Home / Electronic Security Systems / Document

A.02 ICIDS Services Performance Work Statement Revised

Updated

A PDF document (438 KB) attached to Electronic Security Systems, from the Department of the Army. Due Nov 6, 2026, 12:00 PM (UTC-6).

File name: A.02 ICIDS Services PWS Revised 09.28.26.pdf

Download the full documentSee the bid

The full file is for paid members, or buy this bid alone.

Preview

PERFORMANCE WORK STATEMENT

09/28/2026
1.0 GENERAL DESCRIPTION.
1.1 Crane Army Ammunition Activity (CAAA) ICIDS. CAAA’s primary Electronic Security System (ESS) is the ICIDS version V / SMS, which is the DAQ Electronics’ SMS TM (DAQ) platform for Intrusion Detection Systems. The ICIDS-V component includes DAQ StarWatch’s Primary Monitory Cabinet (PMC), Remote Poller Mux (RPM) Cabinets, Operator Workstations (OPWS), Remote Status Monitor (RSM) (to include Anti-Poller RSM), Remote Data Collector (RADC), and software; approved sensors, wiring, and conduit. The CAAA IDS currently has 240 zones on the installation. These zones include headquarters buildings, Arms Ammunition and Explosives (AA&E) storage facilities, Document storage facilities (Secure Open Storage), and other types of zones.
1.2 CAAA’s Video Monitoring System. CAAA’s video system is a Bosch Video Management system.
1.3 CAAA’s Automated Gate systems. CAAA’s Automated Gate systems are a Tilt-AWay manufacture system. 1.4 Scope/Objective. The Contractor shall provide all necessary personnel, services and equipment to administer, maintain, repair, test, and install the Electronic Security Systems to include Intrusion Detection Systems (IDS) and Access Control Systems (ACS) on NWS Crane CAAA as provided in the attached ICIDS-V schematics to be provided to the awardee. The Contractor shall provide the necessary manpower and material required to perform the maintenance, diagnosis and replacement of IDS & ACS components, make adjustments, and conduct testing during scheduled or nonscheduled work hours. The Contractor shall maintain the entire ESS in an operational state of repair, 24/7. The Contractor shall also have the responsibility of installing, repairing, and maintaining the equipment, which comprises the complete CAAA Closed Circuit Television (CCTV) system to include the network devices, Servers, Clients, Cameras,
Uninterruptable Power Supplies (UPS), surge suppression, fiber optic and configuration of the access and distribution switches for both Security and Production related CCTV Systems. The performance objectives, performance standards, and acceptable quality level are listed in the Performance Requirements Summary (PRS) Attachment 1. The Contractor shall also provide all necessary personnel, services and equipment to administer, maintain, repair, and install the Automated Gate Systems. The contractor will also be responsible for maintaining the operation of AI phone systems located

The beginning of the document. Download the full file to read on.

Other documents in this bid