USCG 45665 (RB-M 45)
SPECIFICATION FOR DRYDOCK REPAIRS
FY2027
Developed By: Roberto Buendia
(Rev-0, 10 August 2026)
USCG 45665 (RB-M-45) DRYDOCK AVAILABILITY FY2027
ii
(Rev-0)
USCG 45665 (RB-M-45) DRYDOCK AVAILABILITY FY2027
REVISIONS RECORD
This page is used to record specification revisions, which may have occurred subsequent to a Revision 0 (Rev-0) package. Information listed is intended to provide contractors and field unit personnel a means to ensure all the current specification revision pages are present when reviewing or utilizing this specification package.
DATE
REV#
WORK
ITEM#
CHANGES MADE
NOTE : All work item and paragraph numbers listed above for a given revision correspond to same numbers in the previous revision. This revised specification is self-contained with all of the above listed changes incorporated.
iii
(Rev-0)
USCG 45665 (RB-M-45) DRYDOCK AVAILABILITY FY2027
CONSOLIDATED LIST OF REFERENCES
The below-listed documents form a part of this specification to the extent specified herein. Approval/publication dates or revision dates/numbers are also identified, to ensure that same document versions are used at the time of specification writing and during contract execution.
All Coast guard drawings, technical publications, and standard specifications will be provided to contractors by the Coast Guard at an appropriate time, or upon request, free of charge. Other Government documents may be accessed – free of charge – from links located on the SFLC website. Commercial sites provide access to their respective documents.
COAST GUARD DRAWINGS
Coast Guard Drawing 45 RB-M 084-002, Rev -, Docking Plan Coast Guard Drawing 45 RB-M 084-002, Rev –, Docking Plan Coast Guard Drawing 45 RB-M 110-001, Rev -, Hull Structure Coast Guard Drawing 45 RB-M 110-002, Rev -, Hull Structure Module A Coast Guard Drawing 45 RB-M 114-001, Rev -, Fendering Arrangement Coast Guard Drawing 45 RB-M 170-002, Rev B, Folding Mast Coast Guard Drawing 45 RB-M 185-001, Rev A, Auxiliary System Foundations Coast Guard Drawing 45 RBM 201-001, Rev B, Main Engine Arrangement Coast Guard Drawing 45 RBM 247-002, Rev -, Water Jet Propulsor Arrangement Coast Guard Drawing 45 RB-M 247-002, Rev -, Water Jet Propulsor Arrangement Coast Guard Drawing 45 RB-M 256-002, Rev -, Cooling System Propulsion Coast Guard Drawing 45 RB-M 261-001, Rev -, Fuel Supply System Schematic Coast Guard Drawing 45 RB-M 261-002, Rev -, Fuel Supply System Coast Guard Drawing 45 RB-M 261-004, Rev -, Fuel Supply System Tubes Coast Guard Drawing 45 RB-M 261-005, Rev -, Fuel Supply System - Pipe Assemblies
The beginning of the document. Download the full file to read on.