Question/Clarification
Government Response
Shower configuration and drawings. Attachment 1, section 3.2, item 1.1 specifies a right drain for the 60x30 shower, but Attachment 4, cell D3 lists both a center drain and a left drain. Which configuration controls? Please provide the NextGen retrofit drawings referenced in Attachment 1 or confirm that the corrected written specifications contain all required dimensions and installation-interface requirements without those drawings.
See Amendment 1_70FB8027Q000000003 Attachment 1 Statement of Work for dimensions and installation interface requirements.
Accessories. For the 36x36 kit, Attachment 1, items 3.4-3.5 require a 42 x 74 inch curtain and a 37.5 inch rod; Attachment 4, D5 instead lists 66 x 74 inches and 59.5 inches. Attachment 4, D3 and D5 also list two grab bars described as 48 x 24 inches, whereas Attachment 1 requires two 24 inch bars for the 60x30 kit and one 24 inch plus one 12 inch bar for the 36x36 kit. Please confirm the controlling dimensions and quantities. Please also identify the required content of the soap dish, spring-clip wall hardware, 3 inch flange trim kit and installation materials listed only in Attachment 4, including whether these are See Amendment 1_70FB8027Q000000003 Attachment 1 Statement of Work for items separate accessories or included shower components.
specifications.
Pricing workbook and evaluation. Please issue a corrected Attachment 4 or instructions for completing it: H3:H6 have no base-extension formulas, J4 contains zero rather than an option shipping-price formula, and Q5 contains 15 rather than a quantity-times-price extension. Must offerors retain the 3.8%
option-price escalation formulas, or may each period be priced independently? A revised version of the Attachment 4 - Pricing Table is included under Amendment 1 Attachment 2, page 14 requires a six-month FAR 52.217-8 amount in the total evaluated _70FB8027Q00000003 Attachment 4 Pricing Table. The six-month option period pricing will price, but Attachment 4, D9 sums only the base and four options. Please specify how to calculated in accordance with Amendment 1_70FB8027Q000000003 Attachment 2 Terms and calculate and show that six-month amount for the stated supply quantities. Conditions Section II. Price (c).
Past performance instructions. Attachment 3, page 1 gives a November 13, 2026, 10:00 a.m. EST PPQ deadline and refers to work started within three years of synopsis issuance. Attachment 2, page 12
instead requires PPQs by the offer deadline, which the notice sets at 1:00 p.m. Eastern on A revised Attachment 3 - Past Performance Questionnaire is included under Amedment
The beginning of the document. Download the full file to read on.
Other documents in this bid
- Attachment 1: TTHU RETRO FIT SHOWER AND ACCESSORIES INSTALLATION KITS Statement of Work
- Attachment 3: Past Performance Questionnaire
- Attachment 2-Terms and Conditions
- Amendment 1: Attachment 3 Past Performance Questionnaire
- Amendment 1: Attachment 2 Terms and Conditions
- Amendment 1: Attachment 1 Statement of Work