ACC-DTA Army Manufacturing Rodeo sUAS Manufacturing Rodeo CSO Process
Updated
A PDF document (221 KB) attached to U.S. Army Contracting Command – Detroit Arsenal (ACC-DTA) Army Manufacturing Rodeo: sUAS Manufacturing Rodeo, from the Department of the Army. Due Nov 18, 2026, 1:00 PM (UTC-6).
File name: ACC-DTA Army Manufacturing Rodeo sUAS Manufacturing Rodeo CSO Process.pdf
The full file is for paid members, or buy this bid alone.
Preview
UNCLASSIFIED
ACC-DTA
sUAS MANUFACTURING RODEO
U.S. ARMY
CONTRACTING
COMMAND
DETROIT ARSENAL
Mr. Jeffrey W. Edens – ACC-RRAD CCO
UNCLASSIFIED
16 NOV 2026
CUI
BRIEFING PURPOSE
▪ Subject: Process map and award schedule for Army Contracting Command – Detroit Arsenal (ACC-DTA) Commercial Solutions Opening (CSO) Army Manufacturing Rodeo: sUAS Manufacturing Rodeo ▪ Agenda:
– CSO Process & Detailed Timeline
– Desired Outcomes
ARMY CONTRACTING COMMAND- DETROIT ARSENAL
CUI
CUI
CSO PROCESS & DETAILED TIMELINE
Phase 1: Solution Synopsis
Submission Receipt Date: November 18, 2026
Government Evaluation Period: November 18 - 20, 2026
Outcome of this Phase: Initial screening & high-level technical feasibility review and selection of submissions for Phase 2.
Phase 2: Request for Phase 2 Detailed Technical Submission on November 20, 2026 Submission Receipt Date: November 24, 2026
Deadline for vendors who successfully passed Phase 1 to submit their Phase 2 submission. Government Evaluation Period: November 24 - 30, 2026
Outcome of this Phase: In-depth technical review complete and selection of submissions for Phase 3. Phase 3: Request for Commercial Solutions Proposals (CSP) on November 30, 2026 Submission Receipt Date: December 7, 2026
Finalists from Phase 2 are expected to submit proposals 7 days after the Phase 2 evaluation concludes. Government Evaluation Period: December 7 - 18, 2026
Outcome of this Phase: Target Contract Award Date: December 18, 2026 (dependent upon sufficient funding).
ARMY CONTRACTING COMMAND- DETROIT ARSENAL
CUI
CUI
CSO DESIRED OUTCOMES
Section 6.1.3 (sUAS Manufacturing & Platform Thresholds): – Outcome 1: Affordable Mass & Unit Cost Ceiling ($3,000) – Outcome 2: Domestic Supply Chain Assurance & Constraint Mitigation (integrating the supply chain constraint analysis, actionable plan, and adversary component exclusions) – Outcome 3: Lethality & Terminal Standoff Precision Strike (including GFE and MK118 integration) – Outcome 4: Contested Spectrum & EW/GNSS-Denied Survivability – Outcome 5: Scalable Control Ratio Architecture (1:20 GCS ratio) – Outcome 6: Open Architecture, Modularity, & Interoperability (MOSA, MAVLink-M, ATAK CoT, APEX/sUPI) ▪ Section 6.1.4 (Proving Ground, Stress-Testing, and Scaled Execution): – Outcome 1: Rapid Production Batch & GFE Ingestion (400 aircraft, 20 GCS, with 10% early delivery by 15 Feb 2027)
– Outcome 2: DCMA Physical Teardown & 100% CONUS Assembly Verification
The beginning of the document. Download the full file to read on.