: N/A, NIIN: N/A (or equivalent) Corrosion Preventative Compound NSN: 8030-01-631-4012 (Or equivalent) Fluid, Brake, P/N: N/A, CAGE: N/A, NIIN: N/A (As applicable to model) Fluid, Hydraulic, P/N: N/A, CAGE: N/A, NIIN: N/A (as applicable to model) Fluid, Power Steering, P/N: N/A, CAGE: N/A, NIIN: N/A (as applicable to model) Fluid, Transmission, P/N: N/A, CAGE: N/A, NIIN: N/A (as applicable to model) Oil, Engine, P/N: N/A, CAGE: N/A, NIIN: N/A (as applicable to model) Water, Distilled, P/N O-B-41 CAGE: N/A, NIIN: N/A (if required) A
PRELIMINARY STEPS
1. Verify OEM service/maintenance manual is accessible. 2. Ensure area is safe for maintenance.
MEWP BOOM LIFT
S00011.0
U.S. COAST GUARD
REV’D: 02/05/2026
CAUTION
DO NOT SPRAY DIRECTLY INTO LIGHTS, WIRING HARNESSES,
WIRE LOOM CONNECTORS, BEARINGS, AXLES, SHAFTS, ENGINE
COMPONENTS, OR EXHAUST SYSTEMS.
CAUTION
DO NOT DIRECT SPRAY AS TO REMOVE MARKINGS OR PAINT
FROM COMPONENTS.
NOTE: Support Equipment may be cleaned by any method or combination of processes that will not degrade components or systems. NOTE: Support Equipment washes are of concern due to the detergents or other cleaners that will end up in the water. Units shall be cognizant of federal, state, and local regulations for this effluent and utilize appropriate wash areas.
NOTE: Cleaning Compounds may contain phosphates and shall not be
The beginning of the document. Download the full file to read on.