81932 - Purchase Description - Faro Core 100M Scene Scanner
Updated
A PDF document (250 KB) attached to FARO Focus Core 100M Scanner, from the Department of the Air Force. Due Oct 29, 2026, 12:00 PM (UTC-4).
File name: 81932 - Purchase Description (PD) - Faro Core 100M Scene Scanner.pdf
The full file is for paid members, or buy this bid alone.
Preview
PURCHASE DESCRIPTION
FARO Focus Core 100M Scanner
DATE: 6 Aug 2026
1.0 DESCRIPTION. The Contractor shall provide to the 402d Maintenance Group (MXSG), Robins Air Force Base, all materials, parts, travel, tools, training, and labor necessary to deliver and setup the FARO Focus 100M Scanner. FARO Focus Core 100m USA with accompanying software, accessories, and training to the 402d Support Group (MXSG); Warner Robins Air Logistics Complex (WR-ALC) at Robins Air Force Base (AFB), Georgia.
1.1 All FARO Focus 100 Scanner will include:
1.1.1 FARO Focus Core 100M USA, Part # LS9-CU
1.1.2 Scanner Training, Part # TR-BL0SCN-POS
1.1.3 Focus Battery Power Block, Part # ACCS-PWR-0014
1.1.4 SCENE Subscription Perpetual, Part # SOFTD0900
1.1.5 Single User Hard Lock, Part # SOFTL0002
1.1.6 AS-BUILT SUITE SUB 3Y, Part# SSA0803-3Y
1.1.7 Network Soft Lock, Part#: SOFTL0003
1.2 Commercial Off the Shelf Manual. Contractor shall provide one (1) hardcopy and one (1) electronic copy of operation and maintenance manuals on all equipment delivered within seven (7) calendar days after inspection/acceptance of equipment. The manual shall include: technical information, specifications, operational instructions, drawings, schematics, equipment maintenance instructions, and/or any other applicable information such as a recommended spare parts list. All copies shall be legible and written in English. (CDRL A001 DI-TMSS-80527B Commercial Off-The-Shelf (COTS) Manuals and Associated Supplemental Data).
2.0 Service Support. The contractor shall provide incidental, instructor-led training for to 2 government personnel. The training must ensure that operators are proficient in the safe handling, operation, and data processing associated with the FARO Focus Scanner and its proprietary software.
2.1 Incidental, Instructor Led Training should include: 2.1.1 Location: Training shall be conducted in bldg. 321. 2.1.2 Duration: Training shall consist of a minimum of 16 hours of instruction in 2-days.
2.1.3 Timeline: Training must be completed within 30 days of successful delivery and acceptance of the FARO Focus Core 100M Scanner.
2.2 Delivery. Delivery is required for this purchase. The delivery location is equipped with a loading dock. The use of stairs or an elevator will not be necessary for delivery. There are no alternative payment methods for the shipment. The items do not require special packing, such as dry ice, but are very fragile and must be handled with care.
2.2.1 Government Representatives. The following individuals will serve as the
The beginning of the document. Download the full file to read on.
Other documents in this bid
- 81932 - Contract Data Requirements List A001 - COTS Manual Signed
- 81932 - Contract Data Requirements List A002 - EMS training Signed
- 81932 - Contract Data Requirements List A003 - Status Report EnMS Signed
- 81932 - Contract Data Requirements List A004 - Contractors Safety Plan Signed
- 81932 - Contract Data Requirements List A005 - Accident Incident Report