SCOPE OF WORK (SOW)
1. General Information
Unit: USCGC Maple
Asset Type: CB-L
Hull Number:22355
Location of Work: 2301 E Fort Macon Rd. Atlantic Beach, NC. 28512 Period of Performance Dates: 10/25/26-11/15/26
Unit POC: MKC Rand Willette/813-997-6886/[email protected]
2. Background
While underway the 22355 received a code for low fuel rail pressure, Code MID:128 PID 164 FMI 1. Engine SN A1186212.
3. Scope of Work Requirements
3.1 Contractor Responsibilities:
- Provide all labor, materials, equipment, and supervision necessary to complete the work described. - Comply with all applicable USCG policies, manufacturer specifications, and regulatory requirements.
3.2 Specific Work Items:
Work Item 1 –
- Replace high pressure fuel pump, feed pump, fuel banjo, banjo gasket, fuel O-ring and injectors due to water contamination. Clean fuel cooler, and lines. Polish fuel.
4. Condition Found Report (CFR) Requirement
If additional discrepancies, deficiencies, or required repairs are identified that are outside the defined Scope of Work, the contractor shall: - Immediately notify the Unit POC.
- Submit a written Condition Found Report (CFR) detailing: • Description of discrepancy
• Recommended corrective action
• Parts and labor breakdown
• Cost estimate
• Impact to schedule
No additional work outside the approved Scope of Work shall be performed without written authorization from the Government. Unauthorized work will not be reimbursed.
5. Materials & Parts
- OEM parts required unless otherwise approved.
- Provide part numbers and specifications.
- All materials shall meet manufacturer and USCG standards.
6. Testing & Acceptance
- Conduct operational testing upon completion.
- Demonstrate proper functionality to USCG representative. - Provide written service report and warranty documentation. - Work considered complete upon Government acceptance.
7. Deliverables
- Itemized invoice
- Service report
- Parts list (with serial numbers if applicable)
- Warranty documentation (if applicable)
8. Environmental & Safety Compliance
- Proper disposal of hazardous materials.
- Spill prevention measures required.
- Compliance with all federal, state, and local regulations.