Amd2 Request for Information Q A 0002
Updated
A Word document (15 KB) attached to MN Fergus Falls WMD Prking Rehab, from the Departmental Offices. Due Nov 20, 2026, 3:00 PM (UTC-5).
File name: Amd2_RFI_Q_A_0002.docx
The full file is for paid members, or buy this bid alone.
Preview
1. Topographic & Site Boundary Surveys
Question: The RFP documentation includes existing conditions survey information. Is it the Government’s intent for the A-E firm to utilize these existing survey datasets as the base for design, or should offerors include a task scope and cost structure for performing new, complete topographic and boundary surveys for each site area (CLINs 00010–00050)? Answer – Please reference 'Phase 2-3 SOW_REV SEPT2026.pdf' specially Parts V.A.3.
2. Geotechnical Engineering & Testing Services
Question: Our preliminary technical approach includes geotechnical oversight and coordination. If award is made, will geotechnical investigation services (e.g., soil borings, pavement core sampling, percolation testing, and subgrade evaluations) be contracted directly by the Government/Owner, or is the A-E contractor expected to solicit, sub-contract, and manage all necessary geotechnical field investigations within this A-E design contract? Answer - The Government does not plan to directly contract geotechnical investigations outside this Contract. Reference 'Phase 2-3 SOW_REV SEPT2026.pdf' specially Parts V.A.4. 3. Project Footprint, Impervious Surface & Stormwater Management Question: Are the final design limits intended to match the existing spatial footprint of the current parking lot, overflow areas, driveways, and laydown areas? If the proposed design expands the impervious surface footprint beyond existing boundaries, will additional stormwater retention/detention and civil site drainage modeling be required as part of this scope? Answer - The Final Design limits will be determined by the EOR and if stormwater retention/detention is required per the Authorities with Jurisdiction/Permitting Agencies and/or EOR, EOR should perform such work as part of this Contract. Reference 'Phase 2-3 SOW_REV SEPT2026.pdf' specially Parts I.A for general project objectives.
The beginning of the document. Download the full file to read on.