SV0105-27 Aluminum Roll Q & A Amendment 0001
1. What is the max delivery order? There is no maximum; the contract will be filled utilizing multiple delivery orders over 2 years.
2. The roll will be too big for your maximum coil dimensions. Unicor does not need it in one roll; the contract will be filled utilizing multiple delivery orders over 2 years. Coil requirements remain:
Inside diameter: 16" minimum, 20" maximum.
Outside diameter: 48" maximum.
Coil weight: 2,500 lbs maximum.
3. The SF-1449 lists 1,500 employees for NAICS 331315, while the solicitation text identifies 1,400. Which size standard governs this acquisition? 1,400 employees is correct; our software does not have a selection for 1,400. 4. Thickness and width tolerances — The solicitation specifies 3105-H18 roll at 12" x .022" but states no thickness or width tolerance. Should offerors price and supply to the producing mill's standard published tolerances, or does UNICOR require a specific tolerance range for thickness and slit width? Yes, use the mill’s standard published tolerances. 5. Base-metal standard — No base-metal specification (e.g., ASTM B209) is cited for the 3105-H18 material. Will UNICOR confirm that standard commercial 3105-H18 coil meeting the mill's published specification is acceptable, or is conformance to a named ASTM standard required? The mill's published specification is acceptable.
6. Coating certification — The conversion coating must conform to ASTM B-921-02 Class 2 at 10-35 mg/ft2. What form of evidence does UNICOR expect with the offer or on delivery — a supplier certificate of conformance, a coating test report, or mill certification? Any of those will work.
7. The solicitation includes both FAR 52.216-2 (Economic Price Adjustment - Standard Supplies) and local clause FPI 1000H1 (PPI-based adjustment). Which one governs? Also, the PPI index is shown as PCU331315331315 in the header but PCU3313153313150 in FPI 1000H1. Please confirm the correct index. PCU3313153313150 is the correct index.
8. Section B identifies November 21, 2026, as the delivery date, although quotations are due November 20. Please confirm whether this is a placeholder and whether offerors should instead propose their achievable lead time after receipt of each delivery order. Yes, that was a placeholder. Please propose your delivery times in days after receipt of the order (ARO).
9. The solicitation includes both FAR 52.216-2 (Economic Price Adjustment - Standard