Advert Specifications Barataria Bay Waterway-Bar Channel-Maint Dredging Ed 26-028
Updated
A PDF document (2.0 MB) attached to Barataria Bay Waterway, Maintenance Dredging, Bar Channel, from the Department of the Army. Due Sep 16, 2028, 9:30 AM (UTC-5).
File name: Advert Specs Barataria Bay Waterway-Bar Channel-Maint Dredging Ed 26-028.pdf
The full file is for paid members, or buy this bid alone.
Preview
Section Table of Contents
SECTION 01 10 00 - GENERAL PROVISIONS
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
15.
16.
17.
18.
19.
20.
21.
22.
23.
24.
25.
26.
27.
28.
DAMAGE TO WORK
SAFETY PROVISIONS
RIGHTS-OF-WAY
SEAWORTHINESS CERTIFICATION
ACCOMMODATIONS AND MEALS FOR INSPECTORS
ENVIRONMENTAL LITIGATION
UTILITIES AND IMPROVEMENTS
EQUIPMENT OWNERSHIP AND OPERATING EXPENSE SCHEDULE
SIGNAL LIGHTS
STATE TAXES
FORMAT OF SURVEYS
ACCESS PLAN
SECURITY REQUIREMENTS
WORK IN THE VICINITY OF OTHER GOVERNMENT CONTRACTORS
CONTINUITY OF WORK
INSPECTION
SHOALING
FUEL CONSUMPTION REPORTING REQUIREMENTS
CONTRACT COORDINATION
CONTRACTOR’S RESPONSIBILITY
MOBILIZATION OF ATTENDANT PLANT
SUPERVISION
PRE-BID SITE VISIT
CONTRACTOR PERFORMANCE EVALUATIONS – CONSTRUCTION
REGULATORY REQUIREMENTS
DATUM RELATIONSHIPS
SEAGOING BARGE ACT
PROJECT SIGN
01 10 00-a
Ed 26-028
SECTION 01 10 00 - GENERAL PROVISIONS
1.
DAMAGE TO WORK
The responsibility for damage to any part of the permanent work shall be as set forth in the provision in Section 00 72 00 GENERAL CONDITIONS entitled PERMITS AND RESPONSIBILITIES (FAR 52.236-7). However, if, in the judgment of the Contracting Officer, any part of the permanent work performed by the Contractor is damaged by flood, earthquake, hurricane, or tornado which damage is not due to the failure of the Contractor to take reasonable precautions or to exercise sound engineering and construction practices in the conduct of the work, the Contractor shall make the repairs as ordered by the Contracting Officer and full compensation for such repairs will be made at the applicable contract unit price or job prices as fixed and established in the contract. If, in the opinion of the Contracting Officer, there is no contract unit or job prices applicable to any part of such work, an equitable adjustment shall be made pursuant to the provision in Section 00 72 00 GENERAL CONDITIONS entitled CHANGES (FAR 52.243-4). Except as herein provided, damage to all work (including temporary construction), utilities, materials, equipment and plant shall be repaired to the satisfaction of the Contracting Officer at the Contractor's expense, regardless of the cause of such damage.
2.
SAFETY PROVISIONS
The safety provisions as specified herein refer to the USACE Safety and Occupational Health Requirements EM 385-1-1 dated 15 March 2024. The most current edition can be found at:
https://www.publications.usace.army.mil/Portals/76/EM%20385-11%20_EFFECTIVE%2015March2024.pdf
The beginning of the document. Download the full file to read on.