Home / U.S. Army Contracting Command – Detroit Arsenal (ACC-DTA)… / Document

ACC-DTA Army Manufacturing Rodeo sUAS Manufacturing Rodeo CSO Process

Updated

A PDF document (221 KB) attached to U.S. Army Contracting Command – Detroit Arsenal (ACC-DTA) Army Manufacturing Rodeo: sUAS Manufacturing Rodeo, from the Department of the Army. Due Nov 18, 2026, 1:00 PM (UTC-6).

File name: ACC-DTA Army Manufacturing Rodeo sUAS Manufacturing Rodeo CSO Process.pdf

Download the full documentSee the bid

The full file is for paid members, or buy this bid alone.

Preview

UNCLASSIFIED

ACC-DTA

sUAS MANUFACTURING RODEO

U.S. ARMY

CONTRACTING

COMMAND

DETROIT ARSENAL

Mr. Jeffrey W. Edens – ACC-RRAD CCO

UNCLASSIFIED

16 NOV 2026

CUI

BRIEFING PURPOSE

▪ Subject: Process map and award schedule for Army Contracting Command – Detroit Arsenal (ACC-DTA) Commercial Solutions Opening (CSO) Army Manufacturing Rodeo: sUAS Manufacturing Rodeo ▪ Agenda:
– CSO Process & Detailed Timeline
– Desired Outcomes

ARMY CONTRACTING COMMAND- DETROIT ARSENAL

CUI

CUI

CSO PROCESS & DETAILED TIMELINE

 Phase 1: Solution Synopsis
 Submission Receipt Date: November 18, 2026
 Government Evaluation Period: November 18 - 20, 2026
 Outcome of this Phase: Initial screening & high-level technical feasibility review and selection of submissions for Phase 2.
 Phase 2: Request for Phase 2 Detailed Technical Submission on November 20, 2026  Submission Receipt Date: November 24, 2026
 Deadline for vendors who successfully passed Phase 1 to submit their Phase 2 submission.  Government Evaluation Period: November 24 - 30, 2026
 Outcome of this Phase: In-depth technical review complete and selection of submissions for Phase 3.  Phase 3: Request for Commercial Solutions Proposals (CSP) on November 30, 2026  Submission Receipt Date: December 7, 2026
 Finalists from Phase 2 are expected to submit proposals 7 days after the Phase 2 evaluation concludes.  Government Evaluation Period: December 7 - 18, 2026
 Outcome of this Phase: Target Contract Award Date: December 18, 2026 (dependent upon sufficient funding).

ARMY CONTRACTING COMMAND- DETROIT ARSENAL

CUI

CUI

CSO DESIRED OUTCOMES

Section 6.1.3 (sUAS Manufacturing & Platform Thresholds): – Outcome 1: Affordable Mass & Unit Cost Ceiling ($3,000) – Outcome 2: Domestic Supply Chain Assurance & Constraint Mitigation (integrating the supply chain constraint analysis, actionable plan, and adversary component exclusions) – Outcome 3: Lethality & Terminal Standoff Precision Strike (including GFE and MK118 integration) – Outcome 4: Contested Spectrum & EW/GNSS-Denied Survivability – Outcome 5: Scalable Control Ratio Architecture (1:20 GCS ratio) – Outcome 6: Open Architecture, Modularity, & Interoperability (MOSA, MAVLink-M, ATAK CoT, APEX/sUPI) ▪ Section 6.1.4 (Proving Ground, Stress-Testing, and Scaled Execution): – Outcome 1: Rapid Production Batch & GFE Ingestion (400 aircraft, 20 GCS, with 10% early delivery by 15 Feb 2027)
– Outcome 2: DCMA Physical Teardown & 100% CONUS Assembly Verification

The beginning of the document. Download the full file to read on.