Home / Barataria Bay Waterway, Maintenance Dredging, Bar Channel / Document

Advert Specifications Barataria Bay Waterway-Bar Channel-Maint Dredging Ed 26-028

Updated

A PDF document (2.0 MB) attached to Barataria Bay Waterway, Maintenance Dredging, Bar Channel, from the Department of the Army. Due Sep 16, 2028, 9:30 AM (UTC-5).

File name: Advert Specs Barataria Bay Waterway-Bar Channel-Maint Dredging Ed 26-028.pdf

Download the full documentSee the bid

The full file is for paid members, or buy this bid alone.

Preview

Section Table of Contents

SECTION 01 10 00 - GENERAL PROVISIONS

1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
15.
16.
17.
18.
19.
20.
21.
22.
23.
24.
25.
26.
27.
28.

DAMAGE TO WORK

SAFETY PROVISIONS

RIGHTS-OF-WAY

SEAWORTHINESS CERTIFICATION

ACCOMMODATIONS AND MEALS FOR INSPECTORS

ENVIRONMENTAL LITIGATION

UTILITIES AND IMPROVEMENTS

EQUIPMENT OWNERSHIP AND OPERATING EXPENSE SCHEDULE

SIGNAL LIGHTS

STATE TAXES

FORMAT OF SURVEYS

ACCESS PLAN

SECURITY REQUIREMENTS

WORK IN THE VICINITY OF OTHER GOVERNMENT CONTRACTORS

CONTINUITY OF WORK

INSPECTION

SHOALING

FUEL CONSUMPTION REPORTING REQUIREMENTS

CONTRACT COORDINATION

CONTRACTOR’S RESPONSIBILITY

MOBILIZATION OF ATTENDANT PLANT

SUPERVISION

PRE-BID SITE VISIT

CONTRACTOR PERFORMANCE EVALUATIONS – CONSTRUCTION

REGULATORY REQUIREMENTS

DATUM RELATIONSHIPS

SEAGOING BARGE ACT

PROJECT SIGN

01 10 00-a

Ed 26-028

SECTION 01 10 00 - GENERAL PROVISIONS

1.

DAMAGE TO WORK

The responsibility for damage to any part of the permanent work shall be as set forth in the provision in Section 00 72 00 GENERAL CONDITIONS entitled PERMITS AND RESPONSIBILITIES (FAR 52.236-7). However, if, in the judgment of the Contracting Officer, any part of the permanent work performed by the Contractor is damaged by flood, earthquake, hurricane, or tornado which damage is not due to the failure of the Contractor to take reasonable precautions or to exercise sound engineering and construction practices in the conduct of the work, the Contractor shall make the repairs as ordered by the Contracting Officer and full compensation for such repairs will be made at the applicable contract unit price or job prices as fixed and established in the contract. If, in the opinion of the Contracting Officer, there is no contract unit or job prices applicable to any part of such work, an equitable adjustment shall be made pursuant to the provision in Section 00 72 00 GENERAL CONDITIONS entitled CHANGES (FAR 52.243-4). Except as herein provided, damage to all work (including temporary construction), utilities, materials, equipment and plant shall be repaired to the satisfaction of the Contracting Officer at the Contractor's expense, regardless of the cause of such damage.

2.

SAFETY PROVISIONS

The safety provisions as specified herein refer to the USACE Safety and Occupational Health Requirements EM 385-1-1 dated 15 March 2024. The most current edition can be found at:
https://www.publications.usace.army.mil/Portals/76/EM%20385-11%20_EFFECTIVE%2015March2024.pdf

The beginning of the document. Download the full file to read on.

Other documents in this bid