Amendment 4: PPI Responses
Updated
A PDF document (293 KB) attached to P084 Next Generation Torpedo Integration Lab, Naval Station Newport, Newport RI, from the Department of the Navy. Due Nov 10, 2026, 2:00 PM (UTC-5).
File name: Amendment 0004 PPI Responses.pdf
The full file is for paid members, or buy this bid alone.
Preview
PPI
#
Page
Section
Paragraph
Question
Response
On drawing A-502
(Bldg P-084) Please
verify intent of Toilet
Room partition types:
T2, T3 & T4. Each
indicates we are to
install 5/8" Cement
Backer Board & 5/8"
GWB in same
locations. Is the intent
to install cement board
from slab to gypsum
ceiling & GWB from
dropped ceiling to
metal deck above.
Please clarify that
HP109 serves the
elevator machine room
as scheduled on dwg
M-604. Dwg. EP401
indicates that HP109 is
to be installed in
electrical room 109
instead of elevator
machine room 103.
(P-1016) Please clarify
dwg I-109 versus I101. The A3 elevations
do not appear to
match.
Cementitious backer board is
to be installed the height of
porcelain tile, to 6'-0" a.f.f.,
with 5/8" GWB from there to
underside of deck above.
Bldg P-1016 are you
going to provide a
specification for
cellphone lockers in
vestibule 101 as shown
on dwg I-109? Do you
want 24 or 25 lockers
(25 drawn, 24 stated)
The Basis of Design is
Salsbury Industries, surface
mounted cell phone storage
locker with 25 A Doors (24
usable)
A502
N/A
N/A
HP109/M604/E
P401
N/A
N/A
I109/I101
N/A
N/A
I109
N/A
N/A
The Page reference should
not include the heat pump
number.
As shown on dwg. MP101,
the location for HP109 is
Electrical Room 109.
Interior elevation A3/I-109 is
dimensionally accurate. The
two full height vertical lines
would not be included. The
finished wall surface would
be continuous.
P048
08 71 00
Section 08 71 00 does
not include a door
hardware schedule
required to determine
security interfaces and
door hardware
integration
requirements.
The door hardware schedule
is located on sheet A-601,
which includes door security
equipment and electrified
hardware.
Requested
Clarification
P084 and P1016
28 10 05
• Provide the complete
door hardware
schedule for Building
P084.
• Confirm all hardware
sets requiring security
system integration.
• Confirm all openings
requiring electrified
hardware and
associated security
devices.
Security detail sheets
provide multiple door
configurations;
however, floor plans
do not clearly identify
which detail applies to
each opening.
The door hardware schedule
is located on sheet A-601,
which includes door security
equipment and electrified
hardware.
Clarification
The beginning of the document. Download the full file to read on.
Other documents in this bid
- Attachment C- Construction Experience Project Data
- Attachment D- Past Performance Questionnaire
- Attachment E- Historical Small Business Utilization
- Attachment F-Small Business Participation Commitment
- Attachment G - Individual SB Subcontracting Plan
- Attachment H -Price Proposal Form
- Attachment I - SECNAV FORM 5512
- Attachment J - Wage Determination
- Solicitation
- Amendment 1
- Amendment 3
- Amendment 4