eProject NO. 1904124
SPECIFICATIONS
FINAL SUBMISSION AUGUST 2026
Building 141 Replace Emergency Diesel Generator
At
Naval Submarine Base New London, Groton, CT
SUBMITTED BY:
Colby Company Engineering
47A York Street
Portland, ME 04101
A/E Contract Number: N40085-24-D-0047
PREPARED BY:
Architectural: Elizabeth Coronado, AIA, Colby Company Engineering Civil: Heather Smith, P.E., Colby Company Engineering
Electrical: Jason Beaulieu, P.E., Colby Company Engineering
APPROVED BY:
For Commander, NAVFAC Mid-Atlantic
Scot Deledda
B141 GENERATOR REPLACEMENT
NAVAL SUBMARINE BASE NEW LONDON
100% FINAL SUBMISSION
AUGUST 2026
PROJECT TABLE OF CONTENTS
DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS
00 01 15
LIST OF DRAWINGS
DIVISION 01 - GENERAL REQUIREMENTS
01 11 00
01 14 00
01 20 00
01 30 00
01 31 23.13 20
02/24, CHG 2: 05/26
11/22, CHG 5: 05/25
11/20, CHG 5: 02/25
11/20, CHG 5: 02/25
08/23, CHG 1: 02/24
01 32 17.00 20
01 33 00
01 35 26
01 42 00
01 45 00
01 45 35
01 50 00
08/18, CHG 4: 02/21
05/24, CHG 1: 05/25
08/23, CHG 3: 08/25
11/20, CHG 3: 08/24
01 57 19
01 74 19
08/22, CHG 2: 08/25
02/19, CHG 3: 11/21
01 78 00
01 78 23
01 78 24.00 20
05/19, CHG 1: 08/21
05/23, CHG 3: 05/26
05/23, CHG 1: 11/23
SUMMARY OF WORK
WORK RESTRICTIONS
PRICE AND PAYMENT PROCEDURES
ADMINISTRATIVE REQUIREMENTS
ELECTRONIC CONSTRUCTION AND FACILITY
SUPPORT CONTRACT MANAGEMENT SYSTEM
(eCMS)
COST-LOADED NETWORK ANALYSIS SCHEDULES
(NAS)
SUBMITTAL PROCEDURES
GOVERNMENTAL SAFETY REQUIREMENTS
SOURCES FOR REFERENCE PUBLICATIONS
QUALITY CONTROL
SPECIAL INSPECTIONS
TEMPORARY CONSTRUCTION FACILITIES AND
CONTROLS
TEMPORARY ENVIRONMENTAL CONTROLS
CONSTRUCTION WASTE MANAGEMENT AND
DISPOSAL
CLOSEOUT SUBMITTALS
OPERATION AND MAINTENANCE DATA
FACILITY DATA WORKBOOK (FDW)
DIVISION 02 - EXISTING CONDITIONS
02 41 00
02 82 00
02 83 00
DEMOLITION AND DECONSTRUCTION
ASBESTOS REMEDIATION
LEAD REMEDIATION
DIVISION 03 - CONCRETE
03 30 53
MISCELLANEOUS CAST-IN-PLACE CONCRETE
DIVISION 07 - THERMAL AND MOISTURE PROTECTION
07 92 00
JOINT SEALANTS
DIVISION 09 - FINISHES
09 29 00
09 51 00
09 90 00
08/24, CHG 1: 05/25 GYPSUM BOARD
ACOUSTICAL CEILINGS
PAINTS AND COATINGS
DIVISION 26 - ELECTRICAL
26 20 00
26 32 15
26 36 23
05/25, CHG 2: 02/26 INTERIOR DISTRIBUTION SYSTEM
ENGINE-GENERATOR SET STATIONARY
15-2500 KW, WITH AUXILIARIES
AUTOMATIC TRANSFER SWITCHES AND
BY-PASS/ISOLATION SWITCH
PROJECT TABLE OF CONTENTS Page 1
B141 GENERATOR REPLACEMENT
NAVAL SUBMARINE BASE NEW LONDON
100% FINAL SUBMISSION
AUGUST 2026
DIVISION 31 - EARTHWORK
31 00 00
EARTHWORK
DIVISION 33 - UTILITIES