Home / CPMU - HRD Insertion Device / Document

A.2 Statement of Work

Updated

A PDF document (859 KB) attached to CPMU - HRD Insertion Device, from the Department of Energy. Due Oct 29, 2026, 4:00 PM (UTC-4).

File name: A.2 Statement of Work.pdf

Download the full documentSee the bid

The full file is for paid members, or buy this bid alone.

Preview

Cryogenic Permanent Magnet Undulator for the HRD Beamline Statement of Work (SOW)

ESH&Q RISK LEVEL: A-2

Reviewed and Approved By:
Prepared By:

Dean Hidas

NSLS-II Research Staff 6 Physics,

Approved By:

Jayce Blood

Manager, Subcontracts, PPM Procurement

Approved By:

Stephen Sherwood

NSLS-II Liaison Engineer

Approved By:

Robert Lee

NSLS-II ESH&Q Manager

Approved By:

Nicole Magliulo

NSLS-II Quality Assurance Engineer

Approved By:

Daniel Olds

NSLS-II HRD Lead Beamline Scientist

Approved By:

Timur Shaftan

NSLS-II Accelerator Division Director

List of Reviewers (not approving through SharePoint)
Reviewed By:

Alexander Chu

NSLS-II Mechanical / Project Engineer, Beamline Engineering

Reviewed By:

Toshi Tanabe

NSLS-II Insertion Devices Group Leader

Reviewed By:

Lacy Jones

NSLS-II Operations Engineer, NSLS-II Management

Reviewed By:

Eli Stavitski

NSLS-II NEXT-III Project Management

This information is controlled by the U.S. Department of Commerce Export Administration Regulations 15 CFR Parts 730-774 as EAR99 Technology.

PROJECT:

NATIONAL SYNCHROTRON LIGHT SOURCE II

BROOKHAVEN NATIONAL LABORATORY

BROOKHAVEN SCIENCE ASSOCIATES

UPTON, N.Y. 11973

Cryogenic Permanent Magnet Undulator for the HRD
Beamline
Version 1

NSLSII-6ID-SOW-003

15JUL2026

Statement of Work Number

Date

VERSION HISTORY LOG

VERSION

DESCRIPTION

DATE

WRITTEN BY

APPROVED BY

First release

15JUL2026

Dean A. Hidas

See cover page

PROJECT:

NATIONAL SYNCHROTRON LIGHT SOURCE II

BROOKHAVEN NATIONAL LABORATORY

BROOKHAVEN SCIENCE ASSOCIATES

UPTON, N.Y. 11973

Cryogenic Permanent Magnet Undulator for the HRD
Beamline
Version 1

NSLSII-6ID-SOW-003

15JUL2026

Statement of Work Number

Date

1.1
1.2

3.1
3.1.1
3.1.2
3.1.3
3.2
3.2.1
3.2.2
3.2.3
3.2.4
3.2.5
3.2.6
3.3
3.3.1
3.3.2
3.3.3
3.3.4
3.4
3.4.1
3.4.2
3.4.3
3.4.4
3.5
3.6
3.7
3.7.1
3.7.2
3.7.3
3.7.4
3.8

DESIGN REVIEW

The beginning of the document. Download the full file to read on.