140FGA26Q0080
AMENDMENT 1
Patching and Reverse Capeseal Rattlesnake Hill Road at
Rocky Mountain Arsenal NWR
STATEMENT OF WORK
The U.S. Fish and Wildlife Service Project Lead (PL) for this requirement is:
The U.S. Fish and Wildlife Service Contracting Officer Representative (COR) for this requirement is:
Statement of Work – This Statement of Work (SOW) describes the general performance of the project and does not attempt to show the exact construction of the work in complete detail. The Contractor is responsible for providing high-quality completed work that maintains the performance intent established by this document.
Overview – The U.S. Fish and Wildlife Service (FWS) needs the Contractor to provide repairs to the entire Rattlesnake Hill Road (FWS Route 101) beginning at Havana Street to the large metal swing gate. This road is 0.75 miles of concrete asphalt. The road is 22.7 feet wide. The road is in poor condition and will require a reverse (or inverted) capeseal in place from start to finish. Reverse capeseal is a known technique where slurry is placed on the bottom layer, followed by chipseal and compaction. This project will also require approximately 338 square yards of asphalt patching.
140FGA26Q0080
AMENDMENT 1
Patching and Reverse Capeseal Rattlesnake Hill Road at
Rocky Mountain Arsenal NWR
Project Purpose – This project aims to repair all asphalt surfaces at the refuge’s Rattlesnake Hill Road.
140FGA26Q0080
AMENDMENT 1
Patching and Reverse Capeseal Rattlesnake Hill Road at
Rocky Mountain Arsenal NWR
Project Description / Scope of Work
RT#101, RATTLESNAKE HILL ROAD
Asphalt patching of approximately 338 square yards and reverse (or inverted) capeseal of 0.75 miles of the Rattlesnake Hill Road (FWS Route 101) from Havana Street to the large metal swing gate. This road is 0.75 miles of concrete asphalt. The road is 22.7 feet wide. For all patching, reference specifications for PATCHING within SECTION 321216 - ASPHALT PAVING attached. For reverse capesealing, reference EXECUTION within SECTION 321216 – ASPHALT PAVING specifically SURFACE PREPARATION, PLACING HOT MIX ASPHALT, and COMPACTION attached.
The road may be closed to all access for the duration of construction work. Contractor is responsible for developing a traffic control plan to ensure contractor and public safety during cracksealing operations. The Government may assist with roadway closure and access control. Any contractor traffic-control requirements shall be limited to those reasonably necessary for safe
The beginning of the document. Download the full file to read on.
Other documents in this bid
- Attachment 1-Statement of Work-R Capeseal Rattlesnake Hill Road 6pp Redacted
- Attachment 2-Specifications - R Capeseal Rattlesnake Hill Road 7pp
- Attachment 3-Wage Determination-Davis-Bacon Wage Determination 6pp
- Attachment 4: SectionB QuoteSchedule 1p
- Attachment 5: RelevantExperienceSurvey 4pp
- Sol
- Amd1 TC 0001
- Sol Amendment 0001