AIRMUNITION SPECIFICATION

DATE: 06/24/2026

FD2020-26-50020

NSN: SEE ATTACHMENT

The contractor shall provide an advanced Report of Shipment (REPSHIP) to the consignee no later than 24 hours prior to the shipment arrival, and for ammunition shipments no later than two hours after shipment departure. A (REPSHIP) shall include all the following data in accordance with Attached REPSHIP.
1. Department of Defense Identification Code (DODIC): M688

2. Government Furnished Material: SEE ATTACHMENT

Stock Number:
Part Number:
Noun:
Quantity:
3. Ammunition lot numbering shall be accomplished. Reference MIL-STD-1168C for guidance. Each energetic ingredient and component used in production lot(s) shall be from a single material lot.
Ammunition Data Cards (ADC) shall be filled out; input in accordance with Attachment 2, Statement of Work – Ammunition Data Cards; and state quantity/serial number of lot acceptance test units in the remarks block. One hard copy of the ADC shall accompany shipments to each shipping location. CDRL (DIMISC-80043B) 4. Items shall be marked in accordance with CAD/PAD Item Marking Instruction Version 1.6, dated 6 March 2023, reference attachment.

5. Items are Inert.

6. Hazard Classification Information: See attached JHCS' and IHCs Hazard Class/Division:
Compatibility Group:

DOT Marking/EX Number:
DOT Shipping Labels
UN Number:
Proper Shipping Name:
Net Explosive Weight per item (NEW):
NEW Unit of Measurement:

7. All Engineering Change Proposals (ECPs), Notice of Revisions (NORs), and Request For Variances (RFVs formerly RFD/RFWs) affecting the approved product baseline configuration, acceptance test procedures, or manufacturing process of any item(s) on this contract shall be in accordance with EIA-649-1A. Major ECPs with NORs and Critical/Major RFVs shall be submitted to the responsible Government Engineering Authority for review/disposition by CCB. Minor/Administrative ECPs with NORs and Minor RFVs shall be processed by the: COGNIZANT GOVERNMENT ENGINEER /

ACO / CONTRACTOR

ECPs -- CDRL (DI-SESS-80639E)

NORs – CDRL (DI-SESS-80642E)

RFVs – CDRL (DI-SESS-80640E)

Distribution Statement: __B_, Reason: ___ Controlled Technical

Lot Acceptance Test Requirements are: IAW latest government approved ATP 8. The contractor shall furnish a Lot Acceptance Test/Inspection Report in the following system(s): WAWF

CDRL: (DI-NDTI-80809B)

9. LOT ACCEPTANCE TEST: In the event of an end item failure, the contractor shall notify the PCO/ACO and Air Force Engineering Organization within 1 business day.