CUI

DEFENSE LOGISTICS AGENCY

DISTRIBUTION 5430 MIFFLIN AVENUE

NEW CUMBERLAND, PENNSYLVANIA 17070-5008

October 27th, 2026

MEMORANDUM FOR RECORD

SUBJECT: STATEMENT OF WORK

REFERENCES: DDNV - FIVE-YEAR Independent Inspection Agency (IIA) facility requalification audit and DOT certification support.
1. Name of site where work is to be performed:
Site 1: 8000 Jefferson Davis Highway Building 66D
Richmond, Virginia 23297-5516
1. Scope of work to be accomplished/ Justification/ End results to be achieved The DLA Distribution Richmond Hydrostatic Testing Shop requires a mandatory on-site compliance audit to maintain its Department of Transportation (DOT) Pipeline and Hazardous Materials Safety Administration (PHMSA) Requalifier Identification Number (RIN) pursuant to 49 CFR § 107.805 and 49 CFR Part 180.

The facility’s current approval expires on January 31, 2027. Federal law mandates that an approved Independent Inspection Agency (IIA) conduct an on-site evaluation of our hydrostatic testing equipment, visual inspection tooling, pressure calibration systems, and technician competency every five years to issue an Independent Inspection Report (IIR) and formal Letter of Recommendation for approval. Inspection:
a. One-day onsite inspection.
b. The vendor will verify all required tooling and equipment needed to perform a proper visual inspection are present and in good working order.
c. Any equipment needing calibration will be verified to be current. d. Inspect and verify the hydrostatic test equipment is properly installed and capable of being operated to within 1% accuracy
Staff:
a. Verify all inspection staff is properly trained and capable of performing a DOT requalification in accordance with 49CFR, section 180.
b. Verify the staff is familiar with and have access to the standards and regulations relevant to the re-qualification inspection
Controlled by: DLA Distribution DLA
Distribution J7AB CUI
Category: PROCURE
Distribution/Dissemination Controls: FEDCON POC:
Samuel Tustin, 614.693.5233
CUI

CUI

Documentation:
a. Verify all required standards and regulations are current and present at the facility and are available to the staff during business hours
b. Upon request, provide any not in the client’s possession c. Provide all application documents needed for inclusion in the formal RIN application d. Assure the documents are properly completed and submitted after the successful inspection