Home / Waste Management Services / Document

2027 ISWM Performance Work Statement

Updated

A PDF document (427 KB) attached to Waste Management Services, from the Department of the Air Force. Due Nov 24, 2026, 12:00 PM (UTC-8).

File name: 2027 ISWM PWS.pdf

Download the full documentSee the bid

The full file is for paid members, or buy this bid alone.

Preview

Performance Work Statement (PWS)
Integrated Solid Waste Management Services

FA2816-27-CXXX

PERFORMANCE WORK STATEMENT (PWS)

FOR

INTEGRATED SOLID WASTE

MANAGEMENT SERVICES

LOS ANGELES AIR FORCE BASE

CALIFORNIA

Performance Work Statement (PWS)
Integrated Solid Waste Management Services

FA2816-27-CXXX

REVISION CONTROL

Revision Number

Date

Remarks

30 Jul 2026

This is the initial publication of the Integrated Solid Waste Management Services (ISWM) Performance
Work Statement (PWS).

Coordination:

Functional Services Manager
Mr. A. David Espili, 61 CELS/CD

Quality Assurance Program Coordinator
Andre Williams, SMC/PKE
IAW 5337.170- 2 Approval Requirements; a SDO signature is not required Service Determining Official

Contracting Officer
Dalice Va, SMC/AC PKE

Ruben Lopez
Anti Terrorism Program Manager

Performance Work Statement (PWS)
Integrated Solid Waste Management Services

FA2816-27-CXXX

1.

1.1.
1.2.
1.3.
1.4.
1.5.

2.

2.1.
2.2.
2.3.
2.4.

3.

4.

4.1.
4.2.
4.3.
4.4.
4.5.
4.6.
4.7.
4.8.
4.9.
4.10.
4.11.
4.12.
4.13.
4.14.

5.

Performance Work Statement (PWS)
Integrated Solid Waste Management Services

FA2816-27-CXXX

1.

DESCRIPTION OF SERVICES

The Contractor shall furnish all personnel, equipment, tools, materials, vehicles, supervision, and other items and services necessary to perform Integrated Solid Waste Management, Municipal Solid Waste (MSW) collection, and single stream (SS) recycling services at Los Angeles Air Force Base (LAAFB), El Segundo, CA. Perform to the standards outlined within this PWS as well as all local, state, and federal regulations. Estimated workload factors are in Appendix A - Estimated Workload Data and collection areas are in Appendix C - Maps and or Site Plans.
1.1.

COLLECTION REQUIREMENTS

Establish initial vehicle routes and collection schedules upon contract award. Initial vehicle routes and collection schedules are to be submitted to the Contracting Officer (CO) five (5) calendar days prior to start of contract performance. The Contractor may propose adjustments to the schedule at any time. As a minimum, the Contracting Officer Representative (COR) and Contractor will monitor fill capacities to determine if adjustments to container size, routes, or frequencies should be made to provide the minimum number of pickups necessary to maintain a healthy, vector free environment and prevent waste container overflow. No changes are allowed to the schedule or haul route without CO or COR coordination. When the Contractor

The beginning of the document. Download the full file to read on.

Other documents in this bid