Schedule of Supplies and Services: USCG STA PUGET SOUND (55107) FY27 DRYDOCK REPAIRS Solicitation: 70Z04026QSBPL0015
The Contractor shall furnish all necessary labor, material, services, equipment, supplies, power, accessories, facilities and such other things as are necessary, except as otherwise specified, to perform dry-docking repairs and alterations to the vessel, in accordance with this solicitation and attached specifications. Failure to read the specifications in their entirety will not relieve the quoter from the responsibility for properly estimating the difficulty or price of successfully performing the work. Failure to do so will be at the quoter’s risk. Schedule of Supplies and Services:
To be filled out with a cost associated for each Definite CLIN and Option(s) CLIN with an overall total submitted on an Excel spreadsheet.
CLIN
DESCRIPTION
D-001
D-002
D-003
D-004
D-005
D-006
D-007
D-008
D-009
D-010
General Welding, Provide
Hull Plating, U/W Body, Inspect
Hull Plating, U/W Body, Ultrasonic Testing
Appendages, U/W, Leak Test
Accessible Spaces, Inspect
Mast, Inspect
Main Diesel Engine(s), Align
Exhaust Muffler(s), Clean and Inspect
Exhaust Piping, Clean and Inspect
Fuel Valves, Renew
Ship Service Diesel Generator (SSDG), Clean and
Inspect
Sea Valves, Renew
Sea Strainers, Duplex, All Sizes, Overhaul
Potable Water Tank, Clean and Inspect
Diesel Tanks, Refuel
Buoy Handling Equipment, Renew
Rub Rail, Fendering System, Remove, Inspect,
Install
Decks – Exterior (Buoy), Preserve 100 Percent
Decks - Exterior, Preserve, Non-Skid Broadcast Grit
System
Superstructure, Preserve, 100 Percent
Interior Hull Insulation, Inspect
Marine Chemist Services, Provide
Drydock
Temporary Services, Provide
Sea Trial Performance, Support, Provide
U/W Body, Preserve, 100 percent
Hull Plating Freeboard, Preserve, 100%
Tanks, MP Fuel Service, Clean and Inspect
Propeller Shafts, Remove, Inspect, and Install
Propellers, Remove, Inspect and Install
Standard Hoses, Renew
Rudder Assembly, Remove, Inspect and Reinstall
D-011
D-012
D-013
D-014
D-015
D-016
D-017
D-018
D-019
D-020
D-021
D-022
D-023
D-024
D-025
D-026
D-027
D-028
D-029
D-030
D-031
D-032
QUANTITY
UNIT
OF
ISSUE
JOB
JOB
JOB
JOB
JOB
JOB
JOB
JOB
JOB
JOB
JOB
JOB
JOB
JOB
JOB
JOB
JOB
JOB
JOB
JOB
JOB
JOB
The beginning of the document. Download the full file to read on.