0077 Missile Deck Redesign Statement of Work
Updated
A PDF document (402 KB) attached to Install C2F Campus Static Displays (Deterrence Park), from the Department of the Air Force. Due Nov 14, 2026, 11:00 PM (UTC-5).
File name: 20-0077 Missile Deck Redesign SOW 10-30-26.pdf
The full file is for paid members, or buy this bid alone.
Preview
STATEMENT OF WORK
FOR ARCHITECT-ENGINEER (A-E) SERVICES
OFFUTT AFB PROJECT:
SGBP 20-0077
TITLE: Install C2F Campus Static Displays (Deterrence Park) Building 1000
Offutt AFB, Nebraska
Oct. 30, 2026
1. SCOPE: The work covered by this Statement of Work (SOW) consists of furnishing all labor, equipment, and materials; performing all necessary travel and services required to compile engineering data; furnishing revised plans, revised specifications, and a revised cost estimate covering the work required for the investigation and design revisions for the title project. 2. ADMINISTRATIVE PROCEDURES: The A-E shall assign a Project Manager from their staff as a single point of contact for this project. The Contracting Officer or designated representative shall be advised, in writing, of any change in this appointment during the performance of this contract.
3. DESCRIPTION OF PROJECT:
Revise 2023 drawings, specifications and estimate to address geotechnical issues and revise project scope IAW this SOW.
4. DESCRIPTION OF WORK:
a.
General:
(1) The A-E shall perform all services required (including, testing and site investigation) to update and furnish complete construction documents consisting of contract drawings, technical specifications, design analysis/computations, cost estimate breakdown, and addenda as required, for the accomplishment of the project(s) in accordance with requirements of this Statement of Work. Minor changes will be included at no cost to the Government up to the 90% design. Changes because of error by the A-E shall be made at no additional cost to the government.
(2) The design activities of the A-E must be directed toward the efficient and economical use of architectural, engineering, and construction practices. (3) The A-E is responsible for providing a completely functional and operational project within the parameters of programming cost and scope of the construction project. The A-E must consider all design options and criteria reductions that may be required in those instances
55th Civil Engineer Squadron
where impending cost overruns are expected. This information will be included in the design analysis.
(a) Cost estimates for the contemplated work shall be furnished with the design submittals as required in this statement of work. The estimate shall have base bid and bid option 1 shown separately.
(b) The final estimate for the base bid shall not exceed $2,000,000. If base bid estimate exceeds this value, please promptly notify the CO. Good judgment and sound